| 6973GH24F00308↗ | Department of Transportation | SENTINEL POWER SERVICES, LLC | DELIVERY ORDER | 2025-12-23 | 2025-12-23 | 1 | SITE-SPECIFIC REQUIREMENTS, INCLUDING REMOVAL OF 1,000-GALLON UST, UNDERGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, AND (4) BOLLARDS; AND INSTALLATION OF 1,000-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO T | $424.0K |
| 6973GH24F00674↗ | Department of Transportation | SENTINEL POWER SERVICES, LLC | DELIVERY ORDER | 2026-01-06 | 2026-01-06 | 1 | IIJA FUND. FST FUNDED. SITE-SPECIFIC REQUIREMENTS, INCLUDING REMOVAL OF 1,000-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, (5) BOLLARD AND CONCRETE FST PAD; AND INSTALLATION OF 1,500-GALLON AST, ABOVEG | $386.0K |
| 6973GH24F00689↗ | Department of Transportation | SENTINEL POWER SERVICES, LLC | DELIVERY ORDER | 2026-08-13 | 2026-08-13 | 1 | DE-OBLIGATE THE FST FUNDS, AND ADD THE SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 15KW EG AND FST AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 15KW EG 120/240V, 1PH IAW THE APPROVED DRAWINGS DATED 2/24/2025 AND THE 2023 125KW EG INDOOR BASELINE, | $362.7K |
| 6973GH24F00692↗ | Department of Transportation | SENTINEL POWER SERVICES, LLC | DELIVERY ORDER | 2026-08-13 | 2026-08-24 | 2 | IIJA FUNDS. SITE-SPECIFIC REQUIREMENTS, INCLUDES THE REMOVAL OF THE EXISTING 50KW INDOOR EG AND FST SYSTEM AND INSTALLATION OF A NEW INDOOR 50KW EG AND NEW SUBBASE TANK SYSTEM AND ERMS AT MAJURO DELAP, MH (MAJ) PAPI JCN: 24011129 | $329.5K |
| 6973GH22F01728↗ | Department of Transportation | SENTINEL POWER SERVICES, LLC | DELIVERY ORDER | 2026-06-16 | 2026-06-16 | 1 | IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 175KW EG AT THE AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 200KW EG 277/480V, 3PH IAW THE APPROVED DRAWINGS DATED 9/12/2025 AND THE 2023 125KW EG OUTDOOR BASELINE, ERMS, A FULL POWER SYST | $312.9K |
| 6973GH23F00725↗ | Department of Transportation | SENTINEL POWER SERVICES, LLC | DELIVERY ORDER | 2026-03-11 | 2026-03-11 | 1 | IIJA FUNDS. FST SITE-SPECIFIC INCLUDES THE REMOVAL OF THE EXISTING 2,000-GAL AST, ABOVEGROUND FUEL OIL SUPPLY AND RETURN PIPING, INTERIOR 200KW ENGINE GENERATOR, VEEDER ROOT, AND CONCRETE PAD; AND INSTALLATION OF A NEW 200KW EG SUB-BASED DIESEL TANK, | $307.1K |
| 6973GH24F00893↗ | Department of Transportation | SENTINEL POWER SERVICES, LLC | DELIVERY ORDER | 2026-05-12 | 2026-09-15 | 5 | EG FUNDED, CHANGE ORDER FOR THE DISPENSER RELOCATION AT MIDDLETON IS, AK (MDO) PX JCN: 18027172 | $241.4K |
| 6973GH23F00726↗ | Department of Transportation | SENTINEL POWER SERVICES, LLC | DELIVERY ORDER | 2026-05-06 | 2026-05-06 | 1 | IIJA FUNDS. SITE-SPECIFIC REQUIREMENTS INCLUDES THE REMOVAL OF 2,000-GALLON AST, UNDERGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, AND CONCRETE FST PAD; AND INSTALLATION OF 2,000-GALLON AST, ABOVEGROUND SUPPLY AND RETU | $211.8K |