Opportunity brief · SAM.gov solicitation
AFRL RISE 2808a AOI: Facility Alteration & Space Optimization – Bombers Directorate Hallway Project (Bldg 556)
Dept of Defense · Dept of the Air Force · FA8652 AFRL HQ AFRL/PK · Solicitation FA2396-27-9CTBD · NAICS 236220 Commercial and Institutional Building Construction · offers due 2026-12-04 · Open on SAM.gov ↗
- Posted
- 2026-11-23
- Place of work
- Ohio
- Product or service code
- Z1JZ · Maintenance of Miscellaneous Buildings
At a glance
- Solicitation from FA8652 AFRL HQ AFRL/PK, responses due 2026-12-04.
- No expiring contract in our records matched this notice: it may be new work, or its current contract wasn't matched (Defense publishes contract details about 90 days late), so the incumbent is unknown.
- The office has 34 active contracts; 33% of its 66 competed contracts (last 3 years) drew a single offer.
From the award and notice records as of 2026-11-21.
Contracting office
FA8652 AFRL HQ AFRL/PK · Department of the Air Force
- 34 active contracts, $83.91M
- 33% of its 66 competed contracts drew a single offer (last 3 years)
- Usually buys through: GWAC
Read from the notice
- Single-bid risk: Low · one sign, not enough on its own: this office's competed contracts drew one offer 33% of the time
Read by rules from the notice text and the office's contracts of the last 3 years; check the notice itself.
From the notice
This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. § 2808a. Refer to the attached AOI document and attachments for submission instructions, technical requirements, and assessment criteria. To optimize the work environment and facility functionality for personnel in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio. This project transforms an existing standard entrance hallway into a modern, motivating environment that reinforces the strategic deterrence mission and heritage of the USAF Bombers community through bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancement using existing space and structures. Target Timeline: The entire project must be completed within ninety (90) calendar days of award: Stage 1 Design Plan (30 days), Stage 2 Sourcing & Fabrication (60 days), and Stage 3 Physical Implementation & Closeout (90 days). On-site physical installation shall not exceed thirty (30) calendar days from physical site commencement and shall not restrict access to 2nd Floor restroom facilities for more than thirty (30) contiguous minutes.
Ask the AI chat about this notice →
More open Commercial and Institutional Building Construction contract opportunities
- Progressive Design-Build (PDB) - USSF Integration Facility F/10852 at WPAFB · Dept of Defense · OH · due 2026-11-30
- Progressive Design-Build (PDB) - RENOVATE HQ AFMC B/10262 PH 2 at WPAFB · Dept of Defense · OH · due 2026-11-30
- B422 Breakroom, B300 Bdoc · Dept of Defense · OH · Small Business Set Aside - Total · due 2026-12-08
- B422 Breakroom, B300 Bdoc · Dept of Defense · OH · Small Business Set Aside - Total · due 2026-12-10
- P758 Machinery Control Development Center, Philadelphia Navy Yard, PA · Dept of Defense · PA · due 2026-11-25
- P233 Air Traffic Control Tower and Flight Simulator Training Facility · Dept of Defense · MS · due 2026-11-25
- FY27 Design-Build (DB) Single Award Task Order Contract (SATOC) Baden-Wurttemberg Rheinland-Pfalz · Dept of Defense · due 2026-11-25
- Request for Qualification - MHMV230026 Construct Permanent Party Enlisted Dorm at Kirtland AFB, New Mexico · Dept of Defense · due 2026-11-25
Who wins Commercial and Institutional Building Construction contracts
- Fisher Sand & Gravel Co · $13.35B in the last two fiscal years
- Barnard Construction Company, Incorporated · $4.78B in the last two fiscal years
- Southwest Valley Constructors Co · $2.68B in the last two fiscal years
- SLS Federal Services LLC · $2.38B in the last two fiscal years
- Spencer Construction LLC · $2.36B in the last two fiscal years
- Black Construction-Tutor Perini JV · $1.42B in the last two fiscal years
All 211 open notices in NAICS 236220 · Commercial and Institutional Building Construction: who buys it and who wins it · Contracts in this industry coming up for re-bid · The contracting office · Dept of Defense: spending and contractors · How big Commercial and Institutional Building Construction contracts usually are · Contract sizes in Ohio · Federal spending in Ohio · Federal contracts in Ohio