Opportunity brief · SAM.gov solicitation
Rosebud Lift Station Construction
Health and Human Services, Department of · Indian Health Service · DIV OF ENGINEERING SVCS - SEATTLE · Solicitation 75H70127R00007 · NAICS 237110 Water and Sewer Line and Related Structures Construction · offers due 2026-12-01 · Open on SAM.gov ↗
- Posted
- 2026-10-27
- Place of work
- South Dakota
- Product or service code
- Y1ND · Construction of Sewage and Waste Facilities
- Likely size
- $319.5K – $319.5K
Who else wins this work
- Lacreek Development Corp · $1.93M in 2 awards · SD · 2 contracts at this office in the NAICS · likely to bid · DOT DBE, HUBZone, Minority-owned, Native American-owned, SDB
- S.T.Rhoades Construction Incorporated · $1.05M in 1 award · CA · 1 contract at this office in the NAICS · likely to bid · DOT DBE, Minority-owned, Native American-owned
- Chris G Howard · $1.44M in 113 awards · OK · same NAICS and product code at the agency · may bid
- Ama Diversified Construction Group · $638.1K in 33 awards · CA · same NAICS and product code at the agency · may bid · Hispanic American-owned, Minority-owned, 8(a), SDB
- Lawton Septic Tank & Storm Shelter Inc · $479.9K in 20 awards · OK · same NAICS and product code at the agency · may bid · DOT DBE, Manufacturer, Minority-owned, Native American-owned, SDB
- Allen Gill Construction, Inc. · $1.95M in 102 awards · CA · same NAICS at the agency · a possible teaming partner · DOT DBE, Minority-owned, Native American-owned
- Loman Drilling Inc. · $1.11M in 51 awards · OK · same NAICS and product code at the agency · a possible teaming partner
- MGL Enterprises LLC · $931.0K in 39 awards · OK · same NAICS and product code at the agency · a possible teaming partner
- Bethel Construction LLC · $741.4K in 1 award · KS · 1 contract at this office in the NAICS · a possible teaming partner
- Lost Creek Properties Inc · $708.6K in 62 awards · OK · same NAICS and product code at the agency · a possible teaming partner
Companies with the most contract dollars in NAICS 237110 at Department of Health and Human Services, FY2025–FY2026, from USAspending.gov awards as of 2026-11-14. Who may bid is read from award history only.
GSA labor rates of the companies above
- Advanced Systems Design, Inc. · median $110 an hour ($39–$226) across 150 rates
Ceiling rates on GSA schedule contracts (GSA CALC+), not what was bid.
From the notice
The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection.
Ask the AI chat about this notice →
More open Water and Sewer Line and Related Structures Construction contract opportunities
- Kelly Pierson OSS · Health and Human Services, Department of · WA · Small Business Set Aside - Total · due 2026-11-30
- Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment · Interior, Department of the · due 2026-11-27
- New Meadows Range Barn · Agriculture, Department of · ID · Small Business Set Aside - Total · due 2026-11-28
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades · Transportation, Department of · OK · Small Business Set Aside - Total · due 2026-11-30
- Y--Turnout Buildings · Interior, Department of the · due 2026-12-01
- Mud Mountain Dam Sewage Lagoon Repair · Dept of Defense · WA · Small Business Set Aside - Total · due 2026-12-01
- Ross Springs Waterline Replacement · Agriculture, Department of · UT · Small Business Set Aside - Total · due 2026-12-01
- Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) · Dept of Defense · due 2026-12-03
Who wins Water and Sewer Line and Related Structures Construction contracts
- PCL Construction Inc · $492.33M in the last two fiscal years
- Record Steel and Construction, Inc. · $129.81M in the last two fiscal years
- Ames Federal Contracting Group LLC · $129.49M in the last two fiscal years
- G.S.E. Construction Company, Inc. · $109.49M in the last two fiscal years
- Flatland Energy Services LLC · $75.53M in the last two fiscal years
- Carstensen Contracting Inc · $72.86M in the last two fiscal years
All 28 open notices in NAICS 237110 · Water and Sewer Line and Related Structures Construction: who buys it and who wins it · Contracts in this industry coming up for re-bid · The contracting office · Health and Human Services, Department of: spending and contractors · How big Water and Sewer Line and Related Structures Construction contracts usually are · Contract sizes in South Dakota · Federal spending in South Dakota · Federal contracts in South Dakota