| 97T52626↗ | Environmental Protection Agency | GUAM WATERWORKS AUTHORITY | FORMULA GRANT (A) | 2026-04-22 | 2026-04-22 | 1 | DESCRIPTION:THIS AGREEMENT INCLUDES FISCAL YEAR 2025 INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) AWARDS, WHICH INCLUDES DRINKING WATER STATE REVOLVING FUND GENERAL SUPPLEMENTAL, CLEAN WATER STATE REVOLVING FUND GENERAL SUPPLEMENTAL, CLEAN WATER EMERGING CONTAMINANT FUNDS, DRINKING WATER EMERGING CONTAMINANT FUNDS, AND LEAD SERVICE LINE REPLACEMENT FUNDS. THE PROJECT WORKPLAN IS TARGETED TO MEET THE STATUTORY AND REGULATORY OBJECTIVES, MILESTONES, AND GOALS OF EPA'S STRATEGIC PLAN, IN CONJUNCTION WITH THE AUTHORITY AND LEGISLATIVE INTENT OF THE OMNIBUS TERRITORIES ACT. PLANNED PROJECTS ARE DERIVED FROM THE GUAM WATERWORKS AUTHORITY (GWA) PROJECT PRIORITY LIST. THE SPECIFIC PROJECT PRIORITIES MAY CHANGE THROUGHOUT THE PERIOD OF PERFORMANCE, WHICH ARE DEPENDENT ON THE NEEDS BASIS OF PROTECTING HUMAN HEALTH AND THE ENVIRONMENT. THIS YEAR'S AWARD WILL FUND CONSTRUCTION FOR FATS, OILS, AND GREASE (FOG) RECEIVING FACILITY AT NORTHERN DISTRICT WASTEWATER TREATMENT PLANT (NDWWTP), HAGATNA FORCEMAIN, GENERAL WATERLINE REPLACEMENT, BOOSTER PUMPS AND DIELDRIN MITIGATION.
THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $32,136,633. REFER TO TERMS AND CONDITIONS.
ACTIVITIES:THIS AGREEMENT INCLUDES INFRASTRUCTURE INVESTMENT AND JOBS ACT FUNDS FOR FISCAL YEAR 2025. THE FULL DETAILED WORKPLAN IS ATTACHED AND DESCRIBES THE OBJECTIVES, MILESTONES, AND GOALS THAT MEET THE REQUIREMENTS OF EPA'S STRATEGIC PLAN, GOVERNMENT PERFORMANCE AND RESULTS ACT (GPRA), STATUTES, REGULATIONS, AND IS BEING DONE WITH THE AUTHORITY AND LEGISLATIVE INTENT OF THE OMNIBUS TERRITORIES ACT. THE PROPOSED PROJECTS ARE TAKEN FROM THE USEPA APPROVED GUAM EPA PROJECT PRIORITY LIST, HOWEVER, THE SPECIFIC PROJECT PRIORITIES MAY CHANGE THROUGH THE YEARS DEPENDENT ON THE NEED OF ADDRESSING PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT. THE PROPOSED PROJECTS WILL FOCUS ON FOG RECEIVING FACILITY AT NDWWTP, HAGATNA FORCEMAIN, GENERAL WATERLINE REPLACEMENT, BOOSTER PUMPS AND DIELDRIN MITIGATION. THE PROPOSED ACTIVITIES AND BUDGET ARE DETAILED IN THE WORKPLAN, WHICH HAS BEEN NEGOTIATED AND APPROVED BY THE PROJECT OFFICER.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE WATER AND WASTEWATER SYSTEM IMPROVEMENT PROJECTS' PRIMARY OBJECTIVES INCLUDE REPLACING OLD LEAKING WATER MAINS, UPGRADING UNDERSIZED MAINS REDUCING WATER LOSS AND THUS REDUCING PUBLIC HEALTH RISKS, REDUCING OPERATIONS AND MAINTENANCE COSTS, IMPROVING USEFUL LIFE OF ASSETS, AND MANAGING WATER SOURCES FOR FUTURE GENERATIONS. THESE PROJECTS ALSO AIM TO REDUCE CONTAMINATION IN SELECTED WELLS AND IMPROVE CONVEYANCE OF WASTEWATER, PREVENTING SANITARY SEWER OVERFLOWS (SSOS) AND PROTECTING PUBLIC HEALTH. | $32.14M |
| 97T69027↗ | Environmental Protection Agency | GUAM WATERWORKS AUTHORITY | GRANT | 2026-08-25 | 2026-08-25 | 1 | DESCRIPTION:THE GOAL OF THIS COOPERATIVE AGREEMENT IS TO STRENGTHEN GUAM WATERWORKS AUTHORITY'S WATER AND WASTEWATER SYSTEMS THROUGH TARGETED INFRASTRUCTURE UPGRADES THAT IMPROVE RELIABILITY, EFFICIENCY, AND LONG-TERM SUSTAINABILITY. KEY OBJECTIVES INCLUDE MODERNIZING BOOSTER PUMP STATIONS BY REPLACING AGING EQUIPMENT, INTEGRATING ENERGY-EFFICIENT TECHNOLOGIES, AND ENHANCING SYSTEM MONITORING AND CONTROL THROUGH SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA). THE PRESSURE ZONE REALIGNMENT PHASE 3 PROJECT FURTHER SUPPORTS THESE EFFORTS BY OPTIMIZING SYSTEM HYDRAULICS, IMPROVING PRESSURE REGULATION ACROSS MULTIPLE SITES, AND INCREASING OVERALL OPERATIONAL RESILIENCE WITHIN THE ISLAND-WIDE DISTRIBUTION NETWORK.
ADDITIONAL OBJECTIVES FOCUS ON IMPROVING REGULATORY COMPLIANCE, OPERATIONAL SAFETY, AND SYSTEM PERFORMANCE ACROSS WASTEWATER INFRASTRUCTURE. THE FATS, OILS, AND GREASE (FOG) RECEIVING STATION INITIATIVE WILL ENHANCE PRETREATMENT CAPABILITIES AND SYSTEM MANAGEMENT, WHILE THE HAGATNA REDUNDANT FORCE MAIN AND HAGARING;TNTILDE;A REDUNDANT FORCE MAIN PHASE 2 PROJECT WILL REHABILITATE CRITICAL WASTEWATER PUMPING FACILITIES TO ENSURE RELIABLE CONVEYANCE AND COMPLIANCE WITH EPA REQUIREMENTS. THIS WORKPLAN EMPHASIZES CONSTRUCTION MANAGEMENT, ASSET LIFECYCLE EXTENSION, MINIMIZED SERVICE DISRUPTIONS, AND THE IMPLEMENTATION OF RESILIENT INFRASTRUCTURE TO PROTECT PUBLIC HEALTH, THE ENVIRONMENT, AND SUPPORT FUTURE GROWTH.
THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $30,016,000. REFER TO TERMS AND CONDITIONS.
ACTIVITIES:THE GRANT WILL FUND EXISTING BOOSTER PUMP STATION DESIGN CONTRACTS FOR VARIOUS EXISTING BOOSTER PUMP STATION UPGRADES. THE GRANT WILL ALSO FUND PROCUREMENT OF CONTRACTOR FOR CONSTRUCTION AND AANDE FIRMS FOR CONSTRUCTION MANAGEMENT SERVICES FOR: VARIOUS BOOSTER PUMP STATION UPGRADES, PRESSURE ZONE REALIGNMENT PROJECT PHASE 3, A FOG RECEIVING STATION, AND THE HAGATNA REDUNDANT FORCE MAIN AND HAGARING;TNTILDE;A REDUNDANT FORCE MAIN PHASE 2 PROJECTS TO REHABILITATE CRITICAL WASTEWATER PUMPING FACILITIES TO ENSURE RELIABLE CONVEYANCE AND COMPLIANCE WITH EPA REQUIREMENTS.
THIS AGREEMENT INCLUDES INFRASTRUCTURE INVESTMENT AND JOBS ACT FUNDS FOR FISCAL YEAR 2026. THE FULL DETAILED WORKPLAN IS ATTACHED AND DESCRIBES THE OBJECTIVES, MILESTONES, AND GOALS THAT MEET THE REQUIREMENTS OF EPA'S STRATEGIC PLAN, GOVERNMENT PERFORMANCE AND RESULTS ACT (GPRA), STATUTES, REGULATIONS, AND IS BEING DONE WITH THE AUTHORITY AND LEGISLATIVE INTENT OF THE OMNIBUS TERRITORIES ACT. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE WATER AND WASTEWATER SYSTEM IMPROVEMENT PROJECTS' PRIMARY OBJECTIVES INCLUDE REPLACING OLD LEAKING WATER MAINS, UPGRADING UNDERSIZED MAINS REDUCING WATER LOSS AND THUS REDUCING PUBLIC HEALTH RISKS, REDUCING OPERATIONS AND MAINTENANCE COSTS, IMPROVING USEFUL LIFE OF ASSETS, AND MANAGING WATER SOURCES FOR FUTURE GENERATIONS. THESE PROJECTS ALSO AIM TO REDUCE CONTAMINATION IN SELECTED WELLS AND IMPROVE CONVEYANCE OF WASTEWATER, PREVENTING SANITARY SEWER OVERFLOWS (SSOS) AND PROTECTING PUBLIC HEALTH. DIRECT BENEFICIARIES OF THIS PROGRAM INCLUDE ALL GUAM RESIDENTS AND OCCUPANTS, BOTH PERMANENT AND TEMPORARY. | $30.02M |
| 97T08025↗ | Environmental Protection Agency | GUAM WATERWORKS AUTHORITY | FORMULA GRANT (A) | 2026-04-01 | 2026-04-01 | 1 | DESCRIPTION:THIS ASSISTANCE AGREEMENT INCLUDES CURRENT DRINKING WATER STATE REVOLVING FUNDS AND CLEAN WATER STATE REVOLVING FUNDS. THE PROJECT WORKPLAN IS TARGETED TO MEET THE STATUTORY AND REGULATORY OBJECTIVES, MILESTONES, AND GOALS OF EPA'S STRATEGIC PLAN, IN CONJUNCTION WITH THE AUTHORITY AND LEGISLATIVE INTENT OF THE OMNIBUS TERRITORIES ACT. PLANNED PROJECTS ARE DERIVED FROM THE GUAM EPA PRIORITY LIST. THE SPECIFIC PROJECT PRIORITIES MAY CHANGE THROUGHOUT THE PERIOD OF PERFORMANCE, WHICH ARE DEPENDENT ON THE NEEDS BASIS OF PROTECTING HUMAN HEALTH AND THE ENVIRONMENT. ACTIVITIES:FUNDS WILL SUPPORT THE PROVISION OF SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) AND ELECTRICAL CONTROLS AND REHAB FOR THE UGUM DRINKING WATER TREATMENT PLANT WELL REHABS AND TREATMENTS, DRINKING WATER (DW) WELL ABANDONMENT DESIGN AND CONSTRUCTION. THESE PROJECTS WILL ADD RESILIENCY TO GUAM'S DW SYSTEM AND PROTECT PUBLIC HEALTH. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:DELIVERABLES WILL BE SUBSTANTIAL AND COMPLETE DESIGN OR CONSTRUCTION OF THE FIVE PROJECTS. THERE IS AN EXPECTATION OF INCREASED RESILIENCY AND A REDUCTION OF NON REVENUE WATER TO RESULT FROM THE PROJECTS. THE BENEFICIARIES WILL BE THE CITIZENS OF GUAM. | $10.51M |
| 97T08027↗ | Environmental Protection Agency | GUAM WATERWORKS AUTHORITY | GRANT | 2026-08-21 | 2026-08-21 | 1 | DESCRIPTION:THIS COOPERATIVE AGREEMENT INCLUDES CURRENT DRINKING WATER AND CLEAN WATER STATE REVOLVING FUNDS FOR FY-26. THE PROJECT WORKPLAN IS TARGETED TO MEET THE STATUTORY AND REGULATORY OBJECTIVES, MILESTONES, AND GOALS OF EPA'S STRATEGIC PLAN, IN CONJUNCTION WITH THE AUTHORITY AND LEGISLATIVE INTENT OF THE OMNIBUS TERRITORIES ACT. PLANNED PROJECTS ARE DERIVED FROM THE GUAM EPA PRIORITY LIST. THE SPECIFIC PROJECT PRIORITIES MAY CHANGE THROUGHOUT THE PERIOD OF PERFORMANCE, WHICH ARE DEPENDENT ON THE NEEDS BASIS OF PROTECTING HUMAN HEALTH AND THE ENVIRONMENT.
THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $4,194,000. REFER TO TERMS AND CONDITIONS. ACTIVITIES:THIS WORK PLAN OUTLINES THE ACTIVITIES NECESSARY TO CONSTRUCT A FATS, OIL, AND GREASE (FOG) RECEIVING AND TREATMENT FACILITY TO SUPPORT THE GUAM WATERWORKS AUTHORITY'S (GWA) FOG PROGRAM AND IMPROVE WASTEWATER SYSTEM OPERATIONS. THE OBJECTIVES OF THIS WORK PLAN INCLUDE COMPLETING THE CONSTRUCTION OF THE FACILITY AND ASSOCIATED INFRASTRUCTURE, PROVIDING CONSTRUCTION MANAGEMENT SERVICES TO ENSURE TIMELY, COST-EFFECTIVE, AND COMPLIANT PROJECT DELIVERY, ESTABLISHING THE CAPABILITY TO RECEIVE AND PROPERLY TREAT FOG WITHIN THE WASTEWATER TREATMENT PROCESS, AND REDUCING THE DISCHARGE OF FOG INTO THE WASTEWATER COLLECTION SYSTEM.
SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE OBJECTIVES OF THIS WORK PLAN INCLUDE COMPLETING THE CONSTRUCTION OF THE FACILITY AND ASSOCIATED INFRASTRUCTURE, PROVIDING CONSTRUCTION MANAGEMENT SERVICES TO ENSURE TIMELY, COST-EFFECTIVE, AND COMPLIANT PROJECT DELIVERY, ESTABLISHING THE CAPABILITY TO RECEIVE AND PROPERLY TREAT FOG WITHIN THE WASTEWATER TREATMENT PROCESS, AND REDUCING THE DISCHARGE OF FOG INTO THE WASTEWATER COLLECTION SYSTEM. UPON COMPLETION, THE PROJECT WILL HELP MINIMIZE SEWER BLOCKAGES, REDUCE MAINTENANCE REQUIREMENTS ASSOCIATED WITH FOG ACCUMULATION, IMPROVE WASTEWATER SYSTEM RELIABILITY, AND SUPPORT THE LONG-TERM EFFECTIVENESS OF GWA'S FOG MANAGEMENT PROGRAM. DIRECT BENEFICIARIES OF THIS GRANT INCLUDE ALL GUAM RESIDENTS AND OCCUPANTS, BOTH PERMANENT AND TEMPORARY. | $4.19M |
| 98T45501↗ | Environmental Protection Agency | GUAM WATERWORKS AUTHORITY | GRANT | 2026-07-22 | 2026-07-22 | 1 | DESCRIPTION:THIS COOPERATIVE AGREEMENT PROVIDES FUNDING TO SUPPORT THE GUAM WATERWORKS AUTHORITY FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE STORMWATER INFRASTRUCTURE PROJECTS FOR WATER QUALITY IMPROVEMENT AND PROTECTION.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND DEVELOPMENT OF STORMWATER INFRASTRUCTURE PROJECTS.
SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE: PLANS, DESIGNS, AND/OR CONSTRUCTED STORMWATER INFRASTRUCTURE.
THE OUTCOMES PROVIDED FROM THIS GRANT ARE EXPECTED TO PROTECT PUBLIC HEALTH AND IMPROVE WATER QUALITY BY REDUCING SEWER OVERFLOWS THROUGH THE MANAGEMENT OF STORMWATER.
THE INTENDED BENEFICIARIES ARE: MUNICIPAL ENTITIES, OF WHICH, MAY BE RURAL COMMUNITIES. | $564.0K |
| D23AP00188↗ | Department of the Interior | GUAM WATERWORKS AUTHORITY | GRANT | 2026-03-31 | 2026-07-29 | 2 | THE PURPOSE OF THIS AWARD IS TO IMPROVE GWAS ABILITY TO LOCATE SUBSURFACE WATER LINE LEAKS AND ABILITY TO INSPECT AND CLEAN GWAS WASTEWATER COLLECTOR LINES INCLUDING INACCESSIBLE LINES. THESE GOALS WILL BE ACCOMPLISHED THROUGH CLASSROOM AND FIELD TRAINING. GWA WILL PROCURE TRAINERS RECOMMENDED BY THE MANUFACTURER OF THE RELATED EQUIPMENT TO TRAIN GWA STAFF ON ADVANCED LEAK DETECTION TECHNOLOGY AND SPECIALIZED FACILITY INSPECTION EQUIPMENT. GWA LEAK DETECTION UNIT WILL BE FULLY EQUIPPED WITH UPDATED LEAK DETECTION EQUIPMENT AND MODERN METHODS OF DETECTING SUBSURFACE LEAKS WITHIN THE WATER DISTRIBUTION SYSTEM. THIS ALLOWS FOR A REDUCTION IN UNACCOUNTED FOR WATER, REDUCED MANHOURS FOR WATER LEAK REPAIRS, AND IMPROVED WATER SYSTEM PRESSURES. GWAS WASTEWATER COLLECTIONS TEAM WILL ALSO HAVE NEW AND ADVANCED EQUIPMENT THAT WILL ALLOW FOR A MORE EFFICIENT MEANS OF CLEANING AND INSPECTING SEWER LINES IN INACCESSIBLE OR ENVIRONMENTALLY SENSITIVE AREAS. ADDITIONALLY, GWAS SPECIAL OPS DIVISION WILL HAVE THE ABILITY TO INSPECT CUSTOMER CONNECTION TO IMPROVE GWAS RECORDKEEPING AND DATABASE, IMPROVE ENFORCEMENT OF SEWER CONNECTION REQUIREMENTS, WHILE MINIMIZING SAFETY HAZARDS. NO GRANT FUNDS WILL BE ALLOTTED FOR SUBRECIPIENTS. | $0 |
| R24AP00561↗ | Department of the Interior | GUAM WATERWORKS AUTHORITY | GRANT | 2026-04-13 | 2026-04-13 | 1 | THE GUAM WATERWORKS AUTHORITY (GWA), LOCATED ON THE UNITED STATES ISLAND TERRITORY OF GUAM IN THE WESTERN PACIFIC OCEAN, WILL DESIGN AN UPGRADE TO THE SANTA RITA SPRINGS FACILITY TO ENHANCE AND PROTECT PRODUCTION FROM AVAILABLE RESOURCES. A MAJORITY OF WATER FOR THE CENTRAL PART OF THE ISLAND IS PURCHASED FROM THE US NAVY. THE SPRING UPGRADE WILL BE DESIGNED TO CAPTURE THE MAXIMUM VOLUME OF SPRING DISCHARGE BY THE ADDITION OF A CUTOFF WALL, COLLECTION SYSTEM, ASSOCIATED PUMPS AND AUTOMATIC DIVERSION VALVES. THE MAXIMIZING OF WATER FROM THE SPRING WILL LEAD TO REDUCE COSTS AND STRENGTHEN A RELIABLE WATER SOURCE IN THE CENTRAL WATER SYSTEM ON THE ISLAND OF GUAM. THE PROJECT HAS BEEN APPROVED AND INCLUDED ON THE FISCAL YEAR 2022-23 SAFE DRINKING WATER INFRASTRUCTURE GRANT PROJECT PRIORITY LIST. | $0 |
| D20AP00137↗ | Department of the Interior | GUAM WATERWORKS AUTHORITY | PROJECT GRANT (B) | 2026-02-13 | 2026-02-13 | 2 | MAP-GUAM-2020-2 GUAM WATERWORKS AUTHORITY GWA - OPERATIONS AND MAINTENANCE TRAINING | -$1.9K |