| 47PC5526F0580↗ | General Services Administration | DCM ARCHITECTURE & ENGINEERING, LLC | DELIVERY ORDER | 2026-08-12 | 2026-08-25 | 2 | UPDATE OF POP TO ALIGN WITH THE NTP | $3.56M |
| 6923G226P000190↗ | Department of Transportation | DCM ARCHITECTURE & ENGINEERING, LLC | PURCHASE ORDER | 2026-09-29 | 2026-09-29 | 1 | RENOVATION OF PATTEN HALL, UNITED STATES MERCHANT MARINE ACADEMY, KINGS POINT, NEW YORK. RENOVATIONS INCLUDE THE FOLLOWING AREAS: 1ST FLOOR DENTAL AREA, 1ST FLOOR HALLWAY AREA AND OFFICES, 1ST FLOOR AMBULANCE BAY AND SQUAD ROOM, DEMOLISH AND REPLACE | $2.41M |
| 1232SA26C0007↗ | Department of Agriculture | DCM ARCHITECTURE & ENGINEERING, LLC | DEFINITIVE CONTRACT | 2026-05-22 | 2026-05-22 | 1 | REPLACE TWO AIR HANDLING UNITS AT THE NATIONAL AGRICULTURAL LIBRARY | $2.28M |
| 47PC5526F0169↗ | General Services Administration | DCM ARCHITECTURE & ENGINEERING, LLC | DELIVERY ORDER | 2026-02-25 | 2026-08-06 | 4 | THIS MODIFICATION PS0003 IS BEING ISSUED TO ADDRESS THE UNFORESEEN DISCOVERY OF A SANITARY PLUMBING LINE INSTALLED BY AN UNRELATED PROJECT WITHIN THE CEILING OF THE TIGTA 10TH-FLOOR PROJECT SPACE. | $1.30M |
| 47PC0226F0001↗ | General Services Administration | DCM ARCHITECTURE & ENGINEERING, LLC | DELIVERY ORDER | 2026-01-08 | 2026-01-08 | 1 | CONSTRUCTION DESIGN-BUILD SERVICES TO REMOVE AND REPLACE EXISTING 2000 AMP BUS-DUCT, 1600 AMP BUS-DUCT AND EXISTING TEMPORARY FEEDERS. | $784.8K |
| 140D0426F1229↗ | Department of the Interior | DCM ARCHITECTURE & ENGINEERING, LLC | DELIVERY ORDER | 2026-09-22 | 2026-09-22 | 1 | DESIGN-BUILD & DESIGN-BID-BUILD CONSTRUCTION SERVICES - ARMY DEVCOM - B21 HVAC AND DRAINAGE SYSTEM SEED PROJECT | $370.5K |
| 47PC5126F0423↗ | General Services Administration | DCM ARCHITECTURE & ENGINEERING, LLC | DELIVERY ORDER | 2026-08-13 | 2026-08-13 | 1 | ICE SURGE ERO RODINO 2ND EGRESS IN NEWARK, NJ | $152.4K |
| 693JF725C000021↗ | Department of Transportation | DCM ARCHITECTURE & ENGINEERING, LLC | DEFINITIVE CONTRACT | 2026-03-17 | 2026-09-02 | 3 | ARCHITECT-ENGINEER DESIGN SERVICES FOR THE FULL MISSION BRIDGE SIMULATOR ROOM IN SAMUELS HALL, UNITED STATES MERCHANT MARINE ACADEMY, TO INCLUDE TESTING, SURVEYING, MONITORING, OBSERVATION AND VERIFY COMPLIANCE OF THE GENERAL CONTRACTOR'S WORK. | $147.5K |