| 02F89701↗ | Environmental Protection Agency | ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY | COOPERATIVE AGREEMENT (B) | 2026-05-12 | 2026-05-12 | 1 | DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY TO IMPLEMENT ITS PROJECT FOR AQUIFER STORAGE AND RECOVERY PROJECT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER AND WATER QUALITY INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF THE PLANNING, PERMITTING, AND DESIGN OF THE NEW ARROYO DEL OSO AQUIFER STORAGE AND RECOVERY (ASR) PROJECT AS WELL AS THE DRILLING AND INSTALLATION OF THE NEW ASR WELL. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE A PRELIMINARY ENGINEERING REPORT, 30% DESIGN, 60% DESIGN, 100% DESIGN, PERMITS AND APPROVALS, AND AQUIFER STORAGE AND RECOVERY (ASR) WELL DRILLING AND CONSTRUCTION.
THE EXPECTED OUTCOMES INCLUDE THE DESIGN WORK AND TEST BOREHOLE DRILLING FOR A NEW ASR SYSTEM THAT WILL STRENGTHEN THE CITY'S ABILITY TO DELIVER CLEAN WATER TO ITS CUSTOMERS. WHEN COMPLETE, THE SYSTEM WILL STORE LARGE AMOUNTS OF WATER UNDERGROUND, WHICH CAN BE USED TO INCREASE WATER SUPPLIES FOR USE DURING TIMES OF DROUGHT AND PERIODS OF ELEVATED DEMAND WITHOUT THE WATER LOSS DUE TO EVAPORATION FREQUENTLY ENCOUNTERED WITH SURFACE WATER RESERVOIRS.
THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS AND BUSINESSES OF ALBUQUERQUE, NEW MEXICO (NM). | $512.3K |
| 02F88001↗ | Environmental Protection Agency | ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY | COOPERATIVE AGREEMENT | 2026-07-22 | 2026-09-28 | 2 | DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY TO IMPLEMENT ITS PROJECT TO SEWER COLLECTION SYSTEM AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.
ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: PLANNING AND DESIGN AND CONSTRUCTION FOR REDUCTION IN FAILING SEPTIC SYSTEMS AND UPGRADES TO A SEWER COLLECTION SYSTEM.
SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE OBTAINING SURVEY, EASEMENTS, LICENSE AGREEMENTS, PERMITS, CONSTRUCTION FOR REDUCTION IN FAILING SEPTIC SYSTEMS UPGRADES TO A SEWER COLLECTION SYSTEM.
THE EXPECTED OUTCOMES INCLUDE REDUCE CONTAMINATION AND IMPROVE GROUNDWATER QUALITY OVER TIME.
THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF ALBUQUERQUE, NEW MEXICO. | $210.0K |
| 140A2325P0019↗ | Department of the Interior | ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY | PURCHASE ORDER | 2025-12-03 | 2026-07-13 | 3 | EO 14398 - BILATERAL MOD TO ADD FAR 52.222-90 | $120.0K |
| 140A2326P0020↗ | Department of the Interior | ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY | PURCHASE ORDER | 2025-12-10 | 2025-12-10 | 1 | WATER/SEWER/REFUSE SERVICES FOR ABQ/SPA HDQRTS. | $6.1K |
| INA15PC00178↗ | Department of the Interior | ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY | DEFINITIVE CONTRACT | 2026-04-03 | 2026-04-03 | 1 | THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT. | -$500 |
| R24AP00177↗ | Department of the Interior | ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY | GRANT | 2026-02-26 | 2026-05-27 | 2 | THE ALBUQUERQUE-BERNALILLO COUNTY WATER UTILITY AUTHORITY (WATER AUTHORITY) WILL RECONNECT APPROXIMATELY 11 ACRES OF FLOODPLAIN HABITAT ALONG 1,900 LINEAR FEET OF THE RIO GRANDE APPROXIMATELY FIVE MILES SOUTH OF DOWNTOWN ALBUQUERQUE, NEW MEXICO. THE WATER AUTHORITY OPERATES THE SOUTHSIDE WASTEWATER RECLAMATION PLANT (SWRP), WHICH TREATS APPROXIMATELY 55 MILLION GALLONS OF WASTEWATER PER DAY. THE LAND SURROUNDING THE OUTFALL IS PART OF THE RIO GRANDE VALLEY STATE PARK AND IS JOINTLY OWNED BY MIDDLE RIO GRANDE CONSERVANCY DISTRICT AND THE BUREAU OF RECLAMATION. HIGH-QUALITY TREATED EFFLUENT IS THEN RELEASED TO THE RIO GRANDE VIA AN OUTFALL CHANNEL ON THE EAST BANK OF THE RIVER. THE PROJECT WILL RECONNECT THE RIO GRANDE TO ITS FLOODPLAIN BY EXCAVATING THE BANKS, ALLOWING WATER TO STRETCH ACROSS THE FLOODPLAIN, RESTORING THE RIVERS NATURAL HYDRAULIC PROCESSES AND ENHANCING AND ADDING 2.2 ACRES OF EXPANDED FLOODPLAIN HABITAT FOR THE ENDANGERED RIO GRANDE SILVERY MINNOW. BANK STABILIZATION MEASURES, INCLUDING ROOTWAD REVETMENTS, NATIVE REVEGETATION, AND SOIL ENCAPSULATED LIFTS, WILL BE INSTALLED AT THE BASE OF THE NEWLY EXCAVATED FLOODPLAIN TERRACES TO PROVIDE BANK STABILITY, PROMOTE HYDRAULIC MIXING OF THE HIGH QUALITY SWRP OUTFALL WATER WITH SEDIMENT-LOADED RIVER WATER, AND INCREASE INSTREAM HABITAT AVAILABILITY. THE PROJECT WILL ALSO INTEGRATE PUBLIC RECREATION ACCESS THROUGH THE RESTORATION AREA WITH THE INSTALLATION OF PUBLIC INTERPRETIVE TRAILS. THE PROJECT IS WIDELY SUPPORTED BY STATE AND LOCAL GOVERNMENT ENTITIES. | -$87.9K |