| 69A36526421600RCEWA↗ | Department of Transportation | COUNTY OF, CHELAN | GRANT | 2026-09-25 | 2026-09-25 | 1 | THE PROJECT INCLUDES AT-GRADE CROSSING IMPROVEMENTS INCLUDING AUTOMATIC CROSSING GATES WITH ACTIVE WARNING DEVICES SUCH AS DOUBLE SIDED FLASHING LIGHTS FOR VEHICULAR TRAFFIC, THE ADDITION OF A MULTI-USE TRAIL GRADE CROSSING, NEW GRADE CROSSING PANELS, THERMOPLASTIC RAILROAD CROSSING PAVEMENT MARKINGS, UPDATED STRIPING AND SIGNAGE AND AN ACCELERATION LANE ONTO MALAGA-ALCOA HWY IN ORDER TO KEEP THE RAILROAD SAFETY ZONE CLEAR. | $1.52M |
| R23AC00318↗ | Department of the Interior | COUNTY OF, CHELAN | COOPERATIVE AGREEMENT | 2026-07-06 | 2026-07-06 | 1 | AWARD PURPOSE: IPID CONSISTS OF WHAT WERE ONCE TWO SEPARATE IRRIGATION DISTRICTS AND ARE NOW JOINTLY OPERATED WITH SHARED INFRASTRUCTURE AND MANAGEMENT. IPID DIVERTS WATER FROM ICICLE CREEK AT RM 5.7 TO THE ICICLE CANAL AND DIVERTS WATER FROM PESHASTIN CREEK AT RM 2.4 TO THE PESHASTIN CANAL. THE PESHASTIN CANAL ALSO RECEIVES WATER FROM THE ICICLE CANAL, AT TIMES, WHEN FLOWS ARE LOW IN PESHASTIN CREEK. THE TWO DIVERSIONS DELIVER WATER THROUGH A NETWORK OF OPEN DITCHES, CANALS, FLUMES, AND PIPELINES TO IRRIGATE APPROXIMATELY 8,000 ACRES IN THE WENATCHEE RIVER VALLEY.BOTH ICICLE CREEK AND PESHASTIN CREEK EXPERIENCE VERY LOW FLOWS IN LATE SUMMER AND EARLY FALL, WHICH COINCIDES WITH PEAK IRRIGATION DEMAND. ADDITIONAL STREAMFLOW IS NEEDED IN BOTH ICICLE AND PESHASTIN CREEKS TO IMPROVE PASSAGE AND HABITAT CONDITIONS FOR BULL TROUT, CHINOOK SALMON, AND STEELHEAD. ACTIVITIES TO BE PERFORMED: PROVIDE PROJECT DEVELOPMENT AND DESIGN SUPPORT INCLUDING LANDOWNER COORDINATION, DESIGN REVIEW, OPERATION AND MAINTENANCE PLAN DEVELOPMENT SUPPORT AND STAKEHOLDER COMMUNICATION. EXPECTED DELIVERABLES OR OUTCOMES: THIS PROJECT WILL DELIVER WATER TO PART OF THE IPID CANAL SYSTEM THROUGH TWO PUMP STATIONS ON THE WENATCHEE RIVER THAT WOULD OPERATE THROUGHOUT THE IRRIGATION SEASON AND WOULD BE PAIRED WITH IMPROVEMENTS TO THE IPID DELIVERY SYSTEM NEEDED TO CONVEY WATER. THE RESULT WOULD ALLOW FOR A SIGNIFICANT REDUCTION IN DIVERSIONS FROM ICICLE CREEK AND THE ELIMINATION OF THE PESHASTIN CREEK DIVERSION AT RM 2.4. THIS WILL RESULT IN UP TO 49 CFS REMAINING IN PESHASTIN CREEK (SUMMER LOW FLOW IS ABOUT 3 CFS) AND UP TO 26-46 CFS REMAINING IN ICICLE CREEK. INTENDED BENEFICIARIES: THE PRIMARY BENEFIT TO THE PUBLIC OF THE ACTIVITIES TO BE PERFORMED THROUGH THIS AGREEMENT IS THE INCREASE IN-STREAM FLOW IN PESHASTIN AND ICICLE CREEKS, WHICH ARE CRITICAL HABITAT FOR ESA-LISTED SPRING CHINOOK SALMON AND STEELHEAD. ADDITIONAL FLOWS DURING CRITICAL SUMMER LOW-FLOW MONTHS ALSO HELP TO KEEP STREAM TEMPERATURES COOLER AND PROVIDE RESILIENCY AGAINST CLIMATE CHANGE, AS WARM STREAM TEMPERATURES CAN BE LETHAL TO ESA-LISTED SALMON AND STEELHEAD. SECONDARY BENEFITS INCLUDE CONSERVING WATER BY CONVERTING OPEN DITCHES TO AN ENCLOSED PIPE SYSTEM AND GREATER IRRIGATION WATER RELIABILITY FOR THE APPROXIMATELY 8000 ACRES OF COMMERCIAL FRUIT ORCHARD THAT ARE SERVED BY THE IPID SYSTEM.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | $1.26M |
| 26GN11061700308↗ | Department of Agriculture | COUNTY OF, CHELAN | COOPERATIVE AGREEMENT | 2026-09-16 | 2026-09-16 | 1 | THIS AGREEMENT WILL COMPLETE SEVERAL PRIORITY WATERSHED AND FOREST RESTORATION ACTIONS ON THE OKANOGAN-WENATCHEE NATIONAL FOREST IN THE STATE OF WASHINGTON. THE PROJECT WILL COMPLETE APPROXIMATELY 5,000 ACRES OF NON-COMMERCIAL THINNING, MAINTAIN 79 MILES OF ROADS, COMPLETE 27 ALLUVIAL WATER STORAGE PROJECTS, AND COMPLETE 9 AQUATIC ORGANISM PASSAGE/CULVERT PROJECTS. COLLECTIVELY THESE ACTIONS WILL IMPROVE WATERSHED HEALTH, RESTORE FISH PASSAGE, REDUCE EROSION IMPACTS, AND ENHANCE TERRESTRIAL AND AQUATIC ECOSYSTEM CONDITIONS. THIS AGREEMENT WILL IMPLEMENT RESTORATION ACTIVITIES, INCLUDING ENGINEERED DESIGN WORK, CONTRACTED CONSTRUCTION, CONSULTANT PROJECT MANAGEMENT, ROAD RESTORATION ACTIVITIES, AND TERRESTRIAL TREATMENT IMPLEMENTATION. | $1.06M |
| CLSS00000117876↗ | Department of Agriculture | COUNTY OF, CHELAN | PROJECT GRANT (B) | 2025-12-18 | 2025-12-18 | 1 | COMMUNITY PROJECT GRANTS CONGRESSIONALLY DELEGATED | $893.3K |
| R26AP00082↗ | Department of the Interior | COUNTY OF, CHELAN | GRANT | 2026-03-09 | 2026-03-09 | 1 | AWARD PURPOSE: CHELAN COUNTY, LOCATED IN CENTRAL WASHINGTON, WILL COMPLETE 60% DESIGNS FOR TWO SITES ON THE CLEAR CREEK TO RESTORE THE CREEK TO ITS HISTORIC CHANNEL, REMOVE FISH PASSAGE BARRIERS, AND SUPPORT STREAM ECOSYSTEM RESTORATION. THE CLEAR CREEK PROJECT SITE SUFFERS FROM HEAVY ALTERATION AND POOR HABITAT THREATENING THE VIABILITY OF ENDANGERED SPECIES ACT LISTED UPPER COLUMBIA STEELHEAD. LOW FLOWS AND HIGH TEMPERATURES ADVERSELY AFFECT THE SURVIVAL OF UPSTREAM MIGRATING, HOLDING ADULTS, AND REARING JUVENILES. THIS PROJECT ADDRESSES SPECIFIC RECOMMENDATIONS IN THE UPPER COLUMBIA SALMON RECOVERY PLAN AND IS INCLUDED IN CHELAN COUNTY S CLIMATE RESILIENCE STRATEGY TO CREATE WATER SUPPLY STAINABILITY THROUGH NATURE-BASED SOLUTIONS.ACTIVITIES TO BE PERFORMED: UNDER THIS AGREEMENT, THE RECIPIENT SHALL COMPLETE A 60% RESTORATION DESIGNS FOR TWO PROJECT SITES ON THE CLEAR CREEK TO RESTORE THE CREEK TO ITS HISTORIC CHANNEL AND REMOVE FISH PASSAGE BARRIERS. EXPECTED DELIVERABLES OR OUTCOMES: TO CREATE STABILITY IN THE AGRICULTURAL COMMUNITY OF CHELAN COUNTY BY MITIGATING DROUGHT THROUGH THE PROPOSED PROJECT CAN HELP CREATE MORE STABLE EMPLOYMENT FOR THE AGRICULTURAL FARM WORKING COMMUNITY. INTENDED BENEFICIARIES: IMPLEMENTATION OF THE PROPOSED DESIGN WILL CREATE ECONOMIC OPPORTUNITY BY PROVIDING LOCAL CONSTRUCTION JOBS AND HELP RESTORE SALMON AND STEELHEAD RUNS THAT WOULD BRING TOURISM AND RECREATION DOLLARS IN THE LOCAL COMMUNITY.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NONE | $372.9K |
| 25GN11061700305↗ | Department of Agriculture | COUNTY OF, CHELAN | COOPERATIVE AGREEMENT | 2026-09-16 | 2026-09-16 | 1 | THIS MODIFICATION ADDS FUNDS FOR IMPLEMENTATION OF THE SOUTH SHORE MACHINE THINNING PROJECT WHICH COVERS 79.8 ACRES OF MACHINE MASTICATION NEAR THE HIDDEN LAKE TRAILHEAD AND SOUTH SHORE LAKE WENATCHEE RECREATIONAL RESIDENCES. | $171.6K |
| 25FI11061700089↗ | Department of Agriculture | COUNTY OF CHELAN | OTHER REIMBURSABLE, CONTINGENT, INTANGIBLE, OR INDIRECT FINANCIAL ASSISTANCE | 2026-05-06 | 2026-06-15 | 4 | COOPERATIVE/ MUTUAL AID FIRE ASSISTANCE PAYMET / FMMI DOC NUM 1952926519 / VENDOR COUNTY OF CHELAN / START DATE 20250702 / END DATE 20250818 | $99.5K |
| 24LE11061700079↗ | Department of Agriculture | COUNTY OF, CHELAN | OTHER REIMBURSABLE, CONTINGENT, INTANGIBLE, OR INDIRECT FINANCIAL ASSISTANCE | 2026-08-12 | 2026-08-12 | 1 | THE AGREEMENT WAS MODIFIED TO ADD FUNDS TO SUPPORT THE 2026 ANNUAL PLAN OF WORK. ALL FUNDS WILL BE USED FOR PATROL ACTIVITIES AND PRESENCE DURING SPECIAL ENFORCEMENT SITUATIONS (FIRE EMERGENCIES, DRUG ENFORCEMENT, AND MONITORING CERTAIN LARGE GROUP GATHERINGS) ON AGENCY LANDS WITHIN THE COUNTY, PARTICULARLY DURING PEAK RECREATION/VISITATION SEASON. | $83.5K |