| 693JJ22630000Y001MT0905101↗ | Department of Transportation | MONTANA DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-08-04 | 2026-08-04 | 1 | PROJECT TITLE: WHITEHALL - EAST (CN & CE) INTERSTATE 90, JEFFERSON COUNTY, RESURFACE THE ROADWAY FROM REFERENCE POINT 249.0 TO 253.3 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR RESURFACING THE EXISTING ROADWAY INCLUDES REMOVAL AND REPLACEMENT OF TWO LARGE STEEL PLATE ARCH CULVERTS AT THE WHITETAIL CREEK CROSSING, A SEAL AND COVER, GUARDRAIL UPGRADES, RUMBLE STRIPS, PAVEMENT MARKINGS, SIGNING, AND DELINEATION. THIS PROJECT IS LOCATED IN JEFFERSON COUNTY ON NATIONAL HIGHWAY INTERSTATE ROUTE 90 FROM REFERENCE POINT 249.0 TO 253.3. | $28.94M |
| 693JJ22630000Y236MT0056093↗ | Department of Transportation | MONTANA DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-06-29 | 2026-07-01 | 2 | PROJECT TITLE: BBP-JOHNSON LANE INTERCHANGE (CN & CE) MULTIPLE ROUTES, YELLOWSTONE COUNTY, RECONSTRUCTION OF AN URBAN INTERCHANGE AT VARIOUS LOCATIONS :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE RECONSTRUCTION OF AN EXISTING URBAN INTERCHANGE WITH PRESTRESSED CONCRETE BRIDGE STRUCTURES TO INCLUDE GRADING, GRAVEL, STORM WATER COLLECTION, PLANT MIX BITUMINOUS SURFACING, P.C.C.P. CONCRETE PAVEMENT, STRUCTURAL CONCRETE, CONCRETE BRIDGE DECKING, LIGHTING, SIGNING, PAVEMENT MARKINGS, TRAFFIC SIGNALS, AND OTHER IMPROVEMENTS FOR A SEGMENT OF THE BILLINGS BYPASS AT THE JOHNSON LANE INTERCHANGE. THE PROJECT IS LOCATED IN YELLOWSTONE COUNTY WITHIN BILLINGS URBAN LIMITS ON MULTIPLE ROUTES/ADJACENT ROADWAYS. | $26.16M |
| 693JH6GRANT4RA26I4344050057602↗ | Department of Transportation | MONTANA DEPARTMENT OF TRANSPORTATION | PROJECT GRANT (B) | 2026-08-12 | 2026-08-12 | 1 | PROJECT TITLE: BROCKWAY - WEST (CN & CE) NATIONAL HIGHWAY 57, MCCONE COUNTY, RECONSTRUCTION OF THE ROADWAY FROM REFERENCE POINT 260.1 TO 267.1 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE RECONSTRUCTION OF THE EXISTING ROADWAY AND THE NECESSARY STRUCTURE WORK INCLUDES 6 FT SHOULDERS, CENTERLINE AND SHOULDER RUMBLE STRIPS, NEW DRAINAGE STRUCTURES, SIGNING AND PAVEMENT MARKINGS. THIS PROJECT IS LOCATED IN MCCONE COUNTY ON NATIONAL HIGHWAY ROUTE 57/MT-200 FROM REFERENCE POINT 260.1 TO 267.1. | $25.00M |
| 693JJ22640003YP04MT1212008RURL↗ | Department of Transportation | MONTANA DEPARTMENT OF TRANSPORTATION | PROJECT GRANT (B) | 2026-01-21 | 2026-01-21 | 1 | PROJECT TITLE: KAGY BLVD-S 19TH TO WILLSON (PE, CN, CE, IC, RW) URBAN ROUTE 1212, GALLATIN COUNTY, RECONSTRUCT AND WIDEN ROADWAY FROM REFERENCE POINT 0.0 TO 1.2 :::: PROJECT DESCRIPTION: PRELIMINARY ENGINEERING, CONSTRUCTION, CONSTRUCTION ENGINEERING, INCIDENTAL CONSTRUCTION, AND RIGHT-OF-WAY ACTIVITIES REQUIRED FOR WIDENING OF THE EXISTING ROADWAY. THIS PROJECT WILL RECONSTRUCT KAGY BOULEVARD FROM S. 19TH AVENUE TO S. WILSON AVENUE, TO INCLUDE TWO MEDIAN-SEPARATED TRAVEL LANES IN EACH DIRECTION, TURNING LANES, A SEPARATED 10-FT-WIDE SHARED USE PATH, LANDSCAPING AND STREET LIGHTING, ROUNDABOUTS, PEDESTRIAN GRADE SEPARATED CROSSINGS, AND SIGNAL MODIFICATIONS. THIS PROJECT IS LOCATED IN GALLATIN COUNTY WITHIN THE BOZEMAN URBAN LIMITS FROM REFERENCE POINT 0.0 TO 1.2. | $24.29M |
| 693JJ22630000Y238MT2031016↗ | Department of Transportation | MONTANA DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-08-25 | 2026-08-25 | 1 | PROJECT TITLE: NORTH OF STEVENSVILLE-NORTH (CN & CE) SECONDARY ROUTE 203, RAVALLI COUNTY, RECONSTRUCT THE ROADWAY FROM REFERENCE POINT 4.0 TO 10.2 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE RECONSTRUCTION OF ROADWAY TO INCLUDE GRADING, GRAVEL, PLANT MIX SURFACING, CURB & GUTTER, PCCP, DRAINAGE, IRRIGATION, GUARDRAIL, CENTERLINE AND SHOULDER RUMBLE STRIPS, FENCING, SIGNING, DELINEATION, LIGHTING, STRIPING, ROADWAY WIDENED FOR WIDER SHOULDERS, A CENTER TWO-WAY LEFT TURN LANE, MAILBOX TURNOUTS, AND A 4-LEGGED ROUNDABOUT. THIS PROJECT IS LOCATED IN RAVALLI COUNTY ON STATE SECONDARY ROUTE 203 FROM REFERENCE POINT 4.0 TO 10.2. | $22.70M |
| 693JJ22630000Y001MT0576022↗ | Department of Transportation | MONTANA DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-01-06 | 2026-01-06 | 1 | PROJECT TITLE: WEST OF BROCKWAY - WEST (CN & CE) NATIONAL HIGHWAY 57, MCCONE COUNTY, RECONSTRUCTION OF THE ROADWAY FROM REFERENCE POINT 253.4 TO 260.2 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE RECONSTRUCTION OF THE EXISTING ROADWAY AND THE NECESSARY STRUCTURE WORK INCLUDING MASTIC CRACK FILLING AND CRACK SEALING, PAVING FABRIC, PLANT MIX OVERLAY, SEAL & COVER, FOG SEAL, TAPER COLD MILLING AND PLANT MIX OVERLAY ON PROJECT CONNECTIONS, PULLOUTS, TURNOUTS, AND APPROACHES, NEW PAVEMENT MARKINGS, SIGNING, DELINEATION, WILDLIFE SIGNING UPGRADES, LOW NOISE CENTERLINE RUMBLE STRIPS, AND 3 EXISTING TIMBER BRIDGES (2 OF THE BRIDGES WILL BE REPLACED WITH CULVERTS, WHILE 1 WILL BE REPLACED WITH A NEW BRIDGE). THIS PROJECT IS LOCATED IN MCCONE COUNTY ON NATIONAL HIGHWAY ROUTE 57/MT-200 FROM REFERENCE POINT 253.4 TO 260.2. | $21.88M |
| 693JJ22440000RA12MT5691011↗ | Department of Transportation | MONTANA DEPARTMENT OF TRANSPORTATION | PROJECT GRANT (B) | 2026-05-19 | 2026-05-19 | 1 | PROJECT TITLE: MILL CREEK HIGHWAY (PE, RW, CN & CE) SECONDARY ROUTE 569, DEER LODGE COUNTY, RECONSTRUCTION OF ROADWAY FROM REFERENCE POINT 6.1 TO 11.0 :::: PROJECT DESCRIPTION: PRELIMINARY ENGINEERING, RIGHT-OF-WAY, AND CONSTRUCTION ACTIVITIES REQUIRED FOR RECONSTRUCTION OF THE ROADWAY INCLUDES 12' DRIVING LANES, 1' SHOULDERS, SIGNAGE, AND GUARDRAIL. THIS PROJECT IS LOCATED IN DEER LODGE COUNTY ON STATE SECONDARY ROUTE 569 FROM REFERENCE POINT 6.1 TO 11.0. | $17.45M |
| 693JJ22630000Y238MT0423021↗ | Department of Transportation | MONTANA DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-05-08 | 2026-07-22 | 2 | PROJECT TITLE: FORT PECK-NORTHWEST (CN & CE) PRIMARY ROUTE 42, VALLEY COUNTY, REHABILITATION OF THE EXISTING ROADWAY FROM REFERENCE POINT 59.6 TO 73.3 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE REHABILITATION OF THE EXISTING ROADWAY INCLUDES PAVEMENT PULVERIZATION, SHOULDER WIDENING, GUARDRAIL, PIPE REPLACEMENTS, UPGRADED SIGNING AND PAVEMENT MARKINGS. THIS PROJECT IS LOCATED IN VALLEY COUNTY ON STATE PRIMARY ROUTE 42 FROM REFERENCE POINT 59.6 TO 73.3. | $17.25M |