| R25AP00102↗ | Department of the Interior | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | GRANT | 2026-05-22 | 2026-05-22 | 1 | THE RECIPIENTS PURPOSE IS TO COMPLETE PLANNING, DESIGN, AND CONSTRUCTION ACTIVITIES FOR A REGIONAL REUSE SYSTEM. THE GOAL IS TO INTEGRATE A POTABLE AND SECONDARY IRRIGATION REUSE SOURCE INTO WASHINGTON COUNTYS WATER SUPPLY PORTFOLIO TO HELP MEET WATER DEMAND FOR THE AREAS EXPANDING ECONOMY AND GROWING POPULATION. THE RECIPIENT SHALL PLAN, DESIGN AND CONSTRUCT A REGIONAL REUSE SYSTEM IN WASHINGTON COUNTY. THE REGIONAL REUSE SYSTEM COMPRISES MULTIPLE PHASES OF TREATMENT, CONVEYANCE, AND STORAGE PROJECTS. THE PROJECT ACTIVITIES INCLUDE PROJECT PLANNING, 30% DESIGN, 100% DESIGN, AND CONSTRUCTION STAGES.THE FOLLOWING TASK WILL BE COMPLETED: TASK 1, COMPLETE SITE-SPECIFIC GEOTECHNICAL AND SURVEY STUDIES TO GATHER DESIGN DATATASK 2, REFINE PRELIMINARY PROJECT DESIGNS AND COST ESTIMATESTASK 3, INITIATE ENVIRONMENTAL COMPLIANCE AND OTHER RELATED PERMITTING ACTIVITIESTASK 4, COMPILE AND OR COMPLETE BASELINE ENVIRONMENTAL AND CULTURAL RESOURCES STUDIESTASK 5, PREPARE CONSTRUCTION DRAWINGS AND SPECIFICATIONS AND A DESIGN REPORT TO 30% LEVELTASK 6, PREPARE CONSTRUCTION DRAWINGS AND SPECIFICATIONS AND A DESIGN REPORT TO 100% LEVEL TASK 7, OBTAIN BIDS AND SELECT CONTRACTOR TO COMPLETE CONSTRUCTION ACTIVITIES | $641.2K |
| P25AC01338↗ | Department of the Interior | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | COOPERATIVE AGREEMENT | 2026-07-22 | 2026-07-22 | 1 | 15.944 NATURAL RESOURCE STEWARDSHIPSAM.GOV LINK: CLICK HERE FOR THE SAM.GOV ASSISTANCE LISTINGTEMPLATE: THE NATURAL RESOURCE STEWARDSHIP PROGRAM IS THE PRINCIPLE MEANS THROUGH WHICH THE NATIONAL PARK SERVICE (NPS) EVALUATES AND IMPROVES THE HEALTH OF WATERSHEDS, LANDSCAPES, AND MARINE AND COASTAL RESOURCES, SUSTAINS BIOLOGICAL COMMUNITIES ON THE LANDS AND WATERS IN PARKS, AND ACTIVELY ENDEAVORS TO IMPROVE THE RESILIENCY OF THESE NATURAL RESOURCES AND ADAPT THEM TO THE EFFECTS OF CLIMATE CHANGE. THIS PROJECT ENHANCES VISITOR EXPERIENCE BY PROTECTING AND IMPROVING THE NATIVE FISHERY OF THE VIRGIN RIVER WITHIN ZION NATIONAL PARK. WORK INCLUDES ANNUAL MONITORING OF VIRGIN SPINEDACE IN THE NORTH AND EAST FORKS, CONDUCTING FISH CLEARANCES FOR STREAM ALTERATION PERMITS, COMPLETING DISTRIBUTION SURVEYS FOR THE VIRGIN RIVER PROGRAM, AND PROVIDING GUIDANCE FOR THE VIRGIN RIVER FISH PASSAGE INITIATIVE. BENEFICIARIES INCLUDE THE GENERAL PUBLIC. | $19.8K |
| L24AC00436↗ | Department of the Interior | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | COOPERATIVE AGREEMENT | 2026-06-25 | 2026-08-19 | 3 | AWARD PURPOSE: THE PURPOSE OF THIS PROJECT IS TO FIX AND STRENGTHEN THE VIRGIN RIVER GORGE FISH BARRIER. THIS BARRIER IS IMPORTANT BECAUSE IT KEEPS INVASIVE RED SHINER FISH FROM MOVING UPSTREAM. STOPPING RED SHINER PROTECTS ENDANGERED NATIVE FISH LIKE WOUNDFIN AND VIRGIN RIVER CHUB. THE BARRIER WAS DAMAGED BY STRONG RIVER FLOWS IN 2023, AND REPAIRING IT IS NEEDED TO MAKE SURE IT KEEPS WORKING AND PROTECTS THE PROGRESS ALREADY MADE IN RESTORING NATIVE FISH.ACTIVITIES TO BE PERFORMED: THE PROJECT REPLACES BROKEN OR MISSING STEEL PLATES ON THE BARRIERS SPLASHPAD. IT ADDS NEW STEEL PLATES TO THE WALLS TO PROTECT THEM FROM FAST WATER AND ROUGH SEDIMENT. WORKERS WELD THE PLATES TOGETHER AND SECURE THEM WITH BOLTS. THEY PUMP CONCRETE GROUT UNDER THE PLATES TO FILL EMPTY SPACES AND HELP SUPPORT THE BARRIER. THEY ALSO WELD PROTECTIVE STRIPS OVER THE BOLTS AND SEAMS TO MAKE THE REPAIR STRONGER AND TO KEEP BOATERS SAFE.EXPECTED DELIVERABLES: THE PROJECT CREATES A FULLY REPAIRED AND STRENGTHENED FISH BARRIER THAT CAN WITHSTAND POWERFUL WATER FLOWS. IT IMPROVES THE BARRIERS LONGTERM STABILITY SO IT CONTINUES STOPPING RED SHINER FROM MOVING UPSTREAM. THE REPAIR HELPS PROTECT THE HABITAT THAT ENDANGERED FISH NEED AND SUPPORTS ONGOING RECOVERY EFFORTS. STRONGER CONSTRUCTION ALSO REDUCES HOW OFTEN LARGE REPAIRS ARE NEEDED IN THE FUTURE.INTENDED BENEFICIARIES: THIS PROJECT BENEFITS FEDERAL AND STATE PARTNERS WORKING TO PROTECT NATIVE FISH IN THE VIRGIN RIVER. IT HELPS LOCAL COMMUNITIES THAT RELY ON THE RIVER FOR WATER, ECOSYSTEM HEALTH, AND RECREATION. IT ALSO SUPPORTS THE GENERAL PUBLIC BY KEEPING NATIVE SPECIES SAFE AND IMPROVING THE OVERALL HEALTH OF THE VIRGIN RIVER GORGE. | $0 |
| R22AC00211↗ | Department of the Interior | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | COOPERATIVE AGREEMENT | 2026-07-22 | 2026-07-22 | 1 | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT (DISTRICT) IN WASHINGTON COUNTY, UTAH WILL PREPARE A DROUGHT CONTINGENCY PLAN (DCP) FOR THE VIRGIN RIVER WATERSHED. OVER THE PAST 20 YEARS, THE WATERSHED HAS EXPERIENCED SOME LEVEL OF DROUGHT ON A REGULAR BASIS. THE VIRGIN RIVER AND ITS TRIBUTARIES, INCLUDING THE SANTA CLARA RIVER, ARE THE SOLE SOURCES OF SURFACE WATER FOR WASHINGTON COUNTY. THE ARID CLIMATE OF SOUTHWEST UTAH MAKES THE VIRGIN RIVER WATERSHED ESPECIALLY SENSITIVE TO WATER SCARCITY. THE DCP WILL HELP PROVIDE LOCAL STAKEHOLDERS WITH A PROACTIVE APPROACH TO MANAGING THE SCARCE WATER RESOURCES AND IMPROVING DROUGHT RESILIENCY. | $0 |
| R23AP00371↗ | Department of the Interior | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | GRANT | 2026-03-12 | 2026-03-12 | 1 | WASHINGTON COUNTY IS THE FASTEST GROWING METRO AREA IN THE UNITED STATES AND UTAHS HOTTEST, DRIEST REGION. WATER SUPPLIES IN THE WASHINGTON COUNTY AREA ARE LIMITED TO THE VIRGIN RIVER DRAINAGE BASIN (GROUNDWATER AND SURFACE WATER), WHICH IS A FLASHY DESERT STREAM SYSTEM REACHING ITS FULL DEVELOPMENTAL CAPACITY.REGIONAL PLANNING PROCESSES HAVE IDENTIFIED A DIVERSE PORTFOLIO OF FUTURE PRACTICES AND PROJECTS TO MEET FUTURE NEEDS BY SECURING AND STRETCHING LIMITED LOCAL WATER SUPPLIES THREATENED BY CLIMATE CHANGE, INCLUDING ADDITIONAL CONSERVATION, REGIONAL REUSE, LOCAL RELIABLE WATER SUPPLY DEVELOPMENT, AND COLORADO RIVER IMPORTS.THE MULTIPURPOSE ASH CREEK PROJECT WILL DEVELOP WATER RESOURCES WITHIN THE ASH CREEK WATERSHED TO HELP MAXIMIZE LOCAL RELIABLE WATER SUPPLIES AND INCREASE RECREATIONAL OPPORTUNITIES. THE PROJECT CONSISTS OF A NEW PIPELINE FROM THE OUTLET OF THE EXISTING ASH CREEK RESERVOIR TO THE NEW OFFSTREAM TOQUER RESERVOIR LOCATED ON THE NORTH END OF TOQUERVILLE. AT FULL CAPACITY(3,725 FEET ABOVE MEAN SEA LEVEL), THE SURFACE AREA OF THE PROPOSED TOQUER RESERVOIR WILL BE 115 ACRES AND HOLD 3,638 ACRE-FEET OF WATER. THE PROPOSED RECREATION AND PUBLIC PURPOSES (R PP)LEASE AND SUBSEQUENT PATENT AREA IS FOR APPROXIMATELY 13 ACRES OF BUREAU OF LAND MANAGEMENT-ADMINISTERED LANDS FOR DEVELOPMENT OF THE TOQUER RESERVOIR RECREATION AREA.THE ASH CREEK PROJECT IS PART OF A PROPOSED WATER SYSTEM THAT WILL SUPPLY UP TO 1,793 ACRE-FEET PER YEAR OF AN ALTERNATE SOURCE OF SECONDARY IRRIGATION WATER TO THE TOQUERVILLE SECONDARY WATER SYSTEM (TSWS) AND THROUGH EXCHANGE ALLOW WATER FROM TOQUERVILLE SPRINGS, THE CURRENT TSWS SUPPLY SOURCE, TO BE DELIVERED AS POTABLE MUNICIPAL WATER IN TOQUERVILLE, LA VERKIN, AND HURRICANE. WCWCD S PRIMARY PURPOSES FOR THE PROPOSED PROJECT ARE:1. CONSERVE A PORTION OF THE SURFACE RUN-OFF THAT IS CURRENTLY BEING LOST TO SEEPAGE IN THE ASH CREEK RESERVOIR AND PIPE IT TO A NEW OFF-STREAM RESERVOIR SITE (TOQUER RESERVOIR) THAT WILL MORE EFFECTIVELY STORE WATER AND HELP ENSURE PREDICTABLE WATER SUPPLIES TO WATER RIGHTS HOLDERS AND LOCAL COMMUNITIES 2. MINIMIZE WATER LOSSES TO SEEPAGE AND EVAPOTRANSPIRATION BY REPLACING OPEN DITCHES WITH PRESSURIZED PIPELINES IN THE PROJECT AREA 3. CONSERVE HIGH QUALITY POTABLE WATER FOR HUMAN CONSUMPTION (POTABLE USES), BY SUBSTITUTING LOWER QUALITY WATER FOR SECONDARY IRRIGATION AND4. PROVIDE FOR SAFE AND ENJOYABLE WATER-BASED PUBLIC RECREATIONAL USES, THEREBY BENEFITTING LOCAL RESIDENTS AND VISITORS TO THE AREA. | $0 |
| R24AP00183↗ | Department of the Interior | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | GRANT | 2026-03-25 | 2026-03-25 | 1 | THE PROJECT WILL BENEFIT THE PUBLIC BY PROVIDING MORE INFORMATION ON THE FEASIBILITY OF DESALINATING THE LA VERKIN HOT SPRINGS, WHICH WOULD IN TURN PROVIDE AN ADDITIONAL SOURCE OF USABLE WATER IN THE WASHINGTON COUNTY, UT REGION.COMPILE AND SUMMARIZE EXISTING INFORMATION ON THE HOT SPRINGS AND PREPARE CONCEPTUAL-LEVEL AND APPRAISAL-LEVEL INFORMATION FOR AN ALTERNATIVE TO EXTRACT AND TREAT THE HOT SPRINGS WATER. THE DEVELOPED AND SELECTED ALTERNATIVES WILL BE CONSIDERED FOR FURTHER FEASIBILITY-LEVEL EVALUATION BY THE DISTRICT AND RECLAMATION. | $0 |
| R24AP00353↗ | Department of the Interior | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | PROJECT GRANT (B) | 2026-01-30 | 2026-01-30 | 1 | THE WASHINGTON COUNTY REGIONAL REUSE SYSTEM WILL HELP MAXIMIZE LOCAL RELIABLE WATER SUPPLIES THAT ARE UNDER INCREASING PRESSURE FROM CLIMATE CHANGE AND ECONOMIC GROWTH. A POTABLE AND SECONDARY IRRIGATION REUSE SOURCE WILL BE INTEGRATED INTO WASHINGTON COUNTY WATER CONSERVANCY DISTRICT (WCWCD) WATER SUPPLY PORTFOLIO TO HELP MEET WATER DEMANDS. THE REGIONAL REUSE SYSTEM WILL ULTIMATELY INCLUDE MULTIPLE WATER TREATMENT FACILITIES, PIPELINES, AND STORAGE RESERVOIRS TO REUSE APPROXIMATELY 47,000 ACRE-FEET OF WATER EACH YEAR BY 2050. REUSE WATER SUPPLY WILL BE DELIVERED TO RWSA MUNICIPALITIES WITHIN THE WCWCD SERVICE AREA.THE REGIONAL REUSE SYSTEM COMPRISES MULTIPLE TREATMENT, CONVEYANCE, AND STORAGE PROJECTS. THE REGIONAL REUSE SYSTEM WILL IMPLEMENT POTABLE REUSE AND SUPPLEMENT SECONDARY IRRIGATION SYSTEMS TO ALLOW SECONDARY WATER SUPPLIES TO MEET POTABLE DEMANDS.TREATMENT AND CONVEYANCE REUSE PROJECTS INCLUDE THE FOLLOWING:EXISTING ST. GEORGE REUSE FACILITY (SGRF) UPGRADE TO 14 MGDSGRF ONSITE REUSE POND FOR TREATMENT OPERATIONS (100 ACRE-FEET)ADVANCED WATER TREATMENT (AWT) FACILITY (7 MGD)PIPELINES FROM SGRF TO REUSE FOREBAYPIPELINE FROM REUSE FOREBAY TO WARNER VALLEY RESERVOIRPIPELINE FROM EXISTING CONFLUENCE PARK WATER RECLAMATION FACILITY TO TOQUERVILLE SECONDARY WATER SYSTEM (TSWS). THE FOLLOWING TASKS FOR PLANNING AND PRE-CONSTRUCTION STUDIES FOR TREATMENT AND CONVEYANCE PROJECTS SHALL BE COMPLETED. TASK 1, COMPLETE SITE-SPECIFIC GEOTECHNICAL AND SURVEY STUDIES TO GATHER DESIGN DATATASK 2, REFINE PRELIMINARY PROJECT DESIGNS AND COST ESTIMATESTASK 3, INITIATE ENVIRONMENTAL COMPLIANCE AND OTHER RELATED PERMITTING ACTIVITIESTASK 4, COMPILE AND OR COMPLETE BASELINE ENVIRONMENTAL AND CULTURAL RESOURCES STUDIES | $0 |
| R24AP00395↗ | Department of the Interior | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | GRANT | 2026-09-28 | 2026-09-28 | 1 | THE WASHINGTON COUNTY WATER CONSERVANCY DISTRICT (WCWCD) WILL CONDUCT A THOROUGH GROUNDWATER STUDY AROUND THE GUNLOCK RESERVOIR OF WASHINGTON COUNTY, UTAH TO CHARACTERIZE THE AQUIFER RECHARGE AND DETERMINE THE ACTUAL SUSTAINABLE YIELD. THE WCWCD 2022 MASTER PLAN DETERMINED THAT, AS OF 2028, THE DISTRICT WILL NOT HAVE ENOUGH WATER TO MEET THE DEMANDS OF THE AREAS GROWING POPULATION WITHOUT IMMEDIATE ACTION. THE GROUNDWATER STUDY WILL INVOLVE COMPILING AND REVIEWING AVAILABLE INFORMATION AND PREVIOUS STUDIES, CHARACTERIZING GROUNDWATER AND SURFACE WATER, IDENTIFYING TRENDS, AND CREATING A GROUNDWATER MODEL. THE PROJECT WILL BE OUTSOURCED TO AN ENGINEERING FIRM SPECIALIZING IN HYDROGEOLOGY, WHO MAY DETERMINE A NEED TO DRILL OBSERVATION WELLS. THE TOOLS AND DATA COLLECTED WILL INFORM WATER MANAGERS AND LOCAL CONSERVATION GROUPS AND SUPPORT THE WCWCDS 20-YEAR PLAN IN ADDRESSING THE PROJECTED WATER IMBALANCE DUE TO GROWTH, DROUGHTS, AND FLOODS. THE PROJECT IS SUPPORTED BY THE VIRGIN RIVER PROGRAM AND THE UNITED STATES GEOLOGICAL SURVEY. | $0 |