CACI, Inc. - Federal received this contract vehicle from Nasa Johnson Space Center, National Aeronautics and Space Administration: $144.58M obligated so far for support- professional: engineering/technical. It runs to 2027-09-30.
Key facts · data as of Oct 22, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 22, 2026.
Cite this page: SpendQuery, Award 80JSC023DA010, data as of Oct 22, 2026, https://spendquery.com/award?id=CONT_IDV_80JSC023DA010_8000
CACI, Inc. - Federal: all federal awards · National Aeronautics and Space Administration: spending · Nasa Johnson Space Center: what it buys · The follow-on: recompete brief
SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER),
Up for re-bid: ends 2027-09-30. Recompete brief → · 80JSC023DA010, Simulation and Software Technology (SST) III Ceiling Increase ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
20 subawards totaling $14.45M (10.0% of what was obligated), as CACI, Inc. - Federal reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Qualified Technical Services Inc | $6.44M | 1 | TX | 2025-09-30 | 2025-09-30 |
| LZ Technology Inc | $3.97M | 1 | TX | 2025-10-01 | 2025-10-01 |
| Stellar Technology, LLC | $2.92M | 1 | TX | 2025-10-06 | 2025-10-06 |
| Trivad, Inc. | $448.8K | 2 | CA | 2025-06-04 | 2025-06-24 |
| Prairie View A&M University | $434.3K | 12 | TX | 2025-03-06 | 2025-10-27 |
| NGB Corp | $139.5K | 2 | NY | 2025-07-01 | 2025-07-31 |
| Sterling Computers Corporation | $95.8K | 1 | SD | 2025-07-31 | 2025-07-31 |
| Date | To | Amount | For |
|---|---|---|---|
| 2025-09-30 | Qualified Technical Services, Inc. | $6.44M | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-10-01 | LZ Technology, Inc. | $3.97M | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-10-06 | Stellar Technology, LLC | $2.92M | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-06-04 | Trivad, Inc. | $351.7K | SOFTWARE / FIRMWARE |
| 2025-06-24 | Trivad, Inc. | $97.1K | SOFTWARE / FIRMWARE |
| 2025-07-01 | NGB Corp | $97.0K | COMPUTER EQUIPMENT - SERVERS |
| 2025-07-31 | Sterling Computers Corporation | $95.8K | SOFTWARE / FIRMWARE |
| 2025-07-31 | NGB Corp | $42.5K | COMPUTER EQUIPMENT - SERVERS |
| 2025-10-27 | Prairie View A&M University | $40.2K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-10-27 | Prairie View A&M University | $40.2K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-10-27 | Prairie View A&M University | $40.2K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-03-06 | Prairie View A&M University | $39.3K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-03-06 | Prairie View A&M University | $39.3K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-04-14 | Prairie View A&M University | $34.1K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-04-14 | Prairie View A&M University | $34.1K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-04-15 | Prairie View A&M University | $34.1K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-04-17 | Prairie View A&M University | $34.1K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-04-16 | Prairie View A&M University | $34.1K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-04-17 | Prairie View A&M University | $34.1K | SUBCONTRACTOR - SERVICES / LABOR |
| 2025-04-17 | Prairie View A&M University | $30.3K | SUBCONTRACTOR - SERVICES / LABOR |
61 actions since 2023-02-07. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-22 | P00060 | Funding only | $2.61M | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-09-11 | P00059 | Funding only | $2.20M | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-09-08 | P00058 | Additional work (new agreement) | $0 | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-08-19 | P00057 | Funding only | $5.34M | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-07-24 | P00056 | Funding only | $476.7K | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-07-17 | P00055 | Funding only | $3.55M | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-06-15 | P00054 | Funding only | $3.02M | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-06-04 | P00053 | Administrative change | $0 | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-05-18 | P00052 | Funding only | $3.03M | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-05-05 | P00051 | Administrative change | $0 | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS.. |
| 2026-04-27 | P00050 | Administrative change | $1.30M | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE & FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, & AVIONICS SYSTEMS DIVISION & IS AVAILABLE TO OTHERS. |
| 2026-04-15 | P00049 | Funding only | $2.12M | SSTIII SUPPORT & RELATED SERVICES PRIMARILY FOR JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, & SIMULATION DIVISION, AEROSCIENCE AND FLIGHT MECHANICS DIVISION, PROPULSION & POWER DIVISION, AND AVIONICS SYSTEMS DIVISION. |
| 2026-04-10 | P00048 | Funding only | $1.17M | SSTIII SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JSC ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION, AEROSCIENCE AND FLIGHT MECHANICS DIVISION, PROPULSION AND POWER DIVISION, AND AVIONICS SYSTEMS DIVISION. |
| 2026-03-10 | P00047 | Funding only | $5.30M | UPDATE SECTION B.8 NFS CLAUSE 1852.232-81 CONTRACT FUNDING (JUNE 1990) FROM $114,473,735.38 TO $119,769,829.56 AN INCREASE OF $5,296,094.18. |
| 2026-02-17 | P00046 | Funding only | $150.2K | UPDATE SECTION B.8 NFS CLAUSE 1852.232-81 CONTRACT FUNDING (JUNE 1990) FROM $114,323,508.51, TO $114,473,735.38, AN INCREASE OF $150,226.87 |
| 2026-02-11 | P00045 | Funding only | $5.23M | UPDATE SECTION B.8 NFS CLAUSE 1852.232-81 CONTRACT FUNDING (JUNE 1990) FROM $109,098,086.60 TO $114,323,508.51, AN INCREASE OF $5,225,421.91. |
| 2025-12-09 | P00043 | Funding only | $4.70M | UPDATE SECTION B.8 NFS CLAUSE 1852.232-81 CONTRACT FUNDING (JUNE 1990) FROM $100,141,939.72 TO $104,843,663.19 , AN INCREASE OF $4,701,723.47 |
| 2025-11-20 | P00042 | Funding only | $3.48M | UPDATE SECTION B.8 NFS CLAUSE 1852.232-81 CONTRACT FUNDING (JUNE 1990) FROM $96,658,995.10 TO $100,141,939.72 , AN INCREASE OF $3,482,944.62 |
| 2025-11-13 | P00041 | Funding only | $270.7K | UPDATE SECTION B.8 NFS CLAUSE 1852.232-81 CONTRACT FUNDING (JUNE 1990) FROM $96,388,290.85 TO $96,658,995.10, AN INCREASE OF $270,704.25. |
| 2025-09-25 | P00040 | Funding only | $6.94M | UPDATE SECTION B.8 NFS CLAUSE 1852.232-81 CONTRACT FUNDING (JUNE 1990) FROM $89,446,989.04 TO $96,388,290.85, AN INCREASE OF $6,941,301.81. |
| 2025-09-10 | P00039 | Funding only | $1.45M | UPDATE SECTION B.8 NFS CLAUSE 1852.232-81 CONTRACT FUNDING (JUNE 1990) FROM $87,994,563.22 TO $89,446,989.04, AN INCREASE OF $1,452,425.82. |
| 2025-08-18 | P00038 | Administrative change | $0 | THE PURPOSE OF THIS MOD IS TO UPDATE THE CONTRACT ATTACHMENT ENTITLED, J-4 STANDARD LABOR CATEGORIES DESCRIPTIONS (SLC). ATTACHMENT, J-4 SLC IS HEREBY DELETED IN ITS ENTIRETY AND REPLACED WITH THE REVISED VERSION ATTACHED TO THIS MOD. |
| 2025-08-13 | P00037 | Administrative change | $0 | EXECUTIVE ORDERS (E.O.) 14173, 14168, 14148, AND 14057 / PCD 25-01 & PCD 25-02 |
| 2025-08-13 | P00036 | Funding only | $3.03M | UPDATE SECTION B.4 CONTRACT VALUE. DE-OBLIGATE FUNDS IN THE AMOUNT OF $(108,374.37). OBLIGATE FUNDS IN THE AMOUNT OF $3,137,390.04. AS A RESULT, THE TOTAL FUNDED AMOUNT IS INCREASED BY $3,029,015.67 FROM $84,965,547.55 TO $87,994,563.22. |
| 2025-07-28 | P00035 | Administrative change | $0 | UPDATE SECTION C - STATEMENT OF WORK, UPDATE SECTION I TO INCORPORATE NFS 1852.204-75 (SEP 1989), UPDATE SECTION I TO INCORPORATE NFS 1852.204-76 (DEVIATION 21-01B), AND ADD ATTACHMENT J-19 (DD 254) |
| 2025-07-14 | P00034 | Funding only | $3.26M | PROVIDE SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT. |
| 2025-06-17 | P00033 | Administrative change | $1.42M | PROVIDE SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT. |
| 2025-05-09 | P00032 | Administrative change | $8.18M | PROVIDE SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT. |
| 2025-04-08 | P00031 | Administrative change | $3.17M | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION B.4 CONTRACT VALUE TO THE CURRENT CONTRACT VALUE FOR TASK ORDERS 1-66, AND TO UPDATE THE TOTAL FUNDED AMOUNT BY $3,168,792.46 FROM $68,936,127.46 TO $72,104,919.92. |
| 2025-02-13 | P00030 | Administrative change | $3.17M | DE-OBLIGATE FUNDS IN THE AMOUNT OF ($78,502.89). OBLIGATE FUNDS IN THE AMOUNT OF $3,247,839.00. AS A RESULT, THE TOTAL FUNDED AMOUNT IS INCREASED BY $3,169,336.11 FROM $65,766,791.35 TO $68,936,127.46. UPDATE SECTION 8.8 IN ITS ENTIRETY. |
| 2025-02-13 | P00029 | Administrative change | $8.59M | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION B.4 CONTRACT VALUE TO REFLECT THE CURRENT CONTRACT VALUE AS OF THE DATE OF THIS MODIFICATION. UPDATE TO THE TOTAL FUNDED AMOUNT IS INCREASED BY $8,590,412.35 FROM $57,176,379.00 TO $65,766,791.35. |
| 2025-01-23 | P00028 | Administrative change | $0 | EXECUTIVE ORDER WHICH REPEALS EXECUTIVE ORDER 14035, DEIA IN THE FEDERAL WORKFORCE. REMOVED ATTACHMENT J-19: DE&I PLAN AND UPDATE ATTACHMENT J-1: DRD TO REMOVE DRD-18: DE&I PLAN |
| 2025-01-15 | P00044 | Funding only | $4.25M | UPDATE SECTION B.4 CV AND ITS ENTIRETY BY UPDATING TABLE 8.4.1. TO REFLECT THE CURRENT CONTRACT VALUE UPDATE SECTION B.8 NFS CLAUSE 1852.232-81 CONTRACT FUNDING (JUNE 1990) FROM $104,843,663.19 TO $109,098,086.60, AN INCREASE OF $4,254,423.41 |
| 2025-01-14 | P00027 | Administrative change | $421.9K | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS IN THE AMOUNT OF ($44,498.17) AND OBLIGATE FUNDS IN THE AMOUNT OF $466,368.72. AS A RESULT, THE TOTAL FUNDED AMOUNT IS INCREASED FROM $56,754,508.45 TO $57,176,379.00. |
| 2024-12-20 | P00026 | Administrative change | $2.93M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS IN THE AMOUNT OF $2,930,149.59. AS A RESULT THE TOTAL FUNDED AMOUNT IS INCREASED FROM $53,824,358.86 TO $56,754,508.45. |
| 2024-12-10 | P00025 | Administrative change | $1.80M | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE TOTAL FUNDED AMOUNT IS INCREASED BY $1,797,504.59 FROM $52,026,854.27 TO $53,824,358.86. |
| 2024-10-22 | P00024 | Administrative change | -$11.5K | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE TOTAL FUNDED AMOUNT DECREASED BY ($11,500.00) FROM $52,038,354.27 TO $52,026,854.27. |
| 2024-10-22 | P00023 | Administrative change | $5.08M | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE TOTAL FUNDED AMOUNT INCREASED BY $5,077,666.64. FROM $46,960,687.63 TO $52,038,354.27.UPDATE SECTION 8.8 IN ITS ENTIRETY. |
| 2024-10-22 | P00022 | Administrative change | $205.0K | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION B.4 CONTRACT VALUE, AND TO INCREASE THE TOTAL FUNDED AMOUNT BY $204,993.11 FROM $46,755,694.52 TO $46,960,687.63. UPDATE SECTION 8.8 IN ITS ENTIRETY. |
| 2024-10-21 | P00021 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CONTRACT CLAUSE G.3 NFS 1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY TO CLAUSE SECTION "INSTALLATION SERVICE FACILITIES." & TO UPDATE ATTACHMENT J-3 LIST OF APPLICABLE DOCUMENTS. |
| 2024-09-18 | P00020 | Funding only | $5.63M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER) |
| 2024-08-16 | P00019 | Funding only | $3.48M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER) |
| 2024-07-16 | P00018 | Funding only | $3.91M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER) |
| 2024-07-03 | P00017 | Supplemental agreement (work within scope) | $0 | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER) |
| 2024-06-06 | P00016 | Funding only | $1.78M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER) |
| 2024-05-08 | P00015 | Funding only | $6.49M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER) |
| 2024-04-09 | P00014 | Funding only | $3.27M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER) |
| 2024-03-07 | P00013 | Funding only | $3.76M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2024-03-06 | P00012 | Supplemental agreement (work within scope) | $0 | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2024-02-14 | P00011 | Funding only | $2.76M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2024-01-19 | P00010 | Funding only | $2.62M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-12-13 | P00009 | Funding only | $5.45M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-12-08 | P00008 | Funding only | -$405.0K | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-11-15 | P00007 | Funding only | $2.09M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-11-02 | P00006 | Administrative change | $0 | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-10-24 | P00005 | Funding only | $570.0K | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-09-28 | P00004 | Funding only | $64.0K | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-09-25 | P00003 | Funding only | $4.99M | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-09-07 | P00002 | Supplemental agreement (work within scope) | $0 | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-02-21 | P00001 | Administrative change | $0 | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
| 2023-02-07 | 0 | $299.6K | SIMULATION AND SOFTWARE TECHNOLOGY SUPPORT AND RELATED SERVICES PRIMARILY FOR NASA JOHNSON SPACE CENTER (JSC) ENGINEERING DIRECTORATE'S SOFTWARE, ROBOTICS, AND SIMULATION DIVISION (ER), |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-22). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗