| 99662726↗ | Environmental Protection Agency | TEXAS COMMISSION ON ENVIRONMENTAL QUALITY | FORMULA GRANT (A) | 2026-03-10 | 2026-07-16 | 3 | DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING FOR THE OPERATION OF THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY'S (TCEQ) CONTINUING ENVIRONMENTAL PROGRAMS WHILE GIVING IT GREATER FLEXIBILITY TO ADDRESS ITS HIGHEST ENVIRONMENTAL PRIORITIES, IMPROVE ENVIRONMENTAL PERFORMANCE, ACHIEVE SAVINGS AND STRENGTHEN THE PARTNERSHIP BETWEEN TCEQ AND THE ENVIRONMENTAL PROTECTION AGENCY (EPA). THIS AGREEMENT FUNDS STATE CONTINUING ENVIRONMENTAL PROGRAMS FOR AIR, WATER, LAND, POLLUTION PREVENTION AND CHEMICAL SAFETY.
ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE ASSISTING THE TCEQ IN ADMINISTERING THE STATE'S BASE WATER QUALITY PROGRAM THAT AIMS TO PREVENT, REDUCE, AND ELIMINATE WATER POLLUTION THROUGH STANDARD-SETTING, MONITORING, PERMITTING AND ENFORCEMENT ACTIVITIES AND TO ASSIST IN ADMINISTERING THE STATE'S ENVIRONMENTAL MANAGEMENT PROGRAMS WHICH MONITORS, ABATES, AND CONTROLS HAZARDOUS, SOLID WASTE, AIR POLLUTION AND PESTICIDES.
SUBRECIPIENT:SUBRECIPIENT ACTIVITIES INCLUDE MONITORING AND ASSESSMENT WHICH WILL ASSIST TCEQ IN ESTABLISHING AND MAINTAINING ADEQUATE MEASURES FOR PREVENTION AND CONTROL OF SURFACE AND GROUNDWATER POLLUTION. ADDITIONALLY, SUBAWARDS ARE LOCAL AIR PROGRAMS TO OPERATE, SUPPORT, AND MAINTAIN AIR MONITORING STATIONS.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE ANNUAL AND FINAL PROGRESS REPORTS, QUALITY ASSURANCE PROJECT PLANS AND FINAL PROJECT REPORTS. THE EXPECTED OUTCOMES FROM THIS AGREEMENT ARE ASSOCIATED WITH MANAGING CONTINUING ENVIRONMENTAL PROGRAMS WHICH INCLUDE ACTIVITIES TO PROTECT AND MAINTAIN AIR, WATER, LAND, POLLUTION PREVENTION AND CHEMICAL SAFETY. DIRECT BENEFICIARIES OF THIS PROGRAM ARE THE CITIZENS OF THE STATE OF TEXAS. | $30.65M |
| GNSSP26TX0083↗ | Gulf Coast Ecosystem Restoration Council | TEXAS COMMISSION ON ENVIRONMENTAL QUALITY | GRANT | 2026-09-01 | 2026-09-01 | 1 | FY27 RESTORE BK 3 TLACC --- THE STATE OF TEXAS, THROUGH THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ), WAS AWARDED OIL SPILL IMPACT COMPONENT FUNDING FOR THE TEXAS LAND ACQUISITION PROGRAM FOR COASTAL CONSERVATION TO BUILD UPON AND EXPAND THE PROGRAM ORIGINALLY ESTABLISHED WITH COUNCIL-SELECTED RESTORATION COMPONENT FUNDING. TCEQ WILL CONTINUE THIS SUCCESSFUL CONSERVATION PROGRAM IN SUPPORT OF THE PRIMARY RESTORE COMPREHENSIVE PLAN GOAL TO RESTORE AND CONSERVE HABITAT BY ACQUIRING ADDITIONAL LARGE COASTAL ZONE PROPERTIES OR CONSERVATION EASEMENTS TO PRESERVE HIGH-QUALITY HABITAT ALONG THE TEXAS COAST AND PROMOTE LONG-TERM HABITAT MANAGEMENT. THROUGH CONSERVATION OF VALUABLE COASTAL LANDS, THIS PROGRAM PROTECTS HABITAT THAT IN TURN HELPS PROTECT WATER QUALITY IN TEXAS RIVERS, BAYS, AND MARSHES, PROMOTES COMMUNITY RESILIENCE BY PROVIDING NATURAL BUFFERS, DECREASES THE NEED FOR HARD-ENGINEERED PROJECTS, AND PROVIDES ADDITIONAL ECOSYSTEM AND COMMUNITY SERVICES. | $20.54M |
| GT3CP26TX0011↗ | Gulf Coast Ecosystem Restoration Council | TEXAS COMMISSION ON ENVIRONMENTAL QUALITY | GRANT | 2026-03-13 | 2026-03-13 | 1 | FY26 RESTORE LIVING SHORELINE PROTECTION BKT 2 --- THE STATE OF TEXAS, THROUGH THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ), HAS BEEN AWARDED COUNCIL-SELECTED RESTORATION COMPONENT FUNDING FOR THE SHORELINE PROTECTION THROUGH LIVING SHORELINES PROGRAM. THIS PROGRAM WILL CONSTRUCT LARGE-SCALE LIVING SHORELINES THAT WILL STABILIZE ESTUARINE SHORELINES AND PROTECT LARGE TRACTS OF LAND AND COASTAL RESOURCES ALONG THE TEXAS COAST. LIVING SHORELINES CONSIST OF MARSH VEGETATION PLANTING TYPICALLY COMBINED WITH ROCK BREAKWATERS OR OYSTER REEFS TO PROTECT BAY SHORELINES AND MARSHES FROM LOSS DUE TO EROSION. THE PROGRAM WILL TARGET HIGHLY ERODING SHORELINES ALONG THE GULF INTRACOASTAL WATER WAY (GIWW), VULNERABLE BAY SHORELINES, AND LOCATIONS THAT HAVE BEEN IDENTIFIED AS SUITABLE AREAS FOR A LIVING SHORELINE INSTALLATION. THE PROGRAM WILL ALSO ADDRESS DEGRADING COASTAL STRUCTURES THAT NEED REPAIR, SUCH AS CRITICAL SEAWALLS, AND ADD LIVING SHORELINE ELEMENTS TO ENHANCE THEIR PROTECTIVE CAPABILITIES. LIVING SHORELINES CAN REDUCE DAMAGE TO SHORELINES BY DAMPENING WAVE ACTION AND TRAPPING SEDIMENTS, ELEVATING SHORE PROFILES TO A LEVEL THAT WILL SUPPORT MARSH VEGETATION. THIS PROGRAM WILL PROVIDE ECOSYSTEM SERVICES BY CREATING HARD STRUCTURE HABITATS FOR FISH AND OYSTERS, NUTRIENT AND SEDIMENT REMOVAL, SEAGRASS PROTECTION, AND WATER QUALITY IMPROVEMENT. | $14.90M |
| GT3CP26TX0012↗ | Gulf Coast Ecosystem Restoration Council | TEXAS COMMISSION ON ENVIRONMENTAL QUALITY | GRANT | 2026-07-06 | 2026-07-06 | 1 | FY26 RESTORE FPL3B WTR QTY B2 --- THE STATE OF TEXAS, THROUGH THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ), WAS AWARDED COUNCIL-SELECTED RESTORATION COMPONENT FUNDING FOR THE TEXAS COASTAL WATER QUALITY PROGRAM. THE DEGRADATION OF WATER QUALITY ON THE TEXAS COAST HAS PUT THE ENVIRONMENTAL HEALTH OF COASTAL ECOSYSTEMS AT RISK. WATER QUALITY IN TEXAS IS ADVERSELY IMPACTED BY DIVERTED FRESHWATER INFLOWS AND INCREASED NUTRIENT INPUT FROM AGRICULTURE. THIS PROGRAM AIMS TO RESTORE WATER QUALITY AND FRESHWATER INFLOWS ON THE TEXAS COAST USING A VARIETY OF PROVEN METHODS THAT WILL ENHANCE THE NATURAL ENVIRONMENT INCLUDING: THE IMPLEMENTATION OF BEST MANAGEMENT PRACTICES (BMPS) IN TEXAS COASTAL WATERSHEDS TO REDUCE NON-POINT SOURCE POLLUTION, THE REPAIR AND ENHANCEMENT OF DRAINAGE CHANNELS AND OUTFALLS TO IMPROVE STORMWATER FLOW AND INCREASE FRESHWATER INFLOW TOADJACENT MARSHES, AND THE CONSTRUCTION OF LIVING SHORELINE FEATURES TO REDUCE EROSION AND IMPROVE WATERQUALITY. THIS PROGRAM WILL ADDRESS ENVIRONMENTAL ISSUES FOCUSED ON STORMWATER RUNOFF, FRESHWATER INFLOWS,FLOODPLAIN MANAGEMENT, SEDIMENT CONTROL AND WATER QUALITY FOR ACTIVITIES RELATED TO COASTAL COMMUNITIES,WETLANDS, AND AGRICULTURE. | $4.96M |
| RDCGR480090↗ | Department of the Treasury | TEXAS COMMISSION ON ENVIRONMENTAL QUALITY | FORMULA GRANT (A) | 2026-07-16 | 2026-07-16 | 1 | PURPOSE THE FY19 RESTORE FLOOD PROTECTION BKT 1 GRANT IS AWARDED TO THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY TCEQ UNDER THE RESTORE ACT DIRECT COMPONENT PROGRAM FOR SIX INDIVIDUAL PROJECTS TO PROTECT THE TEXAS GULF COAST REGION FROM FLOODING. THE SIX PROJECTS UNDER TCEQS PROGRAM ARE AS FOLLOWS 1 BAY SHORE DRIVE EROSION MITIGATION AND SHORELINE STABILIZATION; 2 RAYMONDVILLE DRAIN PROJECT PHASE 2; 3 VILLAGE OF SURFSIDE BEACH GROIN; 4 TEXAS CITY HURRICANE PROTECTION LEVEE REPAIR PHASE I; 5 TOWN RESACA PROJECT; AND 6 BESSIE HEIGHTS DRAINAGE OUTFALL REPAIR AND IMPROVEMENT PROJECT.ACTIVITIES TO BE PERFORMED THE SIX PROJECTS WILL IMPROVE INFRASTRUCTURE AND DRAINAGE, PREVENT EROSION, AND REPAIR LEVIES TO REDUCE FLOODING RISK.GOALEXPECTED OUTCOMES THE GOALS OF THE PROJECTS UNDER THE FLOOD PROTECTION PROGRAM ARE TO BUILD RESILIENT INFRASTRUCTURE AND COMMUNITIES AGAINST FLOODS.BENEFICIARIES THE PROJECT WILL BENEFIT THE TEXAS GULF COAST REGION.SUBRECIPIENT ACTIVITIES THERE ARE SIX SEPARATE SUBRECIPIENTS FOR THIS PROGRAM GRANT, ONE PER PROJECT 1 BAY SHORE DRIVE EROSION MITIGATION AND SHORELINE STABILIZATION SUBRECIPIENT ARANSAS COUNTY; 2 RAYMONDVILLE DRAIN PROJECT PHASE 2 SUBRECIPIENT HIDALGO COUNTY DRAINAGE DISTRICT NUMBER ONE; 3 VILLAGE OF SURFSIDE BEACH GROIN SUBRECIPIENT INITIALLY VILLAGE OF SURFSIDE, AMENDED TO THE TEXAS GENERAL LAND OFFICE; 4 TEXAS CITY HURRICANE PROTECTION LEVEE REPAIR PHASE I SUBRECIPIENT GALVESTON COUNTY; 5 TOWN RESACA PROJECT SUBRECIPIENT BROWNSVILLE PUBLIC UTILITIES BOARD; 6 BESSIE HEIGHTS DRAINAGE OUTFALL REPAIR AND IMPROVEMENT PROJECT ORANGE COUNTY DRAINAGE DISTRICTREASON FOR MODIFICATION AMENDMENT 5 EXTENDS THE AWARD39;S PERIOD OF PERFORMANCE BY 50 MONTHS SO THAT THE REVISED PERIOD OF PERFORMANCE IS NOW FROM JULY 1, 2019 TO AUGUST 31, 2030. THIS AMENDMENT WILL ALSO INCREASE THE DIRECT COMPONENT DC GRANT BY 3,938,717.00 FOR A REVISED TOTAL DC GRANT AMOUNT OF 36,743,260.00 TO COVER ADMINISTRATIVE COSTS AND EXPENSES FOR WORK ON TWO PROJECTS; THIRD-PARTY FUNDS WILL BE INCREASED BY 2,885,537.00 FOR A REVISED TOTAL THIRD-PARTY FUNDING OF 4,282,516.00 FOR MANAGEMENT AND EXPENSES FOR WORK DONE ON TWO PROJECTS. THE BESSIE HEIGHTS DRAINAGE OUTFALL REPAIR AND IMPROVEMENT PROJECT IS ADDED TO THE AWARD WITH THIS AMENDMENT. | $3.94M |
| 98665313↗ | Environmental Protection Agency | TEXAS COMMISSION ON ENVIRONMENTAL QUALITY | GRANT | 2026-06-02 | 2026-08-25 | 3 | DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE STATE OF TEXAS TO CARRY OUT ITS PROGRAM TO MAINTAIN, PROTECT, AND IMPROVE THE WATER QUALITY OF ITS RIVERS, LAKES, STREAMS, GROUNDWATER, AND OTHER WATERBODIES. THE ENVIRONMENTAL BENEFITS OF THIS PROGRAM INCLUDE PREVENTING DEGRADATION OF UNIMPAIRED WATERBODIES AND REDUCING THE NUMBER OF IMPAIRED WATERBODIES IN THE STATE.
ACTIVITIES:ACTIVITIES INCLUDE DEVELOPMENT OF TOTAL MAXIMUM DAILY LOADS, WATER QUALITY MONITORING, WATER QUALITY STANDARDS DEVELOPMENT AND IMPLEMENTATION, GROUND WATER MONITORING, STORM WATER TECHNOLOGIES AND PERMITTING.
SUBRECIPIENT:SUBRECIPIENT ACTIVITIES INCLUDE MONITORING AND ASSESSMENT WHICH WILL ASSIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) IN ESTABLISHING AND MAINTAINING ADEQUATE MEASURES FOR PREVENTION AND CONTROL OF SURFACE AND GROUNDWATER POLLUTION.OUTCOMES:THE ANTICIPATED DELIVERABLES TO BE PROVIDED UNDER THIS AGREEMENT ARE: ANNUAL PROGRESS REPORTS, QUALITY ASSURANCE PROJECT PLANS AND FINAL PROJECT REPORTS. THE EXPECTED OUTCOMES RESULTING FROM THESE EFFORTS INCLUDE RESTORING TEXAS' IMPAIRED WATERS AND PROTECTING HEALTHY WATERS BY PREVENTING, REDUCING, AND ELIMINATING WATER POLLUTION THROUGH STANDARD-SETTING, MONITORING, AND PERMITTING. DIRECT BENEFICIARIES OF THIS ASSISTANCE AGREEMENT INCLUDE RESIDENTS OF THE STATE OF TEXAS. | $3.41M |
| 02F62601↗ | Environmental Protection Agency | TEXAS COMMISSION ON ENVIRONMENTAL QUALITY | GRANT | 2026-06-11 | 2026-06-11 | 1 | DESCRIPTION:THE AGREEMENT PROVIDES ASSISTANCE TO TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) TO IMPLEMENT A PROGRAM OF VOLUNTARY TESTING FOR LEAD IN DRINKING WATER AT LOCAL SCHOOLS AND CHILDCARE CENTERS. SPECIFICALLY, THE RECIPIENT WILL OVERSEE AND FUND THE LEAD TESTING IN SCHOOL AND CHILDCARE PROGRAM DRINKING WATER GRANT PROGRAM FOR TEXAS SCHOOLS INCLUDING SAMPLING, OUTREACH, COMMUNICATION, AND REMEDIATION.
ACTIVITIES:THE ACTIVITIES INVOLVE IMPLEMENTATION OF THE LEAD TESTING IN DRINKING WATER IN SCHOOLS AND CHILDCARE FACILITIES PROGRAM, ACCORDING TO THE ENVIRONMENTAL PROGRAM AGENCY'S (EPA) TRAINING, TESTING, AND TAKING ACTION (3TS) GUIDANCE FOR REDUCING LEAD CONTAMINATION. THIS INCLUDES PUBLIC COMMUNICATION ABOUT LEAD TESTING PROGRAMS AND RESULTS, TRAINING OFFICIALS ON LEAD-RELATED HEALTH EFFECTS, AND CONDUCTING TESTS TO IDENTIFY ISSUES. THE GOAL IS TO DEVELOP AND IMPLEMENT A PLAN TO REDUCE LEAD CONTAMINATION AND EFFECTIVELY COMMUNICATE WITH PARENTS, STAFF, AND THE COMMUNITY.
SUBRECIPIENT:PASS-THROUGH CONTRACT WITH UNIVERSITY OF TEXAS-ARLINGTON FOR QUALITY ASSURANCE PROJECT PLAN (QAPP) REVIEW.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE NUMBER OF PRESENTATIONS/PARTICIPANTS TRAINED TO ESTABLISH LOCAL SAMPLING PROGRAMS BASED ON ENVIRONMENTAL PROTECTION AGENCY'S (EPA) 3TS GUIDANCE, DEVELOPMENT OF PROGRAM DOCUMENTS AND ENSURE GRANT OBJECTIVES ARE MET, COORDINATION OF THE QUALITY ASSURANCE PROJECT PLAN (QAPP) WHICH ENSURES CONSISTENCY WITH PROGRAM REQUIREMENTS, ANNUAL REPORTING TO THE EPA, NUMBER OF SAMPLES RECEIVED BY LABORATORY THAT WERE SHIPPED BY PARTICIPANTS, AND NUMBER OF SAMPLES ANALYZED.
THE EXPECTED OUTCOMES INCLUDE IMPLEMENTING AND EXECUTION OF A SAMPLING AND MITIGATION LEAD EXPOSURE-BASED PROGRAM USING THE ENVIRONMENTAL PROTECTION AGENCY'S (EPA) 3TS GUIDANCE.
THE INTENDED BENEFICIARIES INCLUDE SCHOOLS AND CHILDCARES OF THE STATE OF TEXAS. | $3.31M |
| 99614631↗ | Environmental Protection Agency | TEXAS COMMISSION ON ENVIRONMENTAL QUALITY | GRANT | 2026-07-13 | 2026-07-13 | 1 | DESCRIPTION:THIS AGREEMENT PROVIDES SUPPORT TO THE STATE OF TEXAS TO IMPLEMENT ITS NONPOINT SOURCE MANAGEMENT PROGRAM, FOCUSING ON WATERSHEDS WITH WATER QUALITY IMPAIRMENTS CAUSED BY POLLUTED RUNOFF FROM NONPOINT SOURCES. NONPOINT SOURCE IMPLEMENTATION PROJECTS INCLUDE A VARIETY OF STRUCTURAL AND NON-STRUCTURAL BEST MANAGEMENT PRACTICES (BMPS), WATERSHED PLANNING, MONITORING, TECHNOLOGY DEMONSTRATIONS AND A VARIETY OF EDUCATION/OUTREACH PROGRAMS.
ACTIVITIES:THIS AGREEMENT PROVIDES SUPPORT TO THE STATE OF TEXAS TO IMPLEMENT ITS NONPOINT SOURCE MANAGEMENT PROGRAM, FOCUSING ON WATERSHEDS WITH WATER QUALITY IMPAIRMENTS CAUSED BY POLLUTED RUNOFF FROM NONPOINT SOURCES. NONPOINT SOURCE IMPLEMENTATION PROJECTS INCLUDE A VARIETY OF STRUCTURAL AND NON-STRUCTURAL BEST MANAGEMENT PRACTICES (BMPS), WATERSHED PLANNING, MONITORING, TECHNOLOGY DEMONSTRATIONS AND A VARIETY OF EDUCATION/OUTREACH PROGRAMS.
SUBRECIPIENT:1.01, TEXAS STREAM TEAM- STREAM TEAM WILL WORK STATEWIDE TO EXPAND ITS MONITORING NETWORK TO AREAS WITH AN ACCEPTED WPP, WHILE MAINTAINING SUPPORT FOR IMPAIRED AND PRIORITY WATERSHEDS. THE PROJECT WILL EQUIP BOTH NEW AND EXISTING MONITORING GROUPS WITH SUPPLIES IN THE LATEST APPROVED METHODS. BY PROVIDING ESSENTIAL RESOURCES AND HANDS#8208;ON INSTRUCTION, WE AIM TO STRENGTHEN LOCAL CAPACITY FOR WATERSHED PROTECTION PLAN IMPLEMENTATION. SPECIAL EMPHASIS WILL BE PLACED ON BROADENING NPS MONITORING IN IMPAIRED WATERBODIES TO DRIVE MEASURABLE IMPROVEMENTS IN WATER QUALITY ACROSS TEXAS.
1.02, EAST FORK SAN JACINTO RIVER WATERSHED PROTECTION PLAN IMPLEMENTATION: ON-SITE SEWAGE FACILITY REMEDIATION- THE EAST FORK SAN JACINTO RIVER, LOCATED IN THE PINEY WOODS OF EAST TEXAS, SERVES AS AN INLET TO LAKE HOUSTON. SEVERAL ASSESSMENT UNITS HAVE BEEN CLASSIFIED AS IMPAIRED FOR RECREATIONAL USE DUE TO ELEVATED BACTERIAL LEVELS. IN 2023, A STAKEHOLDER-LED STEERING COMMITTEE DEVELOPED THE EAST FORK SAN JACINTO WPP FOR THIS SECTION OF THE RIVER. THE WPP IDENTIFIED FAILING ON-SITE SEWAGE FACILITIES (OSSFS) AS A SIGNIFICANT CONTRIBUTOR TO BACTERIAL CONTAMINATION AND EMPHASIZED THAT REMEDIATION EFFORTS COULD SUBSTANTIALLY REDUCE IMPAIRMENT LEVELS. TISI PLANS TO IMPLEMENT OSSF REMEDIATION ACROSS AT LEAST THREE COUNTIES WITHIN THE WATERSHED. THIS EFFORT WILL INCLUDE TARGETED WATER SAMPLING, IN-HOUSE ANALYSIS AT THE TRIES ANALYTICAL LABORATORY, AND COMMUNITY OUTREACH AND WORKSHOPS TO BUILD RELATIONSHIPS WITH LANDOWNERS, ULTIMATELY FACILITATING THE PUMPING OR REPLACEMENT OF FAILING OSSFS.
1.03, CLEAR CREEK WATERSHED PROTECTION PLAN IMPLEMENTATION: VEGETATED ISLAND BMPS: THE HARRIS COUNTY FLOOD CONTROL DISTRICT (HCFCD) WILL ASSESS THE EFFICACY OF FLOATING VEGETATED ISLANDS (FVIS) IN REDUCING NONPOINT SOURCE POLLUTION IN THE LAWSON BASIN, PART OF THE CLEAR CREEK WATERSHED. THE PROJECT INVOLVES PRE- AND POST-IMPLEMENTATION WATER QUALITY SAMPLING, VEGETATION HEALTH ASSESSMENTS, AND DATA ANALYSIS TO QUANTIFY POLLUTANT LOAD REDUCTIONS (E.G., TOTAL SUSPENDED SOLIDS, NITROGEN, PHOSPHORUS, AND BACTERIA). THE ADDITION OF FVIS TO THE BASIN AS A PERMANENT, STRUCTURAL BMP ALIGNS WITH THE CLEAR CREEK WATERSHED PROTECTION PLAN'S (WPP) GOAL TO IMPLEMENT LOW IMPACT DEVELOPMENT. THE PROJECT WILL SUPPORT REGIONAL STORMWATER QUALITY IMPROVEMENT OBJECTIVES IDENTIFIED IN THE CLEAR CREEK WPP.
1.04, UPPER TRINITY RIVER BASIN WPPS IMPLEMENTATION PHASE 2: TRA WILL WORK WITHIN THE JOE POOL LAKE (JPL) AND VILLAGE CREEK-LAKE ARLINGTON (VCLA) WATERSHEDS TO CONTINUE THE ON-SITE SEWAGE FACILITIES (OSSF) PROGRAM EFFORTS IDENTIFIED IN BOTH THE JPL AND VLCA WATERSHED PROTECTION PLANS. THIS PHASE II PROJECT WILL CONTINUE EFFORTS FROM TCEQ PROJECT 24-50223 TO INSPECT, REPAIR AND/OR REPLACE UP TO 18 FAILING OR NON-EXISTENT OSSFS IN THE JPL AND VCLA WATERSHEDS. TRA WILL PERFORM ANNUAL UPDATES TO THE JPL AND VCLA WATERSHEDS OSSF GEODATABASE. TRA AND AGRILIFE EXTENSION WILL DELIVER EDUCATION PROGRAMS REGARDING PROPER MAINTENANCE OF OSSFS WITHIN THE WATERSHEDS. | $2.78M |