80GRC017C0008↗
Dynetics, Inc. received this contract vehicle from Nasa Glenn Research Center, National Aeronautics and Space Administration: $118.46M obligated so far for space vehicle components. It runs to 2028-09-30.
Key facts · data as of Nov 18, 2026
- Recipient
- Dynetics, Inc.
- Awarding agency
- National Aeronautics and Space Administration
- Contracting office
- Nasa Glenn Research Center (80GRC0)
- Obligated to date
- $118.46M
- Potential value
- $485.96M
- Ends
- 2028-09-30
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 18, 2026.
Cite this page: SpendQuery, Award 80GRC017C0008, data as of Nov 18, 2026, https://spendquery.com/award?id=CONT_IDV_80GRC017C0008_8000
Dynetics, Inc.: all federal awards · National Aeronautics and Space Administration: spending · Nasa Glenn Research Center: what it buys · The follow-on: recompete brief
IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED.
Up for re-bid: ends 2028-09-30. Recompete brief →
What it is
- Product or service
- Space Vehicle Components (PSC 1675)
- Industry
- Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing (NAICS 336419)
- Contracting office
- Nasa Glenn Research Center (80GRC0)
- Competition
- Full and open competition · 3 offers received
- Pricing
- Cost plus award fee
- How it was bought
- Contract vehicle (IDV) itself
- Solicitation
- NNC16ZMX004R
- Topics
- space_launch
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
20 subawards totaling $4.39M (3.7% of what was obligated), as Dynetics, Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| USA Machine Inc. | $2.25M | 5 | TX | 2025-12-17 | 2026-02-27 |
| Weldall MFG., Inc. | $925.4K | 3 | WI | 2025-12-10 | 2026-02-02 |
| Heilind Electronics, Inc. | $409.9K | 2 | MA | 2025-03-07 | 2025-10-09 |
| Intra Management Solutions, Inc. | $232.6K | 1 | TX | 2025-10-28 | 2025-10-28 |
| Futuramic Tool & Engineering Co | $141.8K | 1 | MI | 2025-11-26 | 2025-11-26 |
| Keystone Compliance LLC | $118.5K | 1 | PA | 2026-02-09 | 2026-02-09 |
| Tin-Mar, Inc. | $60.3K | 1 | AL | 2025-05-14 | 2025-05-14 |
| San Francisco Industrial, Inc. | $51.1K | 1 | GA | 2025-12-18 | 2025-12-18 |
| Goengineer LLC | $46.4K | 1 | UT | 2025-11-19 | 2025-11-19 |
| Applied Technical Services, LLC | $41.4K | 1 | GA | 2026-02-17 | 2026-02-17 |
| Apex Design Technology of Alabama LLC | $40.0K | 1 | AL | 2025-07-17 | 2025-07-17 |
| Graco Supply Company | $36.4K | 1 | TX | 2025-05-08 | 2025-05-08 |
| Heatcon, Inc. | $33.1K | 1 | WA | 2025-06-13 | 2025-06-13 |
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2025-12-18 | USA Machine Inc. | $1.98M | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-03-07 | Heilind Electronics, Inc. | $368.8K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2026-02-02 | Weldall MFG., Inc. | $357.5K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-12-10 | Weldall MFG., Inc. | $357.5K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-10-28 | Intra Management Solutions, Inc. | $232.6K | PROCURED GOODS AND/OR SERVICES BETWEEN 03-NOV-25 AND 06-APR-26 IN SUPPORT OF CONTRACT SOW. |
| 2026-01-06 | Weldall MFG., Inc. | $210.5K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-11-26 | Futuramic Tool & Engineering Co | $141.8K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2026-02-09 | Keystone Compliance LLC | $118.5K | PROCURED GOODS AND/OR SERVICES BETWEEN 09-FEB-26 AND 31-AUG-26 IN SUPPORT OF CONTRACT SOW. |
| 2025-12-17 | USA Machine Inc. | $93.2K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2026-02-12 | USA Machine Inc. | $85.8K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-05-14 | Tin-Mar, Inc. | $60.3K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2026-02-27 | USA Machine Inc. | $53.5K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-12-18 | San Francisco Industrial, Inc. | $51.1K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-11-19 | Goengineer LLC | $46.4K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2026-01-22 | USA Machine Inc. | $43.9K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2026-02-17 | Applied Technical Services, LLC | $41.4K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-10-09 | Heilind Electronics, Inc. | $41.1K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-07-17 | Apex Design Technology of Alabama LLC | $40.0K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-05-08 | Graco Supply Company | $36.4K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
| 2025-06-13 | Heatcon Composite Systems, Inc. | $33.1K | PROCURED GOODS AND/OR SERVICES BETWEEN 07-JUN-17 AND 30-SEP-28 IN SUPPORT OF CONTRACT SOW. |
Orders under this vehicle
4 orders worth $4.73M (current value). The largest:
- 80GRC020F0198 · $3.86M · ends 2021-06-25
- 80GRC025F7062 · $423.6K · ends 2026-01-31
- 80GRC019F0205 · $290.0K · ends 2020-04-10
- 80GRC025F7007 · $159.2K · ends 2025-12-01
Every action
61 actions since 2022-11-09. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-22 | P00147 | Funding only | $385.0K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2026-08-26 | P00146 | Funding only | -$1.20M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2026-05-21 | P00145 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2026-05-19 | P00144 | Funding only | -$40.0K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2026-02-25 | P00143 | Funding only | $1.50M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2026-02-12 | P00142 | Funding only | $1.00M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2026-01-09 | P00141 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-12-18 | P00140 | Funding only | $3.00M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-11-07 | P00139 | Funding only | $1.60M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT.. |
| 2025-10-23 | P00138 | Funding only | $200.0K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-09-29 | P00137 | Supplemental agreement (work within scope) | $97.0K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-09-20 | P00136 | Funding only | $676.4K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-09-05 | P00135 | Funding only | $14.00M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-07-26 | P00134 | Funding only | $2.55M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-07-10 | P00133 | Funding only | $3.65M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-05-13 | P00132 | Funding only | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-05-06 | P00131 | Supplemental agreement (work within scope) | $2.60M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-05-05 | P00130 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-04-03 | P00129 | Funding only | $500.0K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-03-31 | P00128 | Administrative change | $0 | REMOVAL OF CLAUSES/DRDS IAW [PCD 25-01, PCD 25-02] |
| 2025-03-13 | P00127 | Funding only | $197.6K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-02-14 | P00126 | Funding only | $6.00M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2025-01-24 | P00125 | Funding only | $4.85M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-12-19 | P00124 | Funding only | $1.94M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-11-29 | P00123 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-10-30 | P00122 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-10-22 | P00121 | Funding only | $5.75M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-09-26 | P00120 | Supplemental agreement (work within scope) | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-09-05 | P00119 | Funding only | $2.15M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-08-29 | P00118 | Supplemental agreement (work within scope) | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-08-06 | P00117 | Funding only | $190.0K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-07-12 | P00116 | Funding only | $9.00M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-06-27 | P00115 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-05-28 | P00114 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-04-30 | P00113 | Funding only | $3.23M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-04-04 | P00112 | Supplemental agreement (work within scope) | $1.40M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-03-06 | P00111 | Funding only | $2.49M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-02-23 | P00110 | Funding only | $3.76M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-02-22 | P00109 | Funding only | -$2.61M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-02-16 | P00108 | Funding only | -$150.0K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-01-19 | P00107 | Funding only | $1.32M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-01-12 | P00106 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2024-01-04 | P00105 | Supplemental agreement (work within scope) | $4.65M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-12-08 | P00104 | Administrative change | $1.55M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-11-20 | P00103 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-10-31 | P00102 | Funding only | $650.0K | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-10-26 | P00101 | Funding only | $3.20M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-09-12 | P00100 | Supplemental agreement (work within scope) | $4.69M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-08-24 | P00099 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-08-07 | P00098 | Funding only | $1.00M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-07-07 | P00097 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-06-12 | P00096 | Supplemental agreement (work within scope) | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-05-26 | P00095 | Funding only | $11.69M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-05-09 | P00094 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-04-12 | P00093 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-03-17 | P00092 | Funding only | $12.00M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2023-01-05 | P00091 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2022-12-12 | P00090 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2022-11-28 | P00089 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2022-11-21 | P00088 | Funding only | $9.00M | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
| 2022-11-09 | P00087 | Administrative change | $0 | EO14042 - NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-18). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗