Opportunity brief · SAM.gov presolicitation

CO OMAD 300(71) Minuteman Missile Access

Transportation, Department of · Federal Highway Administration · 6982AF CENTRAL FEDERAL LANDS DIVISI · Solicitation 6982AF27B000010 · NAICS 237310 Highway, Street, and Bridge Construction · Small Business Set Aside - Total set-aside · responses due 2026-10-16 (closed) · Open on SAM.gov ↗

Posted
2026-10-01
Place of work
Wyoming
Product or service code
Y1LB · Construction of Highways, Roads, Streets, Bridges, and Railways

This notice has closed: responses were due 2026-10-16. SAM.gov has taken it off its list of active notices; the facts on this page are as SpendQuery last read them there on 2026-11-16.

No award notice has been posted on SAM.gov under this solicitation number. Many awards are never posted as a notice: recently awarded contracts lists the ones that are, and the contracting office's page shows what it has awarded.

Looking for work like this? 8 open notices for the same work are listed below · All 42 open Highway, Street, and Bridge Construction notices · Contracts in this industry coming up for re-bid

From the notice

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: CO OMAD 300(71) PROJECT NAME: Minuteman Missile Access PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 73 culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. The project will be procured under the FPVS (Fixed-Price Variable Scope) contracting method and includes up to 85.75 miles of variable scope roadway reconditioning and re-graveling, and up to 73 culverts of variable scope in length.

Read the whole notice and its files on SAM.gov ↗

Open Highway, Street, and Bridge Construction contract opportunities like this one

Who wins Highway, Street, and Bridge Construction contracts

All 42 open notices in NAICS 237310 · Highway, Street, and Bridge Construction: who buys it and who wins it · Contracts in this industry coming up for re-bid · The contracting office · Transportation, Department of: spending and contractors · How big Highway, Street, and Bridge Construction contracts usually are · Contract sizes in Wyoming · Federal spending in Wyoming · Federal contracts in Wyoming