| 6973GH26F01405↗ | Department of Transportation | C.N.S. COMMUNICATIONS, LLC | DELIVERY ORDER | 2026-09-10 | 2026-09-10 | 1 | IIJA FUNDS. CONDUCT INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT COLUMBUS, OH (CMHA ASR) JCN:26003120 | $378.0K |
| 6973GH26F01423↗ | Department of Transportation | C.N.S. COMMUNICATIONS, LLC | DELIVERY ORDER | 2026-09-15 | 2026-09-15 | 1 | EG 2025 OUTDOOR EG BASELINE INSTALLATION FUNDING DAYTON, OH (DAY) ASR JCN: 19006005 | $378.0K |
| 6973GH22F00936↗ | Department of Transportation | C.N.S. COMMUNICATIONS, LLC | DELIVERY ORDER | 2026-01-07 | 2026-06-23 | 2 | IIJA FUNDS. THIS PURPOSE OF THIS BILATERAL MODIFICATION IS TO ALLOCATE FUNDING FOR THE FEDERAL AVIATION ADMINISTRATION'S UPS TEMPORARY TRAILER RELOCATIONS THROUGHOUT THE NATIONAL AIRSPACE SYSTEM. | $296.0K |
| 6973GH22F01676↗ | Department of Transportation | C.N.S. COMMUNICATIONS, LLC | DELIVERY ORDER | 2025-12-10 | 2026-04-14 | 4 | IIJA FUNDS, CHANGE ORDER IS TO FUND THE COSTS ASSOCIATED WITH THE UTILITY AND CUTOVER DELAY FROM FEBRUARY 20, 2026 TO MARCH 14, 2026 AT MERCED, CA (MCE) ASR JCN:22001391 | $227.2K |
| 6973GH25F01076↗ | Department of Transportation | C.N.S. COMMUNICATIONS, LLC | DELIVERY ORDER | 2026-06-25 | 2026-07-06 | 2 | F11 CPDS FUNDING IS ALLOCATED FOR A TEMPORARY LOGISTICS SITE DEDICATED TO STAGING, INSPECTING, AND REPAIRING CPDS PROJECT EQUIPMENT EXCLUSIVELY. JCN: N/A | $187.5K |
| 6973GH22F00196↗ | Department of Transportation | C.N.S. COMMUNICATIONS, LLC | DELIVERY ORDER | 2026-01-07 | 2026-06-03 | 2 | THIS BILATERAL MODIFICATION ALLOCATES FUNDING FOR THE FEDERAL AVIATION ADMINISTRATION'S UPS TEMPORARY TRAILER RELOCATIONS THROUGHOUT THE NATIONAL AIRSPACE SYSTEM, THE UPS CHARGING STATION MONTHLY RENTAL IN CNS'S WAREHOUSE, AND THE UPS TEMPO | $170.0K |
| 6973GH24F00940↗ | Department of Transportation | C.N.S. COMMUNICATIONS, LLC | DELIVERY ORDER | 2026-01-06 | 2026-01-06 | 1 | SITE SPECIFIC INSTALLATION INCLUDES THE REMOVAL OF 2,000-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, (10) BOLLARDS AND CONCRETE FST PAD; AND INSTALLATION OF 2,000-GALLON AST, ABOVEGROUND SUPPLY AND R | $130.8K |
| 6973GH26F00245↗ | Department of Transportation | C.N.S. COMMUNICATIONS, LLC | DELIVERY ORDER | 2026-01-06 | 2026-01-06 | 1 | FST FUNDED2024 DC BUS DEMO BASELINE SCOPE: CONDUCT REMOVAL AND DISPOSAL OF AST AND EG SYSTEMS PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT PEACH SPRINGS, AZ (PGS) RCAG JCN:24016128 | $129.5K |