| AK-2026-007↗ | Department of Transportation | ALASKA RAILROAD CORPORATION | FORMULA GRANT (A) | 2026-02-10 | 2026-02-10 | 1 | APPLICATION PURPOSE: ENSURE THE TRACK STRUCTURE AND COMMUTER LOCOMOTIVE FLEET IS MAINTAINED IN A STATE OF GOOD REPAIR.; ACTIVITIES PERFORMED: TRACK REHABILITATION ACTIVITIES INCLUDE REPLACING RAIL TIES BALLAST AND DRAINAGE WORK. COMMUTER LOCOMOTIVE ACTIVITIES INCLUDE OVERHAULING ENGINE POWER ASSEMBLIES CAMSHAFTS ROCKER ARMS ASSOCIATED HARDWARE AUXILIARY GENERATOR AND TURBO.; EXPECTED OUTCOMES: KEEPS TRACK AND COMMUTER LOCOMOTIVE FLEET IN STATE OF GOOD REPAIR FOR CONTINUED RAIL OPERATION.; INTENDED BENEFICIARIES: ALASKA RAILROAD CORPORATION AND THE RIDERS THAT RELY ON ITS SERVICE.; SUBRECIPIENT ACTIVITIES: N/A | $22.29M |
| AK-2026-027↗ | Department of Transportation | ALASKA RAILROAD CORPORATION | FORMULA GRANT (A) | 2026-09-21 | 2026-09-21 | 1 | APPLICATION PURPOSE: TO FUND PREVENTIVE MAINTENANCE KEEPING ASSETS IN A STATE OF GOOD REPAIR RAIL-BELT WIDE.; ACTIVITIES PERFORMED: VEHICLE PREVENTIVE MAINTENANCE INCLUDES SERVICING AND FUELING (NOT FUEL COSTS) VEHICLES INSPECTION MAINTENANCE AND REPAIR OF VEHICLES AND ADMINISTRATIVE SUPPORT.PLANNING INSPECTION AND ADMINISTRATION FOR FUTURE NON-VEHICLE PREVENTIVE MAINTENANCE.; EXPECTED OUTCOMES: PRESERVE OR EXTEND THE FUNCTIONALITY AND SERVICEABILITY OF REVENUE AND NON-REVENUE VEHICLE ASSETS THAT SUPPORT PUBLIC TRANSPORTATION.; INTENDED BENEFICIARIES: ALASKA RAILROAD CORPORATION EMPLOYEES AND THE PUBLIC IT SERVES.; SUBRECIPIENT ACTIVITIES: N/A | $18.42M |
| 69A36526220070INFAK↗ | Department of Transportation | ALASKA RAILROAD CORPORATION | GRANT | 2026-09-11 | 2026-09-11 | 1 | THE PROJECT FUNDS PRELIMINARY ENGINEERING, NEPA, FINAL DESIGN, AND CONSTRUCTION THAT WILL REPLACE AN AGING RAILROAD BRIDGE ON ARRCS MAIN LINE AT MP G3.3 OVER THE CHENA RIVER AT FORT WAINWRIGHT IN FAIRBANKS, AK. THE NEW BRIDGE WILL ACCOMMODATE INDUSTRY-STANDARD 286,000-POUND FREIGHT CARS (FULLY LOADED), WHICH IS A STANDARD ARRC STRIVES TO ACHIEVE ON ALL CAPITAL IMPROVEMENTS INVOLVING BRIDGE SUPERSTRUCTURES ALONG THE RAILROAD. THE NEW BRIDGE WILL BE LONGER, MORE STABLE, AND DESIGNED TO MEET CURRENT AND PROJECTED FREIGHT AND PASSENGER TRAIN SPECIFICATIONS. | $17.15M |
| AK-2025-014↗ | Department of Transportation | ALASKA RAILROAD CORPORATION | FORMULA GRANT (A) | 2026-01-29 | 2026-01-29 | 1 | APPLICATION PURPOSE: TO FUND PHASES 1-3 (ALL PHASES) OF CONSTRUCTION FOR BRIDGE REPLACEMENT AT MP 127.5 DUE TO AGING.; ACTIVITIES PERFORMED: CONTINUED PHASE 1 ACTIVITIES INCLUDING PROCUREMENT OF STEEL AND CONCRETE AND ACCESS ROAD CREATION. PHASE 2 3 ACTIVITIES INCLUDE PIERS FOOTING MICROPILE ABUTMENT AND JUMP SPAN CREATION ALONG WITH TRACK REALIGNMENT.; EXPECTED OUTCOMES: KEEPING BRIDGES IN STATE OF GOOD REPAIR FOR CONTINUED RAIL OPERATION.; INTENDED BENEFICIARIES: ALASKA RAILROAD CORPORATION AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM CONTINUED SERVICES.; SUBRECIPIENT ACTIVITIES: N/A | $15.56M |
| 69A36526420910FSPAK↗ | Department of Transportation | ALASKA RAILROAD CORPORATION | PROJECT GRANT (B) | 2025-12-23 | 2025-12-23 | 1 | THE PROJECT FUNDS PRELIMINARY ENGINEERING, NEPA, FINAL DESIGN, AND CONSTRUCTION THAT WILL REPLACE AN AGING RAILROAD BRIDGE ON ARRC?S MAIN LINE AT MP 190.5 NEAR WILLOW, AK. THE NEW BRIDGE WILL ACCOMMODATE INDUSTRY-STANDARD 286,000-POUND FREIGHT CARS (FULLY LOADED), WHICH IS A STANDARD ARRC STRIVES TO ACHIEVE ON ALL CAPITAL IMPROVEMENTS INVOLVING BRIDGE SUPERSTRUCTURES ALONG THE RAILROAD. THE NEW BRIDGE WILL BE LONGER, MORE STABLE, AND DESIGNED TO MEET CURRENT AND PROJECTED FREIGHT AND PASSENGER TRAIN SPECIFICATIONS. | $8.20M |
| AK-2026-003↗ | Department of Transportation | ALASKA RAILROAD CORPORATION | FORMULA GRANT (A) | 2026-01-05 | 2026-01-05 | 1 | APPLICATION PURPOSE: TO FUND TRACK REHABILITATION AND PRELIMINARY ENGINEERING AND DESIGN FOR SIGNAL LED LIGHT UPGRADES.; ACTIVITIES PERFORMED: ACTIVITIES TO BE PERFORMED ARE TRACK REHABILITATION AND PRELIMINARY ENGINEERING AND DESIGN FOR SIGNAL LED LIGHT UPGRADES.; EXPECTED OUTCOMES: KEEPING ARRC MAINLINE TRACK AND SIGNAL SYSTEMS IN STATE OF GOOD REPAIR FOR CONTINUED RAIL OPERATION.; INTENDED BENEFICIARIES: ALASKA RAILROAD CORPORATION AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM CONTINUED SERVICES.; SUBRECIPIENT ACTIVITIES: N/A | $3.62M |
| AK-2026-011↗ | Department of Transportation | ALASKA RAILROAD CORPORATION | FORMULA GRANT (A) | 2026-03-26 | 2026-03-26 | 1 | APPLICATION PURPOSE: TO FUND A CYBERSECURITY UPDATE TO MEET FEDERAL REQUIREMENTS AND NEW COMPUTERS/PRINTERS THAT HAVE REACHED THEIR END OF LIFE FOR EMPLOYEES.; ACTIVITIES PERFORMED: IMPLEMENT CYBERSECURITY UPDATE PLAN ELEMENTS AND ACQUIRE NEW COMPUTER/PRINTER EQUIPMENT.; EXPECTED OUTCOMES: ENSURE ALL CYBER SYSTEMS ARE SECURE AND CONTINUE OPERATIONS WITH NEW PC/PRINTER EQUIPMENT THAT HAS REACHED ITS END OF LIFE.; INTENDED BENEFICIARIES: ALASKA RAILROAD CORPORATION AND THE RIDERS THAT RELY ON ITS SERVICE.; SUBRECIPIENT ACTIVITIES: N/A | $1.40M |
| AK-2026-018↗ | Department of Transportation | ALASKA RAILROAD CORPORATION | FORMULA GRANT (A) | 2026-05-27 | 2026-05-27 | 1 | APPLICATION PURPOSE: TO FUND BRIDGE PRELIMINARY ENGINEERING AND DESIGN AND PASSENGER OPERATIONS OFFICE RENOVATION.; ACTIVITIES PERFORMED: BRIDGE PRELIMINARY ENGINEERING AND DESIGN ACTIVITIES. RENOVATION INCLUDES NEW FLOORING PAINT AND LIGHTING OF OFFICE SPACE FOR THE PASSENGER OPERATIONS ADMINISTRATIVE AREA IN THE ANCHORAGE DEPOT.; EXPECTED OUTCOMES: KEEPING ARRC BRIDGES AND PASSENGER OPERATIONS ADMINISTRATIVE OFFICE SPACE IN STATE OF GOOD REPAIR FOR CONTINUED RAIL OPERATION.; INTENDED BENEFICIARIES: ALASKA RAILROAD CORPORATION AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM CONTINUED SERVICES.; SUBRECIPIENT ACTIVITIES: N/A | $1.02M |