Opportunity brief · SAM.gov solicitation

Kautz Road Substation Construcion, Uip Subproject 2- KRS

Energy, Department of · Energy, Department of · FERMILAB - DOE CONTRACTOR · Solicitation RFP-383167-CD · NAICS 237130 Power and Communication Line and Related Structures Construction · offers due 2026-12-18 · Open on SAM.gov ↗

Posted
2026-11-05
Place of work
Illinois
Product or service code
Z2MZ · Repair or Alteration of Epg Facilities - Other, Including Transmission

At a glance

  • Solicitation from FERMILAB - DOE CONTRACTOR, responses due 2026-12-18.
  • No expiring contract in our records matched this notice: it may be new work, or its current contract wasn't matched, so the incumbent is unknown.
  • No company wins this work at this office in these years; peers in the same industry at the agency (NAICS 237130, FY2025-FY2026): EAST COAST POWERLINE LLC ($5.00M), ADDISON CONSTRUCTION CO ($3.59M), LESKCA INCORPORATED ($2.28M).

From the award and notice records as of 2026-11-14.

Read from the notice

  • Single-bid risk: Low · no signs of it in the notice

Read by rules from the notice text and the office's contracts of the last 3 years; check the notice itself.

Who else wins this work

Companies with the most contract dollars in NAICS 237130 at Department of Energy, FY2025–FY2026, from USAspending.gov awards as of 2026-11-14. Who may bid is read from award history only.

From the notice

November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP).

Read the whole notice and its files on SAM.gov ↗

Ask the AI chat about this notice →

More open Power and Communication Line and Related Structures Construction contract opportunities

Who wins Power and Communication Line and Related Structures Construction contracts

All 7 open notices in NAICS 237130 · Power and Communication Line and Related Structures Construction: who buys it and who wins it · Contracts in this industry coming up for re-bid · The contracting office · Energy, Department of: spending and contractors · How big Power and Communication Line and Related Structures Construction contracts usually are · Contract sizes in Illinois · Federal spending in Illinois · Federal contracts in Illinois