NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES THE AWARD WILL PROVIDE A BROAD RANGE OF LAUNCH SERVICES FOR NASA'S PLANETARY, EARTH-OBSERVING, EXPLORATION, AND SCIENTIFIC SATELLITES. THE NLS CONTRACTS PROVIDE FOR A MINIMUM CAPABILITY OF DELIVERING AGENCY PAYLOADS WEIGHING APPROXIMATELY 550 POUNDS OR MORE TO A MINIMUM 124-MILE-HIGH CIRCULAR ORBIT WITH A LAUNCH INCLINATION OF 28.5 DEGREES. THE LAUNCH SERVICE PROVIDER ALSO MAY OFFER A RANGE OF VEHICLES TO NASA TO MEET HIGHER PAYLOAD WEIGHT AND ORBIT REQUIREMENTS.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
128 actions since 2022-10-26. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-28 | 347 | Funding only | $50.53M | NASA LAUNCH SERVICES (NLS) II - SPACEX |
| 2026-08-14 | 346 | Funding only | $2.1K | NASA LAUNCH SERVICES (NLS) II - SPACEX |
| 2026-08-13 | 345 | Funding only | $13.07M | NASA LAUNCH SERVICES (NLS) II |
| 2026-07-31 | 344 | Additional work (new agreement) | $0 | NASA LAUNCH SERVICES (NLS) II - SPACEX |
| 2026-07-27 | 343 | Funding only | $66.30M | NASA LAUNCH SERVICES (NLS) II - SPACEX |
| 2026-07-24 | 342 | Administrative change | $0 | NASA LAUNCH SERVICES (NLS) II - SPACEX |
| 2026-07-22 | 341 | Funding only | $8.65M | NASA LAUNCH SERVICES II (NLSII) - SPACEX MOD |
| 2026-07-15 | 340 | Administrative change | $0 | NASA LAUNCH SERVICES II (NLS II) - SPACEX |
| 2026-07-06 | 339 | Administrative change | $0 | NASA NLS II SPACEX MUSE ECT DUCT CLEANING. |
| 2026-06-23 | 338 | Administrative change | $27.04M | NASA LAUNCH SERVICES II - SPACEX |
| 2026-06-10 | 337 | Additional work (new agreement) | $793.6K | NASA LAUNCH SERVICES II - SPACEX |
| 2026-05-19 | 336 | Funding only | $24.73M | NASA LAUNCH SERVICES II - SPACEX |
| 2026-05-19 | 335 | Administrative change | $0 | NASA LAUNCH SERVICE TO SPACEX |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| 2026-04-09 | 334 | Funding only | $8.50M | NASA LAUNCH SERVICES II - SPACEX |
| 2026-04-01 | 333 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACEX |
| 2026-03-17 | 332 | Administrative change | $7.90M | NASA LAUNCH SERVICES II - SPACEX |
| 2026-03-10 | 331 | Funding only | $35.57M | NASA LAUNCH SERVICES II - SPACEX |
| 2026-03-09 | 330 | Funding only | -$785 | NASA LAUNCH SERVICES II - SPACEX |
| 2026-03-02 | 329 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX |
| 2026-02-17 | 328 | Funding only | $23.15M | NASA LAUNCH SERVICES II - SPACEX |
| 2026-01-21 | 327 | Funding only | $6.00M | NASA LAUNCH SERVICES II - SPACEX |
| 2026-01-12 | 326 | Funding only | $4.59M | NASA LAUNCH SERVICES II - SPACEX |
| 2026-01-05 | 325 | Supplemental agreement (work within scope) | $3.00M | NASA LAUNCH SERVICES II - SPACEX |
| 2025-12-19 | 324 | Funding only | $2.59M | NASA LAUNCH SERVICES II - SPACEX |
| 2025-12-12 | 323 | Administrative change | -$20.5K | NASA LAUNCH SERVICES II - SPACEX |
| 2025-11-24 | 322 | Funding only | $14.47M | NASA LAUNCH SERVICES II - SPACEX |
| 2025-11-06 | 321 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX |
| 2025-09-25 | 320 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX |
| 2025-09-25 | 319 | Funding only | $6.90M | NASA LAUNCH SERVICES II - SPACEX |
| 2025-09-17 | 318 | Administrative change | $65.20M | NASA LAUNCH SERVICES II - SPACEX |
| 2025-08-29 | 317 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX |
| 2025-08-25 | 316 | Administrative change | $60.20M | NASA LAUNCH SERVICES II - SPACEX |
| 2025-08-22 | 315 | Funding only | $4.21M | NASA LAUNCH SERVICES II - SPACEX - MOD 315. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND UPDATE JPSS-4 WORK PLAN. |
| 2025-07-21 | 314 | Funding only | $99.9K | NASA LAUNCH SERVICES II - SPACEX |
| 2025-07-15 | 313 | Funding only | $20.00M | NASA LAUNCH SERVICES II - SPACEX |
| 2025-07-11 | 312 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX |
| 2025-06-27 | 311 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX |
| 2025-06-18 | 310 | Funding only | $14.16M | NASA LAUNCH SERVICES II - SPACEX MOD 310. |
| 2025-06-11 | 309 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX |
| 2025-06-04 | 308 | Supplemental agreement (work within scope) | $13.00M | NASA LAUNCH SERVICES II - SPACEX |
| 2025-05-19 | 307 | Funding only | $5.76M | NASA LAUNCH SERVICES II - SPACEX |
| 2025-04-23 | 306 | Funding only | $1.00M | NASA LAUNCH SERVICES II - SPACEX THIS MODIFICATION INCREASES THE FUNDING AVAILABLE FOR PAYMENT BY $1,000,000. |
| 2025-04-22 | 305 | Administrative change | $0 | NASA LAUNCH SERVICES II |
| 2025-04-17 | 304 | Administrative change | $2.80M | NASA LAUNCH SERVICE II - SPACEX |
| 2025-03-28 | 303 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACEX |
| 2025-03-13 | 302 | Funding only | $10.56M | NASA LAUNCH SERVICES II - SPACEX THIS MODIFICATION INCREASES THE FUNDING AVAILABLE FOR PAYMENT BY $10,557,635. |
| 2025-02-21 | 301 | Supplemental agreement (work within scope) | $10.00M | NASA LAUNCH SERVICES II - SPACEX MOD 301: THIS ACTION PROVIDES FOR WITHIN SCOPE LAUNCH SERVICES. |
| 2025-02-18 | 300 | Administrative change | $3.55M | NASA LAUNCH SERVICES II- SPACEX MODIFICATION 300. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND DO AN ADMINISTRATIVE CHANGE. THIS MODIFICATION ALSO ADDS ADDITIONAL SCOPE TO ROMAN SPACE TELESCOPE MISSION. |
| 2025-01-31 | 299 | Funding only | $4.00M | NASA LAUNCH SERVICES II- SPACEX MODIFICATION 299. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| 2025-01-17 | 298 | Administrative change | $7.57M | NASA LAUNCH SERVICES II- SPACEX MODIFICATION 298. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND INCORPORATE A CREDIT FOR THE ROMAN SPACE TELESCOPE MISSION. |
| 2024-12-09 | 297 | Administrative change | $0 | NASA LAUNCH SERVICES II- SPACEX MODIFICATION 297. THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE LAUNCH DATE OF THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION AND UPDATE THE COMPTON SPECTROMETER AND IMAGER (COSI) WORK PLAN |
| 2024-11-25 | 296 | Supplemental agreement (work within scope) | $10.00M | NASA LAUNCH SERVICES II - SPACEX MOD 296: THIS ACTION PROVIDES FOR WITHIN SCOPE LAUNCH SERVICES. |
| 2024-11-18 | 295 | Administrative change | $0 | NASA LAUNCH SERVICES II- SPACEX MODIFICATION 295. THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE LAUNCH DATE OF THE HABITATION AND LOGISTICS OUTPOST (HALO)+POWER AND PROPULSION ELEMENT (PPE) MISSION. |
| 2024-10-23 | 294 | Administrative change | $1.04M | NASA LAUNCH SERVICES II- SPACEX MODIFICATION 294. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND DEFINITIZE NLSII-S-053. |
| 2024-09-30 | 293 | Administrative change | $400.3K | NASA LAUNCH SERVICES II - SPACEX MOD 293 THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND DEFINITIZE CONTRACT LINE ITEM NUMBER 10. (CLIN-10) |
| 2024-09-17 | 292 | Funding only | $65.13M | NASA LAUNCH SERVICES II - SPACEX MOD 292 THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND ADJUST THE FUNDED-THROUGH DATE ACCORDINGLY. |
| 2024-09-11 | 291 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX MOD 291 THE PURPOSE OF THIS MODIFICATION IS TO REMOVE MUS 3.0 FROM THE SENTINEL-6B MISSION. |
| 2024-08-27 | 290 | Funding only | $18.39M | NASA LAUNCH SERVICES II - SPACEX MOD 290 THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING |
| 2024-08-26 | 289 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX MOD 289: INCORPORATE THE INTERFACE CONTROL DOCUMENT (ICD) AND WAIVERS FOR PLANKTON, AEROSOL, CLOUD, OCEAN ECOSYSTEM (PACE) AND GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITE U (GOES-U) MISSIONS. |
| 2024-07-26 | 288 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX MOD 288 UPDATE MISSION SOLUTION, ADD MISSION UNIQUE SERVICES 22.0 AND 23.0 FOR THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION, INCORPORATE WORK PLAN CHANGES ON THE ROMAN SPACE TELESCOPE RST MISSION. |
| 2024-07-23 | 287 | Funding only | $14.11M | ASA LAUNCH SERVICES II - SPACEX MOD 287 THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE SUM AVAILABLE FOR PAYMENT AND INCORPORATE TASK ASSIGNMENT NLSII-S-051 BY REFERENCE. |
| 2024-07-22 | 286 | Supplemental agreement (work within scope) | $9.26M | NASA LAUNCH SERVICES II - SPACEX MOD 286 THIS ACTION PROVIDES FOR WITHIN SCOPE LAUNCH SERVICES. |
| 2024-07-02 | 285 | Supplemental agreement (work within scope) | $5.20M | NASA LAUNCH SERVICES II - SPACEX MOD 285 THIS ACTION PROVIDES FOR WITHIN SCOPE LAUNCH SERVICES. |
| 2024-06-20 | 284 | Administrative change | $4.72M | NASA LAUNCH SERVICES II - SPACEX MOD 284 THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE SUM AVAILABLE FOR PAYMENT BY $4,722,541 AND INCORPORATE TASK ASSIGNMENT NLSII-S-052 BY REFERENCE. |
| 2024-05-28 | 283 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX MOD 283 THE PURPOSE OF THIS MODIFICATION IS TO ADD OUT-YEAR NTE PRICING AND LABOR RATES, AND TO ACCELERATE THE SENTINEL-6B LAUNCH DATE BY ONE WEEK. |
| 2024-05-15 | 282 | Funding only | $22.50M | NASA LAUNCH SERVICES II - SPACEX MOD 282 THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR MAY 2024. |
| 2024-05-02 | 281 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX MOD 281 THE PURPOSE OF THIS MODIFICATION IS TO ADD MISSION UNIQUE SERVICE 13.0 FOR THE ROMAN SPACE TELESCOPE (RST) MISSION. |
| 2024-04-19 | 280 | Funding only | $12.54M | NASA LAUNCH SERVICES II - SPACEX MOD 280: THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE INCREMENTAL FUNDING AND ADJUST THE FUNDED-THROUGH DATE ACCORDINGLY. |
| 2024-04-11 | 279 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX MOD 279 THE PURPOSE OF THIS MODIFICATION IS TO ADD MISSION UNIQUE SERVICE 21.0 FOR THE IMAP MISSION. |
| 2024-04-11 | 278 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX MOD 278 THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE LAUNCH DATE FROM THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION AND DESCOPE MISSION UNIQUE SERVICE 15.0 FROM THE IMAP MISSION. |
| 2024-04-05 | 277 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX: THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE LAUNCH DATE FOR THE GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITE-U (GOES-U) MISSION FOR A CREDIT TO THE GOVERNMENT OF $260,000. |
| 2024-03-27 | 276 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX: THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE LAUNCH DATE FOR THE PLANKTON, AEROSOL, CLOUD, OCEAN ECOSYSTEM (PACE) MISSION. |
| 2024-03-12 | 275 | Funding only | $8.42M | NASA LAUNCH SERVICES II - SPACEX MOD 275: THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE INCREMENTAL FUNDING AND ADJUST THE FUNDED-THROUGH DATE ACCORDINGLY. |
| 2024-02-13 | 274 | Administrative change | $14.62M | NASA LAUNCH SERVICES II - SPACEX MOD 274: REMOVE MISSION UNIQUE SERVICE 20.0 FROM THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION AND OBLIGATE INCREMENTAL FUNDING. |
| 2024-02-09 | 273 | Administrative change | $212.1K | NASA LAUNCH SERVICES II - SPACEX MOD 273 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE BY REFERENCE THE PSYCHE ICD AND WAIVERS AND NLSII-S-049. |
| 2023-12-12 | 272 | Funding only | $8.68M | NASA LAUNCH SERVICES II - SPACEX MOD 272: THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE SUM AVAILABLE FOR PAYMENT ON MULTIPLE CONTRACT LINE ITEM NUMBERS. |
| 2023-12-12 | 271 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX: THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE LAUNCH DATE FOR THE PACE MISSION |
| 2023-12-12 | 270 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UPDATES TO THE WORK PLAN FOR THE HABITATION AND LOGISTICS OUTPOST (HALO) & POWER AND PROPULSION ELEMENT (PPE) MISSION. |
| 2023-12-11 | 269 | Funding only | $11.07M | NASA LAUNCH SERVICES II - SPACEX MOD 269: THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE SUM AVAILABLE FOR PAYMENT ON MULTIPLE CONTRACT LINE ITEM NUMBERS. |
| 2023-11-30 | 268 | Administrative change | -$333.6K | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE EXPIRING FUNDS AND DEFINITIZE TASK ASSIGNMENTS (TA)S NLS-S-041R2 AND NLS-S-046. |
| 2023-11-27 | 267 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO ADD A MISSION UNIQUE SERVICE FOR A HANGAR COOLING LOOP AND TO INCORPORATE WORK PLAN UPDATES TO THE HABITATION AND LOGISTICS OUTPOST (HALO) & POWER AND PROPULSION ELEMENT (PPE) MISSION. |
| 2023-11-22 | 266 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX ADD A MISSION UNIQUE SERVICE FOR A TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRSS) IMPLEMENTATION TO THE HABITATION AND LOGISTICS OUTPOST (HALO) & POWER AND PROPULSION ELEMENT (PPE) MISSION. |
| 2023-11-14 | 265 | Funding only | $8.66M | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE SUM AVAILABLE FOR PAYMENT. |
| 2023-11-07 | 264 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO ADD A MISSION UNIQUE SERVICE FOR A T-0 GN2 PURGE TO THE HABITATION AND LOGISTICS OUTPOST (HALO) & POWER AND PROPULSION ELEMENT (PPE) MISSION. |
| 2023-09-28 | 263 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO ADD A MISSION UNIQUE SERVICE (MUS) FOR CARRUTHERS AIRBORNE HEATER POWER TO THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION. |
| 2023-09-27 | 262 | Administrative change | $15.88M | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE SUM AVAILABLE FOR PAYMENT BY $15,879,013 AND INCORPORATE TASK ASSIGNMENTS NLSII-S-044, NLSII-S-044R1, AND NLSII-S-045 BY REFERENCE. |
| 2023-09-21 | 261 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO REMOVE MISSION UNIQUE SERVICE 4.0 AND CORRECT A ROUNDING ERROR IN THE ROMAN SPACE TELESCOPE LAUNCH SERVICE PAYMENT SCHEDULE. |
| 2023-09-21 | 260 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX MOD 260: ADD MISSION UNIQUE SERVICE FOR A MECHANICAL GROUND SUPPORT EQUIPMENT (MGSE) STAND TO THE HABITATION AND LOGISTICS OUTPOST (HALO) + POWER AND PROPULSION ELEMENT (PPE) MISSION. |
| 2023-09-11 | 259 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SOFTWARE LOCKDOWN LANGUAGE AND INCORPORATE FAR CLAUSE 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION. |
| 2023-09-05 | 258 | Administrative change | -$626.9K | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS AVAILABLE FOR PAYMENT. |
| 2023-09-05 | 257 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SOFTWARE LOCKDOWN LANGUAGE, ADD FALCON HEAVY SIDE BOOSTER CONVERSION LANGUAGE, AND UPDATE THE CONTRACT DATA REQUIREMENTS LIST. |
| 2023-08-21 | 256 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACEX THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE WORK PLAN AND LAUNCH SERVICE PAYMENT SCHEDULE FOR THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION. |
| 2023-08-16 | 255 | Funding only | $37.06M | NASA LAUNCH SERVICES II - SPACEX MOD 255: INCREASE THE FUNDS AVAILABLE FOR PAYMENT BY $37,056,254. |
| 2023-08-15 | 254 | Administrative change | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. PURGE GAS GRADE CHANGE FOR INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION. |
| 2023-08-10 | 253 | Administrative change | $0 | NASA LAUNCH SERVICES (NLS) II - EQUITABLE ADJUSTMENT DUE TO THE PSYCHE MISSION DELAY. |
| 2023-08-03 | 252 | Funding only | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION UPDATES A MISSION UNIQUE SERVICE AND OTHER DOCUMENTS FOR ROMAN SPACE TELESCOPE. |
| 2023-07-13 | 251 | Funding only | $26.79M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION INCREASES THE SUM AVAILABLE FOR PAYMENT BY $26,794,000. |
| 2023-07-10 | 250 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO REMOVE A MISSION UNIQUE SERVICE FROM THE SPECTRO-PHOTOMETER FOR THE HISTORY OF THE UNIVERSE, EPOCH OF RE-IONIZATION, AND ICES EXPLORER (SPHEREX)/ POLARIMETER TO UNIFY THE… |
| 2023-06-28 | 249 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO REMOVE A MISSION. |
| 2023-06-28 | 248 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. WORK PLAN UPDATE FOR HABITATION AND LOGISTICS OUTPOST + POWER AND PROPULSION ELEMENT (HALO+PPE) MISSION. |
| 2023-06-20 | 247 | Supplemental agreement (work within scope) | $4.55M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 247: UNILATERAL MODIFICATION PROVIDES INCREMENTALLY FUND CONTRACT FOR PAYMENT. |
| 2023-06-16 | 246 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 246: EXTEND THE NASA LAUNCH SERVICES II (NLS II) CONTRACT BY FIVE (5) YEARS AND INCREASE THE MAXIMUM QUANTITY OF LAUNCHES. |
| 2023-06-16 | 245 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 245: PARTIALLY REMOVE OF MISSION UNIQUE SERVICE (MUS) 5.0 |
| 2023-05-26 | 244 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 244: NO COST MODIFICATION TO UPDATE WORK PLAN AND CORRECT ADMINISTRATIVE ERROR. |
| 2023-05-16 | 243 | Supplemental agreement (work within scope) | $42.82M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS UNILATERAL MODIFICATION IS TO ADD INCREMENTAL FUNDING. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT. |
| 2023-04-24 | 242 | Supplemental agreement (work within scope) | $27.74M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 242: INCORPORATE TASK ASSIGNMENTS AND INCREASE FIRM FIXED PRICE OF CONTRACT. |
| 2023-04-20 | 241 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO INCORPORATE SURFACE WATER OBSERVATION TOPOGRAPHY (SWOT) INTERFACE CONTROL DOCUMENT (ICD) REVISION 5 AND WAIVERS. |
| 2023-04-07 | 240 | Funding only | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO ADD SCOPE TO THE GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITE-U MISSION. |
| 2023-03-31 | 239 | Funding only | -$8.16M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION DEOBLIGATES EXCESS FUNDING. |
| 2023-03-14 | 238 | Funding only | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO REMOVE SCOPE FROM THE GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITE-U (GOES-U) MISSION. |
| 2023-03-14 | 237 | Funding only | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION ADDS FIT CHECK AND SHOCK SEPARATION TEST FOR THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION. |
| 2023-03-13 | 236 | Funding only | $4.30M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS UNILATERAL MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE CONTRACT. EXCEPT AS PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS OF CONTRACT NNK10LB02B REMAIN UNCHANGED AND IN FULL FORCE AND… |
| 2023-02-15 | 235 | Funding only | $622.0K | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS UNILATERAL MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE CONTRACT. EXCEPT AS PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS OF CONTRACT NNK10LB02B REMAIN UNCHANGED AND IN FULL FORCE AND… |
| 2023-02-15 | 234 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS ACCOUNT FOR A LAUNCH DELAY FOR THE HABITATION AND LOGISTICS OUTPOST - POWER AND PROPULSION ELEMENT (HALO-PPE) MISSION. |
| 2023-01-30 | 233 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 233: THIS MODIFICATION IS TO DE-MANIFEST THE LUNAR TRAILBLAZER (LTB)AND SOLAR CRUISER (SC) SECONDARY MISSIONS FROM THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION. |
| 2023-01-23 | 232 | Funding only | $26.70M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 232: PROVIDES INCREMENTAL FUNDING TO CONTRACT LINE ITEM NUMBERS (CLIN)S 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, AND 14. |
| 2023-01-23 | 231 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO CHANGE TO PREFLOWN HARDWARE FOR THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION. |
| 2023-01-18 | 230 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO ADD A MISSION UNIQUE SERVICE (MUS) TO THE GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITE-U (GOES-U) MISSION. |
| 2023-01-12 | 229 | Supplemental agreement (work within scope) | $6.02M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 228: INCREASE THE SUM AVAILABLE FOR PAYMENT BY $6,024,890 AND INCORPORATE TASK ASSIGNMENT NLSII-S-041. |
| 2023-01-12 | 228 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 228: REVISE THE SURFACE WATER AND OCEAN TOPOGRAPHY (SWOT) LAUNCH DATE ON CONTRACT LINE ITEM NUMBER (CLIN)-3. |
| 2022-12-20 | 227 | Supplemental agreement (work within scope) | $10.90M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO ADD LAUNCH SERVICES. EXCEPT AS PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS OF CONTRACT NNK10LB02B REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT. |
| 2022-12-15 | 226 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. MOD 226: UPDATE THE WORK PLAN AND MILESTONE PAYMENT SCHEDULE FOR THE INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) MISSION. |
| 2022-12-14 | 225 | Funding only | $3.00M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. UNILATERAL MODIFICATION TO INCREMENTALLY FUND THE CONTRACT. EXCEPT AS PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS OF CONTRACT NNK10LB02B REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT. |
| 2022-12-12 | 224 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS BILATERAL MODIFICATION IS TO INCORPORATE THE SURFACE WATER AND OCEAN TOPOGRAPHY BASELINE LAUNCH SITE SUPPORT PLAN AND ITS ASSOCIATED AMENDMENT. |
| 2022-12-09 | 223 | Funding only | $4.28M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS UNILATERAL MODIFICATION IS TO INCREMENTALLY FUND THE CONTRACT AND EXTEND THE FUND THROUGH DATE. |
| 2022-12-05 | 222 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS NO COST BILATERAL MODIFICATION IS TO REFLECT THE NEW LAUNCH DATE FOR THE SURFACE WATER AND OCEAN TOPOGRAPHY (SWOT) MISSION FROM DECEMBER 5, 2022, TO DECEMBER 15, 2022. |
| 2022-11-14 | 221 | Supplemental agreement (work within scope) | $14.05M | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND INCORPORATED TASK ASSIGNMENT NLSII-S-040 BY REFERENCE. |
| 2022-10-26 | 220 | Supplemental agreement (work within scope) | $0 | NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES. THIS MODIFICATION IS TO ADJUST AN ELECTABLE REMOVE BY DATE FOR A MISSION UNIQUE SERVICE FOR THE GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITE - U (GOES-U) MISSION UNIQUE SERVICE (MUS). |