| D26AP00035↗ | Department of the Interior | GUAM POWER AUTHORITY | PROJECT GRANT (B) | 2025-11-07 | 2025-11-07 | 1 | AWARD PURPOSE:
THE GUAM POWER AUTHORITY (GPA) IS SEEKING FEDERAL FUNDING TO PURCHASE AND INSTALL A MODULAR
MICROGRID CONTROLLER THAT WILL IMPROVE GRID CONTROL, EMERGENCY RESPONSE, AND POWER RESTORATION
CAPABILITIES ON GUAM. THIS PROJECT AIMS TO INCREASE ENERGY RESILIENCE AND RELIABILITY FOR CRITICAL
PUBLIC INFRASTRUCTURE IN THE FACE OF SEVERE WEATHER AND OTHER DISRUPTIONS.
ACTIVITIES TO BE PERFORMED:
GPA WILL PROCURE A MODULAR MICROGRID CONTROLLER AND INTEGRATE IT INTO AN EXISTING DISTRIBUTION
CIRCUIT THAT SERVES ESSENTIAL SERVICES SUCH AS HEALTHCARE, WATER, AND EMERGENCY OPERATIONS. THE
CONTROLLER WILL BE CONNECTED TO GPA'S EXISTING SYSTEMS AND CONFIGURED TO ALLOW FOR REAL-TIME
MONITORING, LOAD MANAGEMENT, AND ISLANDING OF THE SELECTED CIRCUIT DURING GRID DISTURBANCES.
STAFF WILL BE TRAINED IN ITS OPERATION, AND THE SYSTEM WILL BE TESTED FOR PERFORMANCE UNDER
SIMULATED AND LIVE CONDITIONS.
EXPECTED DELIVERABLES OR OUTCOMES:
- ONE MODULAR MICROGRID CONTROLLER FULLY INSTALLED AND OPERATIONAL
- ENHANCED REAL-TIME VISIBILITY AND CONTROL OVER THE SELECTED CIRCUIT
- THE ABILITY TO ISOLATE AND MAINTAIN POWER TO CRITICAL FACILITIES DURING OUTAGES
- FASTER AND MORE TARGETED POWER RESTORATION FOLLOWING EMERGENCIES
- A SCALABLE SOLUTION FOR POTENTIAL FUTURE MICROGRID DEPLOYMENTS
INTENDED BENEFICIARIES:
THE PRIMARY BENEFICIARIES ARE GUAM RESIDENTS AND GOVERNMENT AGENCIES THAT DEPEND ON
UNINTERRUPTED POWER FOR ESSENTIAL SERVICES. THE PROJECT WILL IMPROVE RELIABILITY FOR FACILITIES SUCH
AS HOSPITALS, WATER SYSTEMS, EMERGENCY RESPONSE CENTERS, AND SHELTERS. LONG-TERM, THE ENTIRE
ISLAND BENEFITS FROM IMPROVED GRID RESILIENCE.
SUBRECIPIENT ACTIVITIES:
NO SUBRECIPIENTS ARE PLANNED AT THIS TIME. ALL PROJECT ACTIVITIES WILL BE MANAGED DIRECTLY BY GPA. | $1.00M |
| D26AP00036↗ | Department of the Interior | GUAM POWER AUTHORITY | PROJECT GRANT (B) | 2025-11-07 | 2025-11-07 | 1 | ADVANCED RESILIENCE MANAGEMENT FOR OUTAGE RECOVERY (ARMOR) PROJECT DEPLOYMENT OF A MICROGRIDCONTROLLER TO ENHANCE GRID RESILIENCE IN GUAM - UPI ES | $620.0K |
| 98T80301↗ | Environmental Protection Agency | GUAM POWER AUTHORITY | GRANT | 2026-07-16 | 2026-07-16 | 1 | DESCRIPTION:THE WORK TO BE ACCOMPLISHED INCLUDES REPLACING 1 DIESEL UTILITY AERIAL LIFT TRUCK WITH A UTILITY HYBRID ELECTRIC AERIAL LIFT TRUCK. SPECIFICALLY THE PROJECT WILL SUPPORT REDUCTION OF EMISSIONS OF NOX, PM2.5, CO, HC, CO2.
ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE INTERCONNECTION DESIGN AND INSTALLATION OF A PLUG-IN ELECTRIC VEHICLE (PEV) LEVEL II OR LEVEL III CHARGER AT AN APPROPRIATE PARKING SITE .THE NEW HYBRID BUCKET TRUCK WILL BE THE SOLE PROPERTY OF THE GUAM POWER AUTHORITY (GPA) AND WILL ONLY BE USED FOR POWER PRODUCTION OR UTILITY MAINTENANCE PURPOSES. THE NEW TRUCK MODEL WILL BE A 35-FOOT RANGE REACH. GPA WILL BE THE PRIMARY OWNER FOR THIS VEHICLE AND HAS THE RESPONSIBILITY TO MAINTAIN THIS VEHICLE.
SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE PURCHASE OF A NEW HYBRID BUCKET TRUCK TO BE USED FOR POWER PRODUCTION OR UTILITY MAINTENANCE PURPOSES. THE EXPECTED OUTCOMES INCLUDE ESTIMATED EMISSION REDUCTIONS (SHORT TONS) AS FOLLOWS: ANNUALLY: 2.15 NOX, 0.15 PM2.5, 1.2 CO, 0.15 HC, 53.4 CO2. LIFETIME: 4.3 NOX, 0.3 PM2.5, 2.4 CO, 0.31 HC, 107 CO2. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF GUAM (RESIDENTS OF THE ISLAND). | $0 |
| D18AP00208↗ | Department of the Interior | GUAM POWER AUTHORITY | PROJECT GRANT (B) | 2025-12-12 | 2025-12-12 | 1 | THIS PROJECT IS FOR THE RETROFIT OF OLD, INEFFICIENT LIGHTING AT SOUTHERN HIGH SCHOOL, IN GUAM, AND REPLACEMENT WITH NEWER, EFFICIENT LED LIGHTING. | $0 |
| D19AP00169↗ | Department of the Interior | GUAM POWER AUTHORITY | PROJECT GRANT (B) | 2026-01-14 | 2026-01-14 | 1 | THIS PROJECT IS FOR THE IMPLEMENTATION OF A LED LIGHTING RETROFIT AT MARIA ULLOA ELEMENTARY SCHOOL IN THE VILLAGE OF DEDEDO, GUAM, WHICH HOSTS OVER 700 STUDENTS AND 70 STAFF, AND IS ONE OF THE TOP-FIVE GUAM PUBIC SCHOOLS IN TERMS OF POWER USAGE. THE CONVERSION OF CONVENTIONAL LIGHTING TO LED WILL CREATE SIGNIFICANT ENERGY CONSUMPTION SAVINGS WHILE MODERNIZING THE SCHOOL'S INFRASTRUCTURE. | $0 |
| D22AP00319↗ | Department of the Interior | GUAM POWER AUTHORITY | GRANT | 2026-06-30 | 2026-06-30 | 1 | FISCAL YEAR 2022 ENERGIZING INSULAR COMMUNITIES, EIC, PROJECT: GUAM POWER AUTHORITY. BEST SCHOOLS PROGRAM - ORDOT CHALAN PAGO ELEMENTARY SCHOOL LED LIGHTING UPGRADES AND SOLAR PHOTOVOLTAIC PV RENEWABLE ENERGY GENERATION: ENERGY CONSERVATION PROJECT. BEST SCHOOLS PROGRAM - ORDOT CHALAN PAGO ELEMENTARY ENERGY CONSERVATION PROJECT FOR AN LED LIGHTING RETROFIT AND SOLAR PV AT ORDOT CHALAN PAGO ELEMENTARY SCHOOL. $700,841. GUAM-EIC-2022-4. | $0 |
| D22AP00281↗ | Department of the Interior | GUAM POWER AUTHORITY | GRANT | 2026-07-08 | 2026-07-10 | 2 | WITH THIS GRANT PROPOSAL, GPA IS SEEKING FUNDING FOR PERSONNEL COSTS FOR AN ADDITIONAL 24 MONTHS AFTER THE INITIAL GRANT FUNDS HAVE BEEN EXHAUSTED. THIS WILL ALLOW FOR CONTINUED BTS-RELATED DATA AND SPECIMEN COLLECTION TO BE SHARED WITH USGS. THIS EMPLOYEE ALSO SERVES AS THE LIAISON BETWEEN USGS AND GPA.NEW TO THIS PROPOSAL IS THE PURCHASE OF 10 MOTION SENSOR GAME CAMERAS. GPA HAS IDENTIFIED 10 AREAS THAT HAVE HAD MULTIPLE BROWN TREE SNAKE OUTAGES. A CAMERA WILL BE PLACED AT EACH OF THE AREAS WITH THE INTENT OF CAPTURING SPECIFIC AND UNIQUE ELEMENTS OF THESE LOCATIONS OR BTS BEHAVIOR THAT WE HAVE NOT YET BEEN IDENTIFIED.THE USE OF TECHNOLOGY HAS THE ABILITY TO PROVIDE GPA AND USGS SIGNIFICANT INSIGHT ON HOW THE BTS CLIMBS POWER POLES OR INFILTRATES SUBSTATIONS. ONE RECENT POWER OUTAGE CAUSED BY A BTS OCCURRED AT THE HARMON SUBSTATION, WHICH HAD USDA SNAKE TRAPS SET UP ON THE PERIMETER FENCE AND ADDITIONAL SNAKE BARRIERS INSTALLED THROUGHOUT THE SUBSTATION, YET A BTS WAS ABLE TO MANEUVER AROUND THESE PREVENTION MECHANISMS AND CAUSE A POWER OUTAGE.USGS AGREES TO CONTINUE TO REVIEW AND ANALYZE THE DATA PROVIDED BY GPA AND PROVIDE INSIGHTS, SHARE FINDINGS, AND PROPOSE PROJECTS WITH POTENTIAL TO MAKE THE POWER INFRASTRUCTURE MORE RESISTANT TO SNAKE ACCESS. USGS PROPOSES TO EXPLORE THE DATA PROVIDED BY GPA BY RUNNING A MODEL SELECTION ANALYSIS TO IDENTIFY THE FACTORS MOST FREQUENTLY ASSOCIATED WITH OUTAGES. THIS APPROACH WILL ENABLE USGS TO IDENTIFY BROAD SPATIOTEMPORAL PATTERNS AND POTENTIALLY SPECIFIC VULNERABILITIES.THIS INFORMATION CAN THEN BE USED BY GPA TO ALLOCATE RESOURCES TO MINIMIZE NEGATIVE EFFECTS FROM BTS WHERE THEIR IMPACT WILL BE GREATEST. BUILDING ON THESE FINDINGS, USGS CAN ALSO USE THIS INFORMATION TO DESIGN EXPERIMENTS TO BETTER UNDERSTAND HOW BTS ACCESS SENSITIVE UTILITY AREAS AND IDENTIFY REASONS OR CAUSES THAT ATTRACT THE BTS TO THESE PARTICULAR AREAS. | -$9 |
| D21AP10128↗ | Department of the Interior | GUAM POWER AUTHORITY | GRANT | 2026-04-21 | 2026-04-27 | 2 | ENERGY ENGINEERING TRAINING AND CERTIFICATION PROGRAM - FUNDING FOR PERMANENT STAFF TO BE CERTIFIED ENERGY MANAGER, ENERGY AUDITOR, MEASUREMENT VERIFICATION PROFESSIONAL, AND DEMAND SIDE MANAGER | -$1.6K |