Research the market · bid results
Past bid results: what similar work went for
Every bidder and amount on past public bids, from the bid tabulations governments publish as open data. Price your bid against what won, see how many firms bid, and how far apart they were. These are bids as opened, not awards: the low bidder usually, not always, wins.
Try: janitorial · mowing · overlay · bridge · roof · HVAC · signal · striping
4,272 past solicitations: the low bid came in at a median 90% of the engineer's estimate (middle half 79%–100%); a median of 4 bidders; the second bid was typically 8% above the low one.
- FY 2025 GUARDRAIL REPAIRHouston District · Galveston County · Routine Maintenance Project - Sealed · opened May 13, 2025
Low bid $421.9K by ROY JORGENSEN ASSOCIATES, INC. · estimate $536.6K (79%) · 5 bids · range $421.9K–$676.6K
Every bid (5)
- ROY JORGENSEN ASSOCIATES, INC. $421.9K
- ROSS SA ENTERPRISE LLC $466.6K
- ISI CONTRACTING, INC. $582.9K
- ELITE KINGS CONSTRUCTION, LLC $621.6K
- RHINO EQUITY, LLC $676.6K
Source: TxDOT Bid Tabulations ↗ · project A00212070
- BPM 6479-24 Bridge Deck RepairHouston District · Waller County · Bridge Preventative Maintenance - Sealed · opened May 13, 2025
Low bid $776.7K by ISI CONTRACTING, INC. · estimate $812.5K (96%) · 6 bids · range $776.7K–$1.17M
Every bid (6)
- ISI CONTRACTING, INC. $776.7K
- CROSS PLUS CONSTRUCTION, LLC $812.4K
- GARRET SHIELDS INFRASTRUCTURE $845.6K
- MB WESTERN INDUSTRIAL CONTRACTING CO. $863.0K
- PREMIER CONTRACTORS LLC $969.5K
- MC2 CIVIL, LLC $1.17M
Source: TxDOT Bid Tabulations ↗ · project A00213834
- FY25 - Smith County Tree RemovalTyler District · Smith County · Routine Maintenance Project · opened May 13, 2025
Low bid $596.9K by SPEARHEAD CONSTRUCTION SOLUTIONS LLC · estimate $647.2K (92%) · 10 bids · range $596.9K–$959.6K
Every bid (10)
- SPEARHEAD CONSTRUCTION SOLUTIONS LLC $596.9K
- CEHAND SERVICES LLC $615.5K
- AUSTIN BARRICADE COMPANY, L.L.C. $642.7K
- K & R CONTRACTORS $680.4K
- RHINO EQUITY, LLC $686.8K
- ArborTrue LLC $754.3K
- ABESCAPE GROUP LLC $845.4K
- DREWERY CONSTRUCTION COMPANY, INCORPORATED $862.0K
- CATOCON, INC. $943.8K
- SHALOM SERVICES CORPORATION $959.6K
Source: TxDOT Bid Tabulations ↗ · project A00214608
- TRAFFIC SIGNAL MAINTENANCE (CALL-OUT) DWBrownwood District · Brown County · Routine Maintenance Project · opened May 8, 2025
Low bid $653.6K by WG ENGINEERING & CONSTRUCTION, LLC · estimate $525.1K (125%) · 1 bid
- Cable Barrier Repair 09 0725Dallas District · Ellis County · Routine Maintenance Project - Sealed · opened May 7, 2025
Low bid $557.5K by FIREMAN EXCAVATING, INC. · estimate $764.7K (73%) · 5 bids · range $557.5K–$1.47M
Every bid (5)
- FIREMAN EXCAVATING, INC. $557.5K
- BK FIELD OPERATIONS LLC $588.1K
- CROSS PLUS CONSTRUCTION, LLC $663.5K
- GRATIOT CONSTRUCTION, LTD. $719.5K
- MARCOM'S MOWING SERVICE, LLC $1.47M
Source: TxDOT Bid Tabulations ↗ · project A00211523
- Pavement Markings 09 1224Dallas District · Ellis County · Routine Maintenance Project - Sealed · opened May 7, 2025
Low bid $186.9K by TRP INFRASTRUCTURE SERVICES, LLC · estimate $279.5K (67%) · 8 bids · range $186.9K–$396.2K
Every bid (8)
- TRP INFRASTRUCTURE SERVICES, LLC $186.9K
- TRAFFIC HIGHWAY MAINTENANCE, LLC $193.0K
- STRIPE LINES, INC. $226.0K
- INTERSTATE BARRICADES & MARKINGS, INC. $241.3K
- GREY SKY CONSTRUCTION LLC $291.6K
- THE CONFIDENCE GROUP, INC $313.2K
- STRIPE-A-ZONE, LLC $369.6K
- GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY $396.2K
Source: TxDOT Bid Tabulations ↗ · project A00211542
- Tree Trimming and Brush Removal 07 0225Dallas District · Collin County · Routine Maintenance Project - Sealed · opened May 7, 2025
Low bid $79.8K by ICOS MANAGEMENT, LLC · estimate $97.4K (82%) · 7 bids · range $79.8K–$122.6K
Every bid (7)
- ICOS MANAGEMENT, LLC $79.8K
- SKYLINE CONSTRUCTION PAVING & STRIPING $101.6K
- SUNDROP GARDENS LANDSCAPING, LLC $106.8K
- ABESCAPE GROUP LLC $108.5K
- GV LANDSCAPE AND CONSTRUCTION LLC $115.4K
- EASTGATE SERVICES $115.5K
- ArborTrue LLC $122.6K
Source: TxDOT Bid Tabulations ↗ · project A00212642
- MBGF 07 0425Dallas District · Collin County · Routine Maintenance Project - Sealed · opened May 7, 2025
Low bid $596.3K by FIREMAN EXCAVATING, INC. · estimate $986.6K (60%) · 4 bids · range $596.3K–$1.18M
Every bid (4)
- FIREMAN EXCAVATING, INC. $596.3K
- BK FIELD OPERATIONS LLC $611.3K
- MARCOM'S MOWING SERVICE, LLC $762.2K
- SOUTHERN CROSS CONTRACTORS, LLC $1.18M
Source: TxDOT Bid Tabulations ↗ · project A00213486
- Cutback RC250 FY26Dallas District · Collin County · Material Maintenance Project · opened May 7, 2025
Low bid $41.8K by WRIGHT ASPHALT PRODUCTS COMPANY LLC · estimate $50.4K (83%) · 2 bids · range $41.8K–$43.8K
Every bid (2)
- WRIGHT ASPHALT PRODUCTS COMPANY LLC $41.8K
- MARTIN RESOURCE MANAGEMENT CORPORATION $43.8K
Source: TxDOT Bid Tabulations ↗ · project A00214357
- LRA FY25/26Dallas District · Collin County · Material Maintenance Project · opened May 7, 2025
Low bid $150.5K by MARTIN MARIETTA MATERIALS, INC. · estimate $117.5K (128%) · 2 bids · range $150.5K–$165.0K
Every bid (2)
- MARTIN MARIETTA MATERIALS, INC. $150.5K
- VULCAN CONSTRUCTION MATERIALS, LLC $165.0K
Source: TxDOT Bid Tabulations ↗ · project A00214367
- Flexible Pavement Str Repair 01 0525Dallas District · Navarro County · Routine Maintenance Project - Sealed · opened May 7, 2025
Low bid $924.0K by TEXAS MATERIALS GROUP, INC. · estimate $843.4K (110%) · 4 bids · range $924.0K–$1.17M
Every bid (4)
- TEXAS MATERIALS GROUP, INC. $924.0K
- KNIFE RIVER CORPORATION - SOUTH $1.03M
- FOUTSCO PAVING COMPANY, LLC $1.07M
- PEACHTREE CONSTRUCTION, LTD. $1.17M
Source: TxDOT Bid Tabulations ↗ · project A00214386
- Roadside Mowing 09 0525Dallas District · Ellis County · Routine Maintenance Project - Sealed · opened May 7, 2025
Low bid $336.7K by CEN-TEX IRRIGATION SYSTEMS, INC. · estimate $525.3K (64%) · 6 bids · range $336.7K–$517.3K
Every bid (6)
- CEN-TEX IRRIGATION SYSTEMS, INC. $336.7K
- PREMIER CONTRACTORS LLC $341.6K
- GARRET SHIELDS INFRASTRUCTURE $382.1K
- CROSS PLUS CONSTRUCTION, LLC $396.7K
- ABESCAPE GROUP LLC $472.3K
- ANTHONY SERVICES $517.3K
Source: TxDOT Bid Tabulations ↗ · project A00214533
- BPM Erosion Repairs FY 25Yoakum District · Gonzales County · Bridge Preventative Maintenance - Sealed · opened May 6, 2025
Low bid $388.6K by BK FIELD OPERATIONS LLC · estimate $577.4K (67%) · 5 bids · range $388.6K–$569.9K
Every bid (5)
- BK FIELD OPERATIONS LLC $388.6K
- CRACKSEAL OF TEXAS, LLC $402.3K
- SHALOM SERVICES CORPORATION $464.5K
- ICOS MANAGEMENT, LLC $512.9K
- MB WESTERN INDUSTRIAL CONTRACTING CO. $569.9K
Source: TxDOT Bid Tabulations ↗ · project A00207878
- FY25 - Freestone IH 45 BPM - 05Bryan District · Freestone County · Bridge Preventative Maintenance - Sealed · opened May 6, 2025
Low bid $422.3K by BK FIELD OPERATIONS LLC · estimate $747.8K (56%) · 12 bids · range $422.3K–$769.1K
Every bid (12)
- BK FIELD OPERATIONS LLC $422.3K
- GARRET SHIELDS INFRASTRUCTURE $467.3K
- BECK-REIT & SONS, LTD. $481.4K
- ROY JORGENSEN ASSOCIATES, INC. $559.9K
- PREMIER CONTRACTORS LLC $567.3K
- CROSS PLUS CONSTRUCTION, LLC $576.1K
- STRUCTURAL INTEGRITY GROUP LLC $591.2K
- BLACKSMITH VENTURES LLC $618.0K
- RHINO EQUITY, LLC $625.6K
- PATHFIELD INVESTMENTS LLC $657.6K
- ICOS MANAGEMENT, LLC $683.4K
- IBCTX, LLC $769.1K
Source: TxDOT Bid Tabulations ↗ · project A00213949
- FY25 Bryan AO RC-250 - 05Bryan District · Brazos County · Material Maintenance Project · opened May 6, 2025
Low bid $83.5K by WRIGHT ASPHALT PRODUCTS COMPANY LLC · estimate $96.0K (87%) · 2 bids · range $83.5K–$84.2K
Every bid (2)
- WRIGHT ASPHALT PRODUCTS COMPANY LLC $83.5K
- MARTIN RESOURCE MANAGEMENT CORPORATION $84.2K
Source: TxDOT Bid Tabulations ↗ · project A00214868
- FY25 Huntsville AO RC-250 - 05Bryan District · Walker County · Material Maintenance Project · opened May 6, 2025
Low bid $111.4K by WRIGHT ASPHALT PRODUCTS COMPANY LLC · estimate $128.0K (87%) · 2 bids · range $111.4K–$114.9K
Every bid (2)
- WRIGHT ASPHALT PRODUCTS COMPANY LLC $111.4K
- MARTIN RESOURCE MANAGEMENT CORPORATION $114.9K
Source: TxDOT Bid Tabulations ↗ · project A00214869
- FY26 - Brenham AO Spot MillBryan District · Washington County · Routine Maintenance Project - Sealed · opened May 6, 2025
Low bid $733.5K by CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. · estimate $788.5K (93%) · 4 bids · range $733.5K–$901.6K
Every bid (4)
- CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. $733.5K
- KNIFE RIVER CORPORATION - SOUTH $798.3K
- BIG CREEK CONSTRUCTION, LTD. $860.3K
- TEXAS MATERIALS GROUP, INC. $901.6K
Source: TxDOT Bid Tabulations ↗ · project A00214912
- AAO Picnic Area MaintenanceEl Paso District · Brewster County · Routine Maintenance Project · opened May 5, 2025
Low bid $77.3K by C&C SOSA COMPANY, LLC · estimate $81.4K (95%) · 1 bid
- Flexible BaseEl Paso District · Culberson County · Material Maintenance Project · opened May 5, 2025
Low bid $175.8K by SOUTHERN SOURCING SOLUTIONS, LLC · estimate $206.8K (85%) · 3 bids · range $175.8K–$220.2K
Every bid (3)
- SOUTHERN SOURCING SOLUTIONS, LLC $175.8K
- TOUCHSTONE RESOURCES, LLC $194.5K
- JOBE MATERIALS, L.P. $220.2K
Source: TxDOT Bid Tabulations ↗ · project A00213448
- FM 547 FROM US 380 TO FM 6Dallas District · Collin County · Rehabilitation of Existing Road · opened May 2, 2025
Low bid $16.42M by A. K. GILLIS & SONS, LLC · estimate $22.96M (72%) · 8 bids · range $16.42M–$24.36M
Every bid (8)
- A. K. GILLIS & SONS, LLC $16.42M
- D. L. LENNON INCORPORATED - CONTRACTOR $16.65M
- AUSTIN BRIDGE & ROAD SERVICES, LP $19.18M
- FOUTSCO PAVING COMPANY, LLC $19.48M
- HIGHWAY 19 CONSTRUCTION LLC $20.21M
- ED BELL CONSTRUCTION COMPANY $21.50M
- GREY SKY CONSTRUCTION LLC $22.58M
- HARPER BROTHERS CONSTRUCTION LLC $24.36M
Source: TxDOT Bid Tabulations ↗ · project A00045158
- CS FROM BELT LINE ROAD AT GOFF BRANCH TODallas District · Dallas County · Bridge Replacement · opened May 2, 2025
Low bid $8.17M by HIGHWAY 19 CONSTRUCTION LLC · estimate $7.69M (106%) · 6 bids · range $8.17M–$10.85M
Every bid (6)
- HIGHWAY 19 CONSTRUCTION LLC $8.17M
- GREY SKY CONSTRUCTION LLC $8.48M
- IBCTX, LLC $8.96M
- ALTUS CONSTRUCTION LLC $9.10M
- RAGLE CONSTRUCTION, INC. $10.35M
- URBAN INFRACONSTRUCTION LLC $10.85M
Source: TxDOT Bid Tabulations ↗ · project A00064833
- US 59 LiveOak lagarto-FM 1359 OVCorpus Christi District · Live Oak County · Overlay · opened May 2, 2025
Low bid $8.33M by LONE STAR PAVING COMPANY · estimate $11.22M (74%) · 5 bids · range $8.33M–$11.20M
Every bid (5)
- LONE STAR PAVING COMPANY $8.33M
- ANDERSON COLUMBIA CO., INC. $8.44M
- CK NEWBERRY, LLC $8.57M
- HUNTER INDUSTRIES, LTD. $8.61M
- TEXAS MATERIALS GROUP, INC. $11.20M
Source: TxDOT Bid Tabulations ↗ · project A00124356
- FM 50 F: US 79 T: Brazos CL - RER FY 25Bryan District · Robertson County · Rehabilitation of Existing Road · opened May 2, 2025
Low bid $20.56M by BIG CREEK CONSTRUCTION, LTD. · estimate $29.25M (70%) · 6 bids · range $20.56M–$30.29M
Every bid (6)
- BIG CREEK CONSTRUCTION, LTD. $20.56M
- KNIFE RIVER CORPORATION - SOUTH $21.35M
- BRAZOS PAVING, INC. $22.00M
- A. L. HELMCAMP, INC. $22.14M
- TEXAS MATERIALS GROUP, INC. $22.61M
- JAMES CONSTRUCTION GROUP, LLC $30.29M
Source: TxDOT Bid Tabulations ↗ · project A00133440
- FM 156; at Industrial BlvdFort Worth District · Tarrant County · Intersection & Operational Imprv · opened May 2, 2025
Low bid $6.43M by GREY SKY CONSTRUCTION LLC · estimate $6.00M (107%) · 7 bids · range $6.43M–$7.27M
Every bid (7)
- GREY SKY CONSTRUCTION LLC $6.43M
- O. TREVINO CONSTRUCTION, LLC $6.62M
- URBAN INFRACONSTRUCTION LLC $6.66M
- RAGLE CONSTRUCTION, INC. $6.69M
- ED BELL CONSTRUCTION COMPANY $6.85M
- XIT PAVING AND CONSTRUCTION INC. $7.19M
- JAGOE-PUBLIC COMPANY $7.27M
Source: TxDOT Bid Tabulations ↗ · project A00139426
- SH 156 SB_STEPHENS CREEK - BSSPLufkin District · San Jacinto County · Bridge Replacement · opened May 2, 2025
Low bid $4.30M by SKYLINE BRIDGE LLC · estimate $4.45M (97%) · 8 bids · range $4.30M–$5.57M
Every bid (8)
- SKYLINE BRIDGE LLC $4.30M
- JOHN REED AND COMPANY, LLC $4.35M
- LONGVIEW BRIDGE AND ROAD, LTD. $4.55M
- FORDE CONSTRUCTION COMPANY, INC. $4.98M
- HODGES AND SON CONSTRUCTION COMPANY, INC. $5.13M
- ALTUS CONSTRUCTION LLC $5.18M
- TEXAS MATERIALS GROUP, INC. $5.51M
- ISI CONTRACTING, INC. $5.57M
Source: TxDOT Bid Tabulations ↗ · project A00140955
← Newer · 3001–3025 of 4,272 · Older →
TxDOT work types
Routine Maintenance Project - Sealed 1025 · Material Maintenance Project 834 · Routine Maintenance Project 459 · Safety Improvement Projects 337 · Overlay 196 · Bridge Replacement 181 · Bridge Preventative Maintenance - Sealed 156 · Rehabilitation of Existing Road 150 · Traffic Control Devices 133 · Material Maintenance Project - Sealed 126 · Bridge Maintenance 100 · Seal Coat 76 · Pedestrian, Sidewalks & Curb Ramps 65 · Landscape & Scenic Enhancement 47 · Widen Non-Freeway 44 · State Use Project 43 · Intersection & Operational Imprv 37 · Bridge Preventative Maintenance 30 · Restoration 26 · Bridge Widening or Rehabilitation 24 · Super-2 Highway 19 · Interchange (New or Reconstructed) 18 · Freeway Operational Improvements 14 · Culvert & Storm Drainage Work 14
Where this comes from
- TxDOT Bid Tabulations ↗: Texas highway lettings and maintenance contracts, the last 24 months; newest bid opening 2026-10-29. Source: TxDOT. Official TxDOT sources take precedence.
- Cook County IL bid tabulations ↗: Cook County goods, services and construction bids since 2016; newest bid opening 2026-10-28. Public domain.
- Michigan DOT bid tabulations ↗: Michigan highway lettings since 2024: every bidder's total and the engineer's estimate; newest bid opening 2024-03-06.
- NCDOT bid results as read ↗: North Carolina highway lettings since October 2026 (the feed holds the latest letting only); newest bid opening 2026-10-20.
More states and cities publish bid tabulations only as PDFs; we add sources that publish them as data. Open Texas lettings show what similar ones went for on their own page: Texas DOT lettings.