89303320DEM000030↗
Central Plateau Cleanup Company, LLC received this contract vehicle from Hanford Field Office, Department of Energy: $0 obligated so far for maintenance of waste treatment and storage facilities. It runs to 2029-12-12.
Key facts · data as of Oct 25, 2026
- Recipient
- Central Plateau Cleanup Company, LLC
- Awarding agency
- Department of Energy
- Contracting office
- Hanford Field Office (893039)
- Obligated to date
- $0
- Potential value
- $10.00B
- Ends
- 2029-12-12
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.
Cite this page: SpendQuery, Award 89303320DEM000030, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_IDV_89303320DEM000030_8900
Central Plateau Cleanup Company, LLC: all federal awards · Department of Energy: spending · Hanford Field Office: what it buys
HANFORD CENTRAL PLATEAU CLEANUP CONTRACT PROCUREMENT
What it is
- Product or service
- Maintenance of Waste Treatment and Storage Facilities (PSC Z1PD)
- Industry
- Remediation Services (NAICS 562910)
- Contracting office
- Hanford Field Office (893039)
- Competition
- Full and open competition · 3 offers received
- Pricing
- Order dependent (set on each order)
- How it was bought
- Contract vehicle (IDV) itself
- Solicitation
- 89303318REM000008
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Orders under this vehicle
8 orders worth $3.82B (current value). The largest:
- 89303921FEM400037 · $1.73B · ends 2024-09-30
- 89303924FEM400054 · $1.62B · ends 2027-09-30
- 89303921FEM400029 · $397.16M · ends 2021-09-30
- 89303924FEM400053 · $53.26M · ends 2027-09-30
- 89303921FEM400038 · $12.80M · ends 2024-09-30
- 89303320FEM400139 · $5.42M · ends 2021-01-24
- 89303921FEM400036 · $2.65M · ends 2022-09-30
- 89303924FEM400059 · $1.84M · ends 2027-09-30
Every action
49 actions since 2022-10-21. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-17 | P00071 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS NO-COST MODIFICATION P00071 IS TO REVISE THE CENTRAL PLATEAU CLEANUP CONTRACT, SECTION G CONTRACT ADMINISTRATION DATA, SECTION I CONTRACT CLAUSES, AND ATTACHMENT J-10 CONTRACT DELIV |
| 2026-08-31 | P00070 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS NO-COST MODIFICATION P00070 IS TO REVISE THE CENTRAL PLATEAU CLEANUP CONTRACT, SECTION C PERFORMANCE WORK STATEMENT, ATTACHMENT J-2 REQUIREMENT SOURCES AND IMPLEMENTING DOCUMENTS |
| 2026-08-31 | P00068 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION H SPECIAL CONTRACT REQUIREMENTS. |
| 2026-08-20 | P00067 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS NO-COST MODIFICATION P00067 IS TO REVISE THE CENTRAL PLATEAU CLEANUP CONTRACT, SECTION I CONTRACT CLAUSES AND ATTACHMENT J-10 CONTRACT DELIVERABLES. |
| 2026-08-19 | P00069 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-2, REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS, TO IMPLEMENT PROJECT VELOCITY REVISIONS. LOCATION-RICHLAND, WASHINGTON |
| 2026-08-06 | P00066 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS NO-COST MODIFICATION P00066 IS TO REVISE THE CENTRAL PLATEAU CLEANUP CONTRACT, SECTION C PERFORMANCE WORK STATEMENT, SECTION H SPECIAL CONTRACT REQUIREMENTS, SECTION I CONTRACT |
| 2026-06-17 | P00065 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION I, CONTRACT CLAUSES TO INCORPORATE FAR 52.222-90 IN ACCORDANCE WITH EO 14398. |
| 2026-06-03 | P00064 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-9, WAGE DETERMINATIONS. |
| 2026-05-05 | P00063 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-2, REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS. |
| 2026-04-15 | P00061 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-2, REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS. |
| 2026-04-06 | P00062 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-3, HANFORD SITE SERVICES AND INTERFACE REQUIREMENTS MATRIX. |
| 2026-02-10 | P00060 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-2, REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS. |
| 2026-01-26 | P00059 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO UPDATE SECTIONS C, H, AND J ATTACHMENT J-8. |
| 2025-12-04 | P00058 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE ATTACHMENT J-6, MASTER SMALL BUSINESS SUBCONTRACTING PLAN. |
| 2025-11-24 | P00055 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION H, SPECIAL CONTRACT REQUIREMENTS. |
| 2025-09-02 | P00057 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE ATTACHMENT J-8, ADVANCE UNDERSTANDING ON COSTS. |
| 2025-07-16 | P00056 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE ATTACHMENT J-6, MASTER SMALL BUSINESS SUBCONTRACTING PLAN. |
| 2025-04-29 | P00054 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION B, SUPPLIES OR SERVICES AND PRICES/COSTS. |
| 2025-04-10 | P00053 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-2, REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS. |
| 2025-04-10 | P00052 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-9, WAGE DETERMINATIONS. |
| 2025-03-11 | P00051 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-3.A, HANFORD SITE SERVICES AND INTERFACE REQUIREMENTS MATRIX, AND J-8, ADVANCE UNDERSTANDING ON COSTS. |
| 2025-03-04 | P00049 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J, ATTACHMENT J-2, REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS, AND J-10, CONTRACT DELIVERABLES. |
| 2025-02-27 | P00050 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO REVISE CONTRACT SECTION B, SUPPLIES OR SERVICES AND PRICES/COSTS. |
| 2025-02-20 | P00048 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT: THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION H. |
| 2025-02-20 | P00046 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO REVISE CONTRACT SECTION C, PERFORMANCE WORK STATEMENT AND SECTION J, ATTACHMENT J-15, SAFE AND COMPLIANT BASE OPERATIONS TASK ORDER PACKAGE. |
| 2025-02-19 | P00047 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION H AND ATTACHMENT J-10. |
| 2025-02-03 | P00045 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CONTRACT SECTION I, CONTRACT CLAUSES, CLAUSE I.170, FAR 52.244-2 SUBCONTRACTS (OCT 2010) - ALT I (JUN 2007). |
| 2025-01-07 | P00044 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO REVISE ATTACHMENT J-12, CENTRAL PLATEAU CLEANUP CONTRACT STRUCTURE RESPONSIBILITY ASSIGNMENT MATRIX. |
| 2024-10-04 | P00043 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE MASTER CONTRACT SECTION C, SECTION G, ATTACHMENT J-1, & ATTACHMENT J-10 TO REMOVE REFERENCES TO RL AND/OR ORP, AND REPLACE WITH HFO. |
| 2024-09-30 | P00042 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE MASTER CONTRACT SECTION H, CLAUSES H.22 AND H.42 AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| 2024-07-24 | P00041 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE MASTER CONTRACT SECTION J, ATTACHMENT J-2, REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS, TO REFLECT CHANGES THAT HAVE OCCURRED SINCE THE PREVIOUS MODIFI |
| 2024-06-06 | P00036 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE MASTER CONTRACT SECTION J, ATTACHMENT J-10, CONTRACT DELIVERABLES, TO UPDATE DELIVERABLES BASED ON DISCUSSIONS WITH THE RL FINANCE DIVISION AND CPCCO IN AD |
| 2024-05-28 | P00039 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION J, ATTACHMENT J-8, ADVANCE UNDERSTANDING ON COSTS, AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| 2024-05-22 | P00040 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION J ATTACHMENT J-9, WAGE DETERMINATIONS, AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| 2024-05-13 | P00038 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION J ATTACHMENT J-3.A, HANFORD SITE SERVICES AND INTERFACE REQUIREMENTS MATRIX, AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| 2024-04-30 | P00037 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION H, SPECIAL CONTRACT REQUIREMENTS, CLAUSE H.5, DOE-H-2001 EMPLOYEE COMPENSATION: PAY AND BENEFITS (JUN 2022) |
| 2024-04-04 | P00035 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION C, PERFORMANCE WORK STATEMENT. |
| 2024-03-25 | P00034 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE MASTER CONTRACT SECTION J, ATTACHMENT J-6, MASTER SMALL BUSINESS SUBCONTRACTING PLAN (THE PLAN). |
| 2024-01-25 | P00033 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS NO COST MODIFICATION IS TO REVISE CENTRAL PLATEAU CLEANUP CONTRACT SECTION I AND ATTACHMENTS J-2, J-9, AND J-10. LOCATION - RICHLAND, WASHINGTON |
| 2024-01-25 | P00032 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS NO COST MODIFICATION IS TO REVISE CENTRAL PLATEAU CLEANUP CONTRACT ATTACHMENT J-3, HANFORD SITE SERVICES AND INTERFACE REQUIREMENTS MATRIX. LOCATION - RICHLAND, WASHINGTON |
| 2023-11-08 | P00031 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS NO COST MODIFICATION IS TO REVISE CENTRAL PLATEAU CLEANUP CONTRACT ATTACHMENT J-12, HANFORD STRUCTURE RESPONSIBILITY ASSIGNMENT MATRIX. LOCATION - RICHLAND, WASHINGTON |
| 2023-10-05 | P00029 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION (P00029) IS TO IS TO COMPLY WITH EXECUTIVE ORDER 14099 OF MAY 9, 2023. |
| 2023-07-06 | P00030 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO REVISE CENTRAL PLATEAU CLEANUP CONTRACT ATTACHMENT J-9, WAGE DETERMINATIONS. THIS MODIFICATION ALSO MAKES AN ADMINISTRATIVE CHANGE TO SECTION J-0, LIST OF ATTACHM |
| 2023-05-25 | P00020 | Supplemental agreement (work within scope) | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT MASTER: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE H.5 EMPLOYEE COMPENSATION: PAY AND BENEFITS. |
| 2023-03-17 | P00027 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - HANFORD CENTRAL PLATEAU CLEANUP CONTRACT THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION J, ATTACHMENT J 3, HANFORD SITE SERVICES, AND INTERFACE REQUIREMENTS MATRIX AND ADDS AN EDITED CLEAN REPLACEMENT |
| 2023-02-06 | P00028 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT- THIS MODIFICATION UPDATES CONTRACT SECTIONS H.22 RESPONSIBLE CORPORATE OFFICIAL AND CORPORATE BOARD OF DIRECTORS, AND H.42 KEY PERSONNEL. |
| 2022-12-21 | P00026 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - THIS MODIFICATION UPDATES CONTRACT TABLE J-10.1, DELIVERABLE M0004, MONTHLY PERFORMANCE REPORT, FROM THE 15TH TO THE 20TH OF EACH MONTH, AND UPDATES SECTION C.6.2.1, DELIVERY OF THE MONTHLY PERFORMANCE REPOR |
| 2022-12-14 | P00023 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT. THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION J, ATTACHMENT J 3, HANFORD SITE SERVICES, AND INTERFACE REQUIREMENTS MATRIX AND UPDATES INTERFACE 14, CYBER SECURITY CLASSIFIED AND UNCLASSIFIED CYBER SEC |
| 2022-10-21 | P00025 | Administrative change | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - THIS MODIFICATION CHANGES THE INVOICE APPROVING OFFICIAL FROM JENISE C. CONNERLY TO KELLY A. BRAZIL. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗