WASTE ISOLATION PILOT PLANT (WIPP) MANAGEMENT AND OPERATING (M&O) CONTRACT
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
2932 subawards totaling $185.42M (9.9% of what was obligated), as Salado Isolation Mining Contractors, LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Harrison Western Construction Corporation | $24.81M | 30 | CO | 2023-12-12 | 2025-02-26 |
| Tic - the Industrial Company | $19.58M | 30 | KS | 2023-03-15 | 2025-02-20 |
| Nucfil LLC | $16.15M | 147 | CO | 2023-03-06 | 2025-01-29 |
| Mirion Technologies (US), Inc. | $11.49M | 110 | CT | 2023-12-05 | 2025-01-28 |
| Technical Specialists LLP | $9.17M | 32 | NM | 2023-03-06 | 2025-01-23 |
| Komatsu Mining Corp. | $7.04M | 14 | WI | 2023-12-13 | 2024-12-16 |
| Parpal JV | $6.80M | 44 | NM | 2023-03-02 | 2025-01-28 |
| Avantech, LLC | $6.60M | 7 | SC | 2023-03-28 | 2024-10-07 |
| Edgewater Federal Solutions, Inc. | $5.56M | 39 | MD | 2023-03-13 | 2025-01-29 |
| CMX Services LLC | $5.33M | 24 | NM | 2023-03-15 | 2025-02-21 |
| Cementation USA Inc | $5.32M | 16 | UT | 2023-03-22 | 2025-01-06 |
| R-V Industries, Inc. | $4.63M | 12 | PA | 2024-01-30 | 2025-01-14 |
| V.J. Technologies, Inc | $4.09M | 93 | NY | 2023-03-06 | 2025-02-26 |
| Tfe, Inc | $4.05M | 65 | SC | 2023-03-07 | 2025-01-27 |
| Heritage Systems Engineering, LLC | $3.38M | 48 | TN | 2023-12-05 | 2025-01-06 |
| Electro-Mechanical, LLC | $2.46M | 5 | VA | 2023-12-05 | 2025-01-23 |
| Veritas Capital Fund Management, LLC | $2.37M | 11 | LA | 2023-12-05 | 2025-02-19 |
| Los Angeles Services LLC | $2.13M | 14 | NM | 2023-03-21 | 2025-01-30 |
| Udr-Edgewater Consulting LLC | $2.10M | 3 | SC | 2023-03-20 | 2024-01-24 |
| Westwind Computer Products, Inc. | $2.10M | 75 | NM | 2023-03-02 | 2025-02-25 |
| Information Systems Laboratories Inc | $1.32M | 15 | CA, ID | 2023-03-02 | 2025-01-22 |
| Minburn Technology Group, LLC | $1.31M | 3 | VA | 2024-05-23 | 2024-10-29 |
| Martin Marietta Materials, Inc | $1.28M | 9 | NC | 2023-03-14 | 2025-02-08 |
| PR Consultants Inc | $1.26M | 34 | NM | 2023-03-06 | 2025-02-20 |
| Konecranes Abp | $1.05M | 15 | WI | 2023-03-20 | 2025-04-01 |
The 25 largest of 320; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2024-03-27 | Cementation USA Inc | $10.56M | SALT LOADING POCKET CONSTRUCTION |
| 2025-02-20 | Harrison Western Construction Corporation | $6.97M | SHAFT MINING |
| 2024-11-20 | Harrison Western Construction Corporation | $6.80M | SHAFT MINING |
| 2024-12-03 | Komatsu Mining Corp. | $5.47M | DRUM TYPE CONTINUOUS MINING MACHIES |
| 2024-09-10 | Harrison Western Construction Corporation | $5.00M | SHAFT MINING |
| 2024-05-14 | Tic - the Industrial Company | $4.82M | SSCVS CONSTRUCTION |
| 2023-03-30 | Columbia Energy & Environmental Services, Inc. | $4.56M | SCA ANCILLARIES |
| 2024-06-03 | Parpal JV | $4.29M | INSTALL AIR INTAKE FANS FOR US SHAFT 5 |
| 2024-03-27 | Tic - the Industrial Company | $3.63M | SSCVS CONSTRUCTION |
| 2024-05-14 | Tic - the Industrial Company | $3.50M | SSCVS CONSTRUCTION |
| 2024-05-03 | Evco Partners LP | $3.38M | ELECTRICAL ITEMS |
| 2024-07-11 | Nucfil LLC | $3.34M | POCS |
| 2024-08-21 | Avantech, LLC | $3.28M | SWBS |
| 2024-01-30 | Nucfil LLC | $2.27M | POCS |
| 2024-03-29 | Tic - the Industrial Company | $2.13M | SSCVS CONSTRUCTION |
| 2024-01-31 | Nucfil LLC | $2.03M | CCOS |
| 2023-03-22 | Udr Consulting Inc | $1.98M | TEMPORARY SERVICE EMPLOYEES |
| 2024-09-30 | Avantech, LLC | $1.78M | 4 RAD AIR SAMPLING SKIDS |
| 2023-03-15 | CMX Services LLC | $1.78M | DESIGN AND BUILD A REPLACEMENT PUBLIC ADDRESS/ALARM SYSTEM |
| 2024-11-12 | Cementation USA Inc | $1.70M | SALT LOADING POCKET CONSTRUCTION |
| 2024-12-12 | Nucfil LLC | $1.68M | CCOS |
| 2025-01-23 | Electro-Mechanical, LLC | $1.63M | PORTABLE POWER CENTERS FOR THE UNDERGROUND MINING OPERATIONS |
| 2024-08-12 | Harrison Western Construction Corporation | $1.57M | SHAFT MINING |
| 2024-08-22 | Nucfil LLC | $1.54M | CCOS |
| 2025-01-06 | Cementation USA Inc | $1.50M | SALT LOADING POCKET CONSTRUCTION |
104 actions since 2023-02-07. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-29 | P00104 | Funding only | $1.09M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-09-17 | P00103 | Funding only | $5.1K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-09-02 | P00102 | Funding only | -$400.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-08-28 | P00101 | Funding only | $37.69M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-08-27 | P00100 | Change order | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-08-19 | P00099 | Change order | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-08-19 | P00098 | Funding only | -$8.19M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-07-23 | P00097 | Funding only | $13.79M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-06-25 | P00096 | Funding only | $1.11M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-06-10 | P00095 | Funding only | $301.7K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-06-02 | P00094 | Supplemental agreement (work within scope) | $0 | EO 14398 |
| 2026-05-19 | P00093 | Funding only | $2.34M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-04-29 | P00092 | Funding only | $162.80M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-03-31 | P00091 | Funding only | $17.99M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-03-13 | P00090 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-03-05 | P00089 | Funding only | $23.52M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-01-29 | P00088 | Funding only | $33.33M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2026-01-27 | P00087 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-12-18 | P00086 | Funding only | $96.15M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-12-01 | P00085 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-11-24 | P00084 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-11-07 | P00083 | Funding only | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-10-31 | P00082 | Funding only | -$620.8K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-10-27 | P00081 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-09-30 | P00080 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-09-25 | P00079 | Funding only | $24.50M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-09-16 | P00078 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-09-11 | P00077 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-09-04 | P00076 | Funding only | $17.45M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-07-23 | P00075 | Funding only | $192.20M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-07-14 | P00074 | Funding only | $1.65M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-07-09 | P00073 | Funding only | -$0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-06-30 | P00072 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-06-26 | P00071 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-06-25 | P00070 | Funding only | $40.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-06-17 | P00069 | Funding only | $19.39M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-06-03 | P00068 | Funding only | $22.00M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-05-05 | P00067 | Funding only | $21.54M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-04-29 | P00066 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-04-17 | P00065 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-04-16 | P00064 | Funding only | -$1.29M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-03-31 | P00063 | Funding only | $29.00M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-03-03 | P00062 | Funding only | $7.60M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-02-26 | P00061 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-02-11 | P00060 | Funding only | $6.60M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-02-06 | P00059 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-01-29 | P00058 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2025-01-15 | P00057 | Funding only | $72.27M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-12-19 | P00056 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-12-11 | P00055 | Funding only | $154.5K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-11-22 | P00054 | Funding only | $5.45M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-11-21 | P00053 | Funding only | $3.96M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-10-30 | P00052 | Funding only | $5.05M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-10-29 | P00051 | Funding only | $70.01M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-09-25 | P00050 | Funding only | $10.90M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-09-24 | P00049 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-09-23 | P00048 | Funding only | $12.17M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-08-29 | P00047 | Funding only | $59.15M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-08-15 | P00046 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-08-01 | P00045 | Funding only | $4.00M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-07-18 | P00044 | Funding only | $42.33M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-06-27 | P00043 | Funding only | $54.13M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-06-07 | P00042 | Funding only | -$1.29M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-05-29 | P00041 | Funding only | $34.34M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-05-16 | P00040 | Funding only | $2.62M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-05-02 | P00039 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-04-30 | P00038 | Funding only | $27.53M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-03-28 | P00037 | Funding only | $23.81M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-02-28 | P00036 | Funding only | $39.56M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-02-01 | P00035 | Funding only | $44.21M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2024-01-11 | P00034 | Funding only | $9.94M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-12-20 | P00033 | Supplemental agreement (work within scope) | $61.51M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-12-13 | P00032 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-11-30 | P00031 | Funding only | $8.45M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-11-29 | P00030 | Funding only | $10.44M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-11-16 | P00029 | Change order | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-11-06 | P00028 | Funding only | $340.6K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-11-02 | P00027 | Funding only | $65 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-10-31 | P00026 | Funding only | $10.64M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-10-16 | P00025 | Funding only | $36.32M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-09-28 | P00024 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-09-28 | P00023 | Funding only | $16.42M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-09-14 | P00022 | Funding only | -$8.00M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-09-13 | P00021 | Funding only | $8.90M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-08-18 | P00020 | Funding only | -$307.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-08-17 | P00019 | Funding only | $8.35M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-08-01 | P00018 | Funding only | $1.9K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-07-27 | P00017 | Funding only | $45.52M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-07-06 | P00016 | Funding only | $1.1K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-06-28 | P00015 | Funding only | $5.37M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-06-14 | P00014 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-05-31 | P00013 | Funding only | $21.15M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-05-18 | P00012 | Supplemental agreement (work within scope) | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-05-02 | P00011 | Funding only | -$80.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-04-17 | P00010 | Funding only | $157.80M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-04-12 | P00009 | Funding only | -$888.6K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-04-05 | P00008 | Funding only | -$1.10M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-03-31 | P00007 | Funding only | $7.2K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-03-27 | P00006 | Funding only | $32.64M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-03-16 | P00005 | Funding only | $57.02M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-03-03 | P00004 | Funding only | $67.78M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-02-17 | P00003 | Vendor ID or name changed | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-02-17 | P00002 | Funding only | $29.53M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| 2023-02-07 | P00001 | Funding only | $70.60M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗