Opportunity brief · SAM.gov combined synopsis/solicitation
W045--Boiler Rental
Veterans Affairs, Department of · Veterans Affairs, Department of · 242-NETWORK CONTRACT OFFICE 02 (36C242) · Solicitation 36C24227Q0042 · NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors · offers due 2026-10-21 · Open on SAM.gov ↗
- Posted
- 2026-10-20
- Place of work
- New York
- Product or service code
- W045 · Lease or Rental of Equipment- Plumbing, Heating, and Waste Disposal Equipment
- Awarded to
Putting the brief together: the incumbent, who else wins this work, the contracting office and past prices…
From the notice
36C24227Q0042 Mod 2 Answers to questions submitted: Q1: What is the observed historical peak steam load of the facility? A1: 120,000 lb./hr. Q2: Will the Montrose VAMC waive the requirements of the VHA Safety Device and Testing Manual? A2: No. Q3: Air permits for emissions are the responsibility of the entity operating/generating the emission, not the owner of the equipment. Please clarify. A3: VA only, not the vendor. Q4: Will the VA change the 9PPM NOx requirement to 30 PPM? A4: No. Q5: Please clarify the size of the Boiler. A5: 800 HP Q6: Will fuel for the rental boiler be furnished by the Government of the Contractor? A6: Government Q7: Confirm intended placement and connection routing if boiler placement is on the south end but connections are at the north end? A7: East side of the plant (end near Boiler 1 near Building 24 hazmat storage area) Q8: What is the required installation and ready for service date? A8: Installation 11/1/2026. Ready for service 12/1/2026. Q9. Is a rental unit rated at about 30ppm NOx on natural gas acceptable for the temporary heating period, given that it is a temporary rental operating under the facility s existing permit? A9. Yes Q10. If 9 ppm NOx is mandatory, will the Government accept a unit fitted with flue gas recirculation (FGR) or selective catalytic reduction (SCR) to meet it, and will any additional time be allowed for delivery? A10. The most important factor is that the vendor make the delivery date, so the 9-ppm cis is not a deal breaker. Q11. The requirement lists a 95 PSIG operating pressure but also references 35,000 lb./hr.
More open Plumbing, Heating, and Air-Conditioning Contractors contract opportunities
- Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC · Veterans Affairs, Department of · NY · Small Business Set Aside - Total · due 2026-10-28
- Mechanical Services Basic Ordering Agreement (BOA) · Energy, Department of · NY · Small Business Set Aside - Total · due 2026-10-30
- HVAC, Repair and Maintenance for Fort Drum, NY · Dept of Defense · NY · Small Business Set Aside - Total · due 2028-08-07
- 4120--Rental of Two Chillers for One Year · Veterans Affairs, Department of · NC · Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) · due 2026-10-22
- Reverse Osmosis System Modifications · Veterans Affairs, Department of · MN · due 2026-10-23
- Z1Nd--El Paso Lift Station Piping Repair · Veterans Affairs, Department of · Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) · due 2026-10-23
- TVHS AC VRF System Installation · Veterans Affairs, Department of · TN · Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) · due 2026-10-23
- J045--Glycol Loop Flushing - NWI · Veterans Affairs, Department of · Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) · due 2026-10-26
All 45 open notices in NAICS 238220 · Plumbing, Heating, and Air-Conditioning Contractors: who buys it and who wins it · Contracts in this industry coming up for re-bid · The contracting office · Veterans Affairs, Department of: spending and contractors · Federal contracts in New York