| 693JJ22540000Y430MNI535005↗ | Department of Transportation | MINNESOTA DEPARTMENT OF TRANSPORTATION | PROJECT GRANT (B) | 2026-03-17 | 2026-03-17 | 1 | PROJECT TITLE: BLATNIK BRIDGE REPLACEMENT PROJECT :::: PROJECT DESCRIPTION: I-535: OVER THE ST. LOUIS BAY BETWEEN DULUTH & SUPERIOR WISCONSIN- REPLACE BLATNIK BR #9030 WITH NEW BR #69913 (WI BR #B-16-0153) & CONSTRUCT WISDOT BR'S #B-16-0154 & B-16-0155, CONSTRUCTION OF RAMPS, ROUNDABOUTS, LOCAL STREETS, LIGHTING, RETAINING WALLS, ADA, ITS, RWIS, DMS, & UTILITIES (INCLUDES PE CONTRACTS PREVIOUSLY AUTHORIZED, FINAL DESIGN, ROW, RR AGREEMENTS & CE) | $884.00M |
| 693JJ22640000Y462MNI535005↗ | Department of Transportation | MINNESOTA DEPARTMENT OF TRANSPORTATION | PROJECT GRANT (B) | 2026-03-17 | 2026-03-17 | 1 | PROJECT TITLE: BLATNIK BRIDGE REPLACEMENT PROJECT :::: PROJECT DESCRIPTION: I-535: OVER THE ST. LOUIS BAY BETWEEN DULUTH & SUPERIOR WISCONSIN- REPLACE BLATNIK BR #9030 WITH NEW BR #69913 (WI BR #B-16-0153) & CONSTRUCT WISDOT BR'S #B-16-0154 & B-16-0155, CONSTRUCTION OF RAMPS, ROUNDABOUTS, LOCAL STREETS, LIGHTING, RETAINING WALLS, ADA, ITS, RWIS, DMS, & UTILITIES (INCLUDES PE CONTRACTS PREVIOUSLY AUTHORIZED, FINAL DESIGN, ROW, RR AGREEMENTS & CE) | $174.27M |
| 693JJ22640000Y465MNI494013↗ | Department of Transportation | MINNESOTA DEPARTMENT OF TRANSPORTATION | PROJECT GRANT (B) | 2026-07-01 | 2026-07-01 | 2 | PROJECT TITLE: I-494 E-ZPASS PROJECT (MSP AIRPORT TO US 169) IN BLOOMINGTON & RICHFIELD :::: PROJECT DESCRIPTION: I-494: FROM 0.3 MI E OF US 169 TO 0.8 MI W OF MN 100, AND FROM I-35W TO E OF 24TH AVE AND ON I-35W, FROM 86TH ST TO 76TH ST IN EDINA, BLOOMINGTON AND RICHFIELD- CONSTRUCT E-ZPASS LANES, MOBILITY AND SAFETY IMPROVEMENTS, RECONSTRUCT MAINLINE PAVEMENT, DRAINAGE, ADA, LIGHTING, SIDEWALK/TRAIL, CONSTRUCT NEW BRIDGE 27430, REPLACE BRIDGES 9289 (NEW BR 27425), 9213 (NEW BR 27429), 9081A & 9081 (NEW BR 27W58) AND 9082 (NEW BR 27W59), PRESERVATION ON BRIDGES 9078 (PED BR), 27V63, 27V38, 27052B, 27052D, 27424, 27V33, 27V35 AND 27408, UTILITIES AND REPLACE SIGNALS AT FRANCE AVE AND 82ND ST | $113.00M |
| 693JJ22630000Y001MN0077308↗ | Department of Transportation | MINNESOTA DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-02-26 | 2026-09-17 | 4 | PROJECT TITLE: MN 77: FROM 138TH ST W IN APPLE VALLEY TO 0.7 MI N OF MN 13 IN EAGAN (AT DAKOTA/HENNEPIN CO LN)- UNBONDED CONCRETE OVERLAY, MILL & OVERLAY (CONT) :::: PROJECT DESCRIPTION: HIGH TENSION CABLE GUARDRAIL, ADA, TMS, LIGHTING, SIGNALS & SIGNING | $34.00M |
| 693JJ22630000Y001MNI494013↗ | Department of Transportation | MINNESOTA DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-07-01 | 2026-07-01 | 2 | PROJECT TITLE: I-494 E-ZPASS PROJECT (MSP AIRPORT TO US 169) IN BLOOMINGTON & RICHFIELD :::: PROJECT DESCRIPTION: I-494: FROM 0.3 MI E OF US 169 TO 0.8 MI W OF MN 100, AND FROM I-35W TO E OF 24TH AVE AND ON I-35W, FROM 86TH ST TO 76TH ST IN EDINA, BLOOMINGTON AND RICHFIELD- CONSTRUCT E-ZPASS LANES, MOBILITY AND SAFETY IMPROVEMENTS, RECONSTRUCT MAINLINE PAVEMENT, DRAINAGE, ADA, LIGHTING, SIDEWALK/TRAIL, CONSTRUCT NEW BRIDGE 27430, REPLACE BRIDGES 9289 (NEW BR 27425), 9213 (NEW BR 27429), 9081A & 9081 (NEW BR 27W58) AND 9082 (NEW BR 27W59), PRESERVATION ON BRIDGES 9078 (PED BR), 27V63, 27V38, 27052B, 27052D, 27424, 27V33, 27V35 AND 27408, UTILITIES AND REPLACE SIGNALS AT FRANCE AVE AND 82ND ST | $31.94M |
| 693JJ22630000Y001MN0012325↗ | Department of Transportation | MINNESOTA DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-01-21 | 2026-07-07 | 3 | PROJECT TITLE: US 12: 1385’ W OF CSAH 15 (SHORELINE DR) IN WAYZATA TO 315’ E OF I-494 IN MINNETONKA- RECONSTRUCTION, MILL & OVERLAY, CONCRETE PAVEMENT REHAB, (CONT) :::: PROJECT DESCRIPTION: ADA, LIGHTING, SIGNALS, TMS, REPLACE ADA PLATE COVERS ON BR 27131, 27132 & 27655, PIER STRUTS ON BRIDGES 27129 & 27130 | $26.83M |
| 693JJ22630000Y001MNI35W019↗ | Department of Transportation | MINNESOTA DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-09-23 | 2026-09-23 | 1 | PROJECT TITLE: I-35W: SOUTHCROSS DR TO 0.51 MI N OF CLIFF ROAD IN BURNSVILLE: MILL BIT PAVEMENT, CONCRETE OVERLAY, RECONSTRUCT CONCRETE & BIT PAVEMENT (CONT) :::: PROJECT DESCRIPTION: CONSTRUCT ADDITIONAL SB EXIT TO BUCK HILL RD, ROUNDABOUT, INSTALL CONTINUOUS LIGHTING, CONSTRUCT AUXILIARY LANES, TMS, REPLACE BR 6583 W/NEW BR 19911, REPLACE BR 9779 W/NEW BR 19098, REPLACE BR 9780 W/NEW BR 19097, REPLACE BR 19863 W/NEW BR 19912, HIGH TENSION CABLE MEDIAN BARRIER, ADA IMPROVEMENTS, SIGNAL, SIGNING, SHARED-USE PATH, REINFORCED SOIL SLOPES & SLOPE REPAIR UNDER BR #19522 | $26.32M |
| 693JJ22640004YP04MN1025262RURL↗ | Department of Transportation | MINNESOTA DEPARTMENT OF TRANSPORTATION | PROJECT GRANT (B) | 2026-01-13 | 2026-01-13 | 1 | PROJECT TITLE: HIGHWAY 5 MOBILITY AND IMPROVEMENT PROJECT :::: PROJECT DESCRIPTION: MN 5 (ARBORETUM BLVD): IN VICTORIA & CHANHASSEN, FROM 0.08 MI E OF CSAH 11 TO 0.29 MI E OF MN 41 (CENTURY BLVD) & ON MN 41, FROM 0.33 MI S OF MN 5 TO 0.49 MI N OF MN 5 & ON CSAH 13, FROM 0.05 MI N OF CSAH 18 TO 0.39 MI S OF MN 7- RECONSTRUCTION, TWO TO FOUR LANE CONVERSION, ROUNDABOUTS, CONSTRUCT NEW BRIDGE 10064, CONSTRUCT NEW CULVERTS 10X26, 10X27, 10X28 & 10X29, BIKE TRAILS, ADA, SIGNALS, TMS, MEDIAN CHANNELIZATION & ON MSAS 104 (78TH ST) AT MN 5 IN VICTORIA- CONSTRUCT PEDESTRIAN BRIDGE #10065 | $25.00M |