Opportunity brief · SAM.gov combined synopsis/solicitation
New Meadows Range Barn
Agriculture, Department of · Forest Service · PAYETTE NATIONAL FOREST · Solicitation 1240LT27Q0027 · NAICS 237110 Water and Sewer Line and Related Structures Construction · Small Business Set Aside - Total set-aside · offers due 2026-11-28 · Open on SAM.gov ↗
- Posted
- 2026-11-24
- Place of work
- Idaho
- Product or service code
- Z2JZ · Repair or Alteration of Miscellaneous Buildings
At a glance
- Combined Synopsis/Solicitation from PAYETTE NATIONAL FOREST (small business set-aside), responses due 2026-11-28.
- No expiring contract in our records matched this notice: it may be new work, or its current contract wasn't matched, so the incumbent is unknown.
From the award and notice records as of 2026-11-23.
Read from the notice
- Single-bid risk: Low · one sign, not enough on its own: under 10 days to respond
Read by rules from the notice text and the office's contracts of the last 3 years; check the notice itself.
From the notice
A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654. B. Base work includes the following described below: 1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing. 2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces. 3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces. 4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required. C. Optional work includes the following described below: 1.
Ask the AI chat about this notice →
More open Water and Sewer Line and Related Structures Construction contract opportunities
- Ross Springs Waterline Replacement · Agriculture, Department of · UT · Small Business Set Aside - Total · due 2026-12-01
- South Fork Bunkhouse Well Abandonment Project · Agriculture, Department of · CO · due 2026-12-09
- 12445127B0001 AZ Lakeside Office Sewer Line Replacement · Agriculture, Department of · AZ · Small Business Set Aside - Total · due 2026-12-14
- Whiteface Campground Well Replacement · Agriculture, Department of · MN · Small Business Set Aside - Total · due 2026-12-14
- GAOA Bolar Mountain Recreation Area WWTP Replacement on the George Washington-Jefferson National Forest · Agriculture, Department of · VA · Small Business Set Aside - Total · due 2027-01-29
- Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment · Interior, Department of the · due 2026-11-27
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades · Transportation, Department of · OK · Small Business Set Aside - Total · due 2026-11-30
- Kelly Pierson OSS · Health and Human Services, Department of · WA · Small Business Set Aside - Total · due 2026-11-30
Who wins Water and Sewer Line and Related Structures Construction contracts
- PCL Construction Inc · $492.33M in the last two fiscal years
- Record Steel and Construction, Inc. · $129.81M in the last two fiscal years
- Ames Federal Contracting Group LLC · $129.49M in the last two fiscal years
- G.S.E. Construction Company, Inc. · $109.49M in the last two fiscal years
- Flatland Energy Services LLC · $75.53M in the last two fiscal years
- Carstensen Contracting Inc · $72.86M in the last two fiscal years
All 29 open notices in NAICS 237110 · Water and Sewer Line and Related Structures Construction: who buys it and who wins it · Contracts in this industry coming up for re-bid · The contracting office · Agriculture, Department of: spending and contractors · How big Water and Sewer Line and Related Structures Construction contracts usually are · Contract sizes in Idaho · Federal spending in Idaho · Federal contracts in Idaho