| 693JJ32640363↗ | Department of Transportation | COUNTY OF MESA | PROJECT GRANT (B) | 2026-02-04 | 2026-02-04 | 1 | THIS PROJECT WILL REPLACE APPROXIMATELY 1.75 MILES OF RURAL ROADWAY WITH A MULTIMODAL, COMPLETE STREET THROUGHOUT WHICH INCLUDES, BUT IS NOT LIMITED TO, STORMWATER IMPROVEMENTS, UTILITY RELOCATIONS, CURB/GUTTER INSTALLATIONS, NEW PAVEMENT WITH 11' LANES PLUS 4' PAVED SHOULDERS FOR BICYCLES, NEW 5' SIDEWALK ON THE SOUTH SIDE AND A 10' SHARED USE PATH OF THE NORTH SIDE, CONSTRUCTION OF A ROUNDABOUT AT THE INTERSECTION OF 31 ROAD TO REPLACE THE CURRENT TWO-WAY STOP CONFIGURATION, UPGRADE TRANSIT STOPS WITH CONCRETE PADS AND BENCHES, REPLACEMENT OF AN AGING CULVERT AND PEDESTRIAN BRIDGE OVER THE LEWIS WASH WITH A WIDENED BOX CULVERT, AND REPLACEMENT OF THE HIGHLINE CANAL BRIDGE TO ACCOMMODATE ADA ACCESS. | $3.16M |
| CO-2026-008↗ | Department of Transportation | COUNTY OF MESA | FORMULA GRANT (A) | 2026-03-16 | 2026-03-16 | 1 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO FUND FIXED ROUTE OPERATING ASSISTANCE PREVENTIVE MAINTENANCE ADA PARATRANSIT OPERATING ASSISTANCE AND SECURITY EXPENDITURES.; ACTIVITIES PERFORMED: FUNDS WILL BE USED TO COVER FIXED ROUTE OPERATING ASSISTANCE VEHICLE PREVENTIVE MAINTENANCE ADA PARATRANSIT OPERATING ASSISTANCE AND SECURITY EXPENDITURES FOR GRAND VALLEY TRANSIT.; EXPECTED OUTCOMES: THE FORMULA FUNDS WILL MAINTAIN SERVICE LEVELS FOR MESA COUNTY TRANSIT SERVICE.; INTENDED BENEFICIARIES: MESA COUNTY RIDERS MOSTLY INCLUDE THE TRANSPORTATION DISADVANTAGED (INCLUDING THE ELDERLY AND DISABLED) FOR ACCESS TO EMPLOYMENT EDUCATION MEDICAL SHOPPING AND PERSONAL TRIPS.; SUBRECIPIENT ACTIVITIES: NONE. | $2.74M |
| CO-SSG-4067-27-27↗ | Department of Veterans Affairs | COUNTY OF MESA | GRANT | 2026-09-24 | 2026-09-24 | 1 | GRANT FUNDS FOR FUNDING YEAR FIVE (FY 27). CONSIDERED FY 27 GRANT FUNDS EVEN THOUGH IT IS ALLOCATED IN FY 26 (09/30/2026 - 09/30/2027). | $733.4K |
| HID2526G0702↗ | Executive Office of the President | COUNTY OF MESA | GRANT | 2026-07-06 | 2026-07-06 | 1 | HIGH INTENSITY DRUG TRAFFICKING AREAS HIDTA PROGRAM FISCAL YEAR FY 2026 GRANT | $526.6K |
| CO-2026-016↗ | Department of Transportation | COUNTY OF MESA | FORMULA GRANT (A) | 2026-06-04 | 2026-06-04 | 1 | APPLICATION PURPOSE: FUNDS WILL BE USED TO PURCHASE ONE EXPANSION LOW-FLOOR BUS FOR THE PURPOSE OF UPCOMING TRANSIT SERVICE EXPANSION.; ACTIVITIES PERFORMED: THE PURCHASE OF ONE EXPANSION LOW-FLOOR BUS.; EXPECTED OUTCOMES: AN EXPANSION OF EXISTING TRANSIT SERVICE AND A MORE RELIABLE VEHICLE FLEET.; INTENDED BENEFICIARIES: MESA COUNTY RIDERS INCLUDING THE ELDERLY AND DISABLED WHO USE TRANSIT SERVICE TO ACCESS EMPLOYMENT EDUCATION MEDICAL SHOPPING AND PERSONAL TRIPS.; SUBRECIPIENT ACTIVITIES: NONE. | $500.0K |
| NR268B05XXXXC006↗ | Department of Agriculture | COUNTY OF MESA | COOPERATIVE AGREEMENT (B) | 2026-01-23 | 2026-07-29 | 2 | EMERGENCY WATERSHED PROTECTION PROGRAM IN MESA CO CO. DSR 08_03_25_5096_003. SEDIMENT AND EROSION CONTROL MEASURES TO PROTECT LIFE AND PROPERTY BELOW THE TURNER GULCH FIRE. | $362.8K |
| 693JJ32640009↗ | Department of Transportation | COUNTY OF MESA | PROJECT GRANT (B) | 2026-02-20 | 2026-09-21 | 2 | SAFE STREETS AND ROADS FOR ALL PLANNING GRANT FOR NESA COUNTY REGIONAL TRANSPORTATION PROGRAM OFFICE, COLORADO | $196.0K |
| L25AC00395↗ | Department of the Interior | COUNTY OF MESA | COOPERATIVE AGREEMENT | 2026-07-07 | 2026-08-31 | 2 | THE AWARD FUNDS COUNTY OF MESA TO MAINTAIN, PLAN, AND DEVELOP TRAILS ON PUBLIC LANDS MANAGED BY THE BUREAU OF LAND MANAGEMENT IN MESA COUNTY. THE PURPOSE IS TO KEEP EXISTING TRAIL SYSTEMS SAFE, RESILIENT, AND WELCOMING, AND TO ADD NEW BEGINNER AND INTERMEDIATE ROUTES THAT BROADEN ACCESS FOR PEOPLE OF ALL AGES AND ABILITIES. THE GOALS ARE CLEAR: COMPLETE ROUTINE MAINTENANCE ACROSS MAJOR TRAIL AREAS, CLOSE AND RESTORE UNAUTHORIZED ROUTES, REDUCE EROSION, IMPROVE DRAINAGE, WIDEN CORRIDORS WHERE NEEDED, AND CONSTRUCT NONTECHNICAL TRAILS THAT INVITE NEW USERS WHILE PROTECTING NATURAL RESOURCES.THE PROJECT TEAM COMPLETES A RECURRING CYCLE OF ONTHEGROUND TASKS THAT INCLUDE CLOSING AND RESTORING SOCIAL TRAILS, REVEGETATING DISTURBED AREAS, CLEARING TREES AND BRUSH, REPAIRING TREAD, STABILIZING SLOPES AND DRAINS, BUILDING ROCK FEATURES AND SMALL RAMPS, MANAGING INVASIVE PLANTS, IMPROVING SIGNAGE AND MAPS, ENHANCING CAMPSITES, AND SUPPORTING SEARCH AND RESCUE NEEDS WHEN REQUESTED. STAFF ALSO CARRY OUT SURVEYS AND COMPLIANCE WORK TO MEET ENVIRONMENTAL REVIEW REQUIREMENTS FOR NEW CONSTRUCTION. THE TEAM IMPLEMENTS THE GUNNISON BLUFFS MASTER PLAN BY BUILDING FIVE TO TEN MILES OF NEW, NONTECHNICAL TRAIL AND ADVANCES NEW TRAIL DEVELOPMENT AT THE KOKOPELLI SYSTEM BY BUILDING TEN TO FIFTEEN MILES OF TRAIL, WITH PRIORITIES SET IN COORDINATION WITH FIELD OFFICE STAFF.THE PROJECT DELIVERS MAINTAINED, CLEARLY MARKED, AND SAFER TRAILS ACROSS THE COUNTYS HIGHUSE AREAS, MEASURABLE MILES OF NEW NONTECHNICAL TRAIL, RESTORED HABITATS WHERE UNAUTHORIZED ROUTES ONCE EXISTED, IMPROVED DRAINAGE AND EROSION CONTROL FEATURES, UPDATED MAPS AND SIGNS, AND PERIODIC REPORTS THAT DOCUMENT PROGRESS AND COSTS. THESE TANGIBLE PRODUCTS REDUCE RESOURCE DAMAGE, IMPROVE THE VISITOR EXPERIENCE, AND CREATE A DURABLE TRAIL NETWORK THAT CAN BE EFFICIENTLY MAINTAINED OVER TIME. THE WORK ALSO PRODUCES JOBS: FOUR FULLTIME POSITIONS WITHIN THE COUNTY AND SHORTTERM ROLES TIED TO CONTRACTS, ALONG WITH PATHWAYS FOR LONGERTERM CAREERS IN CONSERVATION, STEWARDSHIP, COMPLIANCE, TOURISM, AND OUTDOOR RECREATION.LOCAL RESIDENTS, FAMILIES, NEW TRAIL USERS, AND VISITORS BENEFIT THROUGH SAFER, EASIERTONAVIGATE ROUTES AND BROADER ACCESS TO OUTDOOR EXPERIENCES THAT DO NOT REQUIRE ADVANCED SKILLS. LAND MANAGERS BENEFIT THROUGH REDUCED MAINTENANCE BACKLOGS AND FEWER IMPACTS FROM UNAUTHORIZED USE. SMALL BUSINESSES THAT SERVE OUTDOOR RECREATION SEE STEADIER DEMAND TIED TO IMPROVED TRAIL QUALITY. THE LARGER COMMUNITY GAINS FROM HEALTHIER PUBLIC LANDS, A SIMPLER ENTRY POINT TO NATURE FOR FIRSTTIME USERS, AND THE ECONOMIC ACTIVITY THAT FOLLOWS WELLMAINTAINED, INCLUSIVE TRAIL SYSTEMS. | $35.0K |