American Samoa Power Authority (UEI XKBFZJPMNLN5) received $43.77M in federal obligations in FY2026 so far (Defense contracts arrive about 90 days late) ($374.2K in contracts, $43.40M in grants and other assistance), the most from Environmental Protection Agency ($43.50M) and mostly under NAICS 221122 (Electric Power Distribution). It ranks #23,149 among federal contractors that year. Its largest award, 98T49726, was $30.71M from Environmental Protection Agency.

Key facts · data as of Nov 21, 2026

Federal obligations, FY2026 so far
$43.77M
Contracts
$374.2K
Grants and other assistance
$43.40M
Rank among federal contractors
#23,149
Largest customer
Environmental Protection Agency ($43.50M)
Main industry
NAICS 221122, Electric Power Distribution

Source: USAspending.gov prime awards (obligations: money committed, not outlays), data as of Nov 21, 2026.

Cite this page: SpendQuery, American Samoa Power Authority federal contracts and awards, data as of Nov 21, 2026, https://spendquery.com/company?key=XKBFZJPMNLN5

UEI XKBFZJPMNLN5 · CAGE 0N2R4 · registered in AS

Why these numbers?
  • Sources: USAspending.gov awards and subawards, SAM.gov registrations, state checkbooks; data as of 2026-11-14.
  • A company's totals add up every registration rolled up under it (subsidiaries and locations); corrected parents and ownership changes are listed under its registrations.
  • Subcontracts are what prime contractors report; they are not added to the company's prime awards.
  • Amounts are obligations (money committed) by federal fiscal year (October to September), not outlays (money paid).

How we check the numbers · All sources

Year:
FY2026 obligations
$43.77M
▲ 12.9% vs FY2025
all awards, every registration rolled up
Contractor rank
#23,126
of 87,291 by FY2026 contract obligations
Largest customer
$43.50MEnvironmental Protection Agency
99% of its FY2026 money

Its whole relationship with the federal government

Brief

In FY2026, American Samoa Power Authority received $43.77M in federal awards, up 13% from FY2025; it ranks #23,126 among 87,291 contractors. 99% of it came from the Environmental Protection Agency. Its largest line of contract work is electric power distribution. The most money goes to work done in American Samoa.

Written from the numbers on this page, not by AI.

What it does

Reading its website…

Federal money by year

Federal · obligations

all years

Obligations by fiscal year across all loaded years: from $7.89M (2023) to $43.77M (2026).

Obligations by fiscal year
Fiscal yearObligations
2023$7.89M
2024$30.90M
2025$38.78M
2026$43.77M
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • No year given: covers FY2023–FY2026.
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: XKBFZJPMNLN5 → AMERICAN SAMOA POWER AUTHORITY
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Who pays it, FY2026

Federal · obligations

FY2026

$43.77Mall federal money · largest: Environmental Protection Agency $43.50M (99%)

Top 3 by obligations in FY2026. Leading: Environmental Protection Agency ($43.50M); Department of Defense ($374.19K); Department of the Interior (-$100.00K).

Obligations by agency, FY2026 · click a bar to drill in
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: XKBFZJPMNLN5 → AMERICAN SAMOA POWER AUTHORITY
  1. Source USAspending.gov prime awards · about the data

Open as a question →

What kind of money, FY2026

Federal · obligations

FY2026

$43.77Mall federal money · largest: grants $43.40M (99%)

Top 2 by obligations in FY2026. Leading: grants ($43.40M); contracts ($374.19K).

Obligations by award type, FY2026 · click a bar to drill in
Award typeObligations
grants$43.40M
contracts$374.2K
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Loan amounts are the government's estimated subsidy cost (what the loan is expected to cost it), not the amount lent; ask for loan face value for the amount lent.
  • Award types follow USAspending: grants include cooperative agreements; direct payments include benefits such as Social Security and Medicare; other = insurance and other assistance.
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: XKBFZJPMNLN5 → AMERICAN SAMOA POWER AUTHORITY
  1. Source USAspending.gov prime awards · about the data

Open as a question →

What it's paid for (industries), FY2026

Federal · obligations

FY2026

Top 1 by obligations in FY2026. Leading: ELECTRIC POWER DISTRIBUTION ($374.19K).

NAICSIndustry (NAICS)Obligations
221122ELECTRIC POWER DISTRIBUTION$374.2K
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: XKBFZJPMNLN5 → AMERICAN SAMOA POWER AUTHORITY
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Where the work is, FY2026

Federal · obligations

FY2026

Top 1 by obligations in FY2026. Leading: American Samoa ($43.77M).

StateObligations
American Samoa$43.77M
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Location is where the work is performed, not where the recipient is based.
  • Medicare payments are published as aggregate records placed where Medicare's claims contractors are (mostly Minnesota, Indiana, Pennsylvania, Kentucky, North Dakota, Connecticut, Florida and South Carolina), not where patients live, so those states show far more HHS money than their population suggests (ask for Medicare payments by patients' home state for where beneficiaries live).
  • '(outside the US)' is work performed abroad; '(not reported)' has no location in the source.
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: XKBFZJPMNLN5 → AMERICAN SAMOA POWER AUTHORITY
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Largest awards, FY2026

Federal · obligations

FY2026

Found 8 award(s) in FY2026. The largest is 98T49726 (AMERICAN SAMOA POWER AUTHORITY, Environmental Protection Agency) with $30.71M.

Award idAgencyRecipientAward typeFirst actionLast actionActionsDescriptionObligations
98T49726↗Environmental Protection AgencyAMERICAN SAMOA POWER AUTHORITYFORMULA GRANT (A)2026-03-252026-03-251DESCRIPTION:THIS AGREEMENT INCLUDES FISCAL YEAR 2025 INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) AWARDS, WHICH INCLUDES DRINKING WATER STATE REVOLVING FUND GENERAL SUPPLEMENTAL, CLEAN WATER STATE REVOLVING FUND GENERAL SUPPLEMENTAL, CLEAN WATER EMERGING CONTAMINANT FUNDS, DRINKING WATER EMERGING CONTAMINANT FUNDS, AND LEAD SERVICE LINE REPLACEMENT FUNDS. THE PROJECT WORKPLAN IS TARGETED TO MEET THE STATUTORY AND REGULATORY OBJECTIVES, MILESTONES, AND GOALS OF EPA'S STRATEGIC PLAN, IN CONJUNCTION WITH THE AUTHORITY AND LEGISLATIVE INTENT OF THE OMNIBUS TERRITORIES ACT. PLANNED PROJECTS ARE DERIVED FROM THE AMERICAN SAMOA POWER AUTHORITY (ASPA) PROJECT PRIORITY LIST. THE SPECIFIC PROJECT PRIORITIES MAY CHANGE THROUGHOUT THE PERIOD OF PERFORMANCE, WHICH ARE DEPENDENT ON THE NEEDS BASIS OF PROTECTING HUMAN HEALTH AND THE ENVIRONMENT. THIS YEAR'S AWARD WILL FUND DESIGN AND CONSTRUCTION FOR TANK INSTALLATION AND REPLACEMENT, WATERLINE REPLACEMENT, SEWER LIFT STATION REHABILITATION/REPLACEMENT, SETTING UP SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) FOR THE DRINKING WATER SYSTEM, SEWER SYSTEM EXTENSION, AND WASTEWATER TREATMENT IMPROVEMENTS. THIS COOPERATIVE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $30,706,273, OF WHICH $800,000 IS SET ASIDE FOR EPA IN-KIND SUPPORT TO DEVELOP A WATER AND WASTEWATER ASSET MANAGEMENT SYSTEM. SEE TERMS AND CONDITIONS. ACTIVITIES:THIS AGREEMENT INCLUDES INFRASTRUCTURE INVESTMENT AND JOBS ACT FUNDS FOR FISCAL YEAR 2025. THE FULL DETAILED WORKPLAN IS ATTACHED AND DESCRIBES THE OBJECTIVES, MILESTONES, AND GOALS THAT MEET THE REQUIREMENTS OF EPA'S STRATEGIC PLAN, STATUTES, REGULATIONS, AND IS BEING DONE WITH THE AUTHORITY AND LEGISLATIVE INTENT OF THE OMNIBUS TERRITORIES ACT. THE PROPOSED PROJECTS ARE TAKEN FROM THE USEPA APPROVED ASEPA PROJECT PRIORITY LIST, HOWEVER, THE SPECIFIC PROJECT PRIORITIES MAY CHANGE THROUGH THE YEARS DEPENDENT ON THE NEED OF ADDRESSING PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT. THE PROPOSED PROJECTS WILL FOCUS ON TANK INSTALLATION AND IMPROVEMENTS, WATERLINE REPLACEMENT, WELL AND BOOSTER STATION UPGRADES, SETTING UP SCADA FOR THE SATELLITE WATER SYSTEMS, NEW WATER TREATMENT SYSTEMS, AND ASSET MANAGEMENT. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE WATER SYSTEM IMPROVEMENT PROJECTS' PRIMARY OBJECTIVES INCLUDE REPLACING OLD LEAKING WATER MAINS, UPGRADING UNDERSIZED MAINS, IMPROVING WATER TREATMENT AND THUS REDUCING PUBLIC HEALTH RISKS, REDUCING OPERATIONS AND MAINTENANCE COSTS, IMPROVING USEFUL LIFE OF ASSETS, AND MANAGING WATER SOURCES FOR FUTURE GENERATIONS. THESE PROJECTS ALSO AIM TO REDUCE NON-REVENUE WATER, PROVIDING METERED (BILLABLE), RELIABLE, POTABLE DRINKING WATER TO EVERY CUSTOMER RESIDING IN THE AMERICAN SAMOA.$30.71M
96975325↗Environmental Protection AgencyAMERICAN SAMOA POWER AUTHORITYFORMULA GRANT (A)2026-03-242026-03-241DESCRIPTION:THIS ASSISTANCE AGREEMENT INCLUDES FISCAL YEAR 2024 DRINKING WATER AND CLEAN WATER STATE REVOLVING FUNDS (DW AND CW SRF) GRANT FUNDS. THE PROPOSED PROJECTS ARE TAKEN FROM THE APPROVED PROJECT PRIORITY LIST. THE PROPOSED PROJECTS WILL FOCUS ON DRINKING WATER AND WASTEWATER SYSTEM IMPROVEMENTS TO INCLUDE REHABILITATION, REPLACEMENT, AND INSTALLATION OF NEW INFRASTRUCTURE. PREAWARD COSTS ARE APPROVED BACK TO OCTOBER 1, 2024. SEE TERMS AND CONDITIONS. ACTIVITIES:THIS ASSISTANCE AGREEMENT INCLUDES DW AND CW SRF FUNDS FOR FISCAL YEAR 2024. THE FULL DETAILED WORKPLAN IS ATTACHED AND DESCRIBES THE OBJECTIVES, MILESTONES, AND GOALS THAT MEET THE REQUIREMENTS OF EPA'S STRATEGIC PLAN, GPRA, STATUTES, REGULATIONS, AND IS BEING DONE WITH THE AUTHORITY AND LEGISLATIVE INTENT OF THE OMNIBUS TERRITORIES ACT. THE PROPOSED PROJECTS ARE TAKEN FROM THE USEPA APPROVED AMERICAN SAMOA POWER AUTHORITY (ASPA) PROJECT PRIORITY LIST, HOWEVER, THE SPECIFIC PROJECT PRIORITIES MAY CHANGE THROUGH THE YEARS DEPENDENT ON THE NEED OF ADDRESSING PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT. THE PROPOSED PROJECT WILL FOCUS ON THE VAITOGI WASTEWATER COLLECTION SYSTEM. THE PROPOSED ACTIVITIES AND BUDGET ARE DETAILED IN THE WORKPLAN, WHICH HAS BEEN NEGOTIATED AND APPROVED BY THE PROJECT OFFICER.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE PRIMARY OBJECTIVE INCLUDES PHASE II CONSTRUCTION OF THE VAITOGI COLLECTION SYSTEM. THIS PROJECT WILL PROVIDE FIRST TIME WASTEWATER SERVICE TO CUSTOMERS IN VAITOGI AND WILL ALSO REDUCE GROUNDWATER CONTAMINATION BY ELIMINATING CESSPOOLS AND SEPTIC TANKS, THUS PROTECTING AMERICAN SAMOA'S GROUNDWATER AND BEACHES.$11.76M
98T81101↗Environmental Protection AgencyAMERICAN SAMOA POWER AUTHORITYCOOPERATIVE AGREEMENT2026-08-282026-08-281DESCRIPTION:THE COOPERATIVE AGREEMENT PROVIDES FUNDING FROM THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA). EPA'S SOLID WASTE INFRASTRUCTURE FOR RECYCLING (SWIFR) GRANTS FOR STATES AND TERRITORIES WILL FUND ACTIVITIES THAT SUPPORT LONG-TERM PLANNING AND DATA COLLECTION NEEDS TO DEMONSTRATE PROGRESS TOWARD THE NATIONAL RECYCLING GOAL AND FOOD LOSS AND WASTE REDUCTION GOAL AND ADVANCE A CIRCULAR ECONOMY FOR MATERIALS, AS WELL AS SUPPORT THE STATE-LED IMPLEMENTATION OF PLANS TO ADVANCE POST-CONSUMER MATERIALS MANAGEMENT. THE PURPOSE OF THIS AWARD IS TO ENHANCE THE AMERICAN SAMOA POWER AUTHORITY'S (ASPA) EFFORTS TO MEET THE SWIFR GRANTS ELEMENTS. ASPA WILL PLAN FOR AND DEVELOP MEASUREMENT SYSTEMS AND SOLID WASTE INFRASTRUCTURE FOR RECYCLING - INCLUDING SIX TRANSFER STATIONS AND A LANDFILL RECYCLING FACILITY DEVELOPMENT TO IMPROVE RECYCLING CAPACITY FOR ALL OF THE ISLANDS OF AMERICAN SAMOA. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE: - SEMI-ANNUAL AND FINAL REPORTING - PROVIDE FEEDBACK TO EPA ON IMPROVING THE SOLID WASTE INFRASTRUCTURE FOR RECYCLING PROGRAM - DEVELOP EPA-APPROVED QUALITY ASSURANCE PROJECT PLAN - DEVELOP WASTE REDUCTION, CIRCULAR ECONOMY OR ZERO WASTE WORK PLAN AND COLLECTION STRATEGIES FOR PROCESSING WASTE STREAMS (TRANSFER STATIONS) PLAN - COLLECT, RECORD AND REPORT DATA - MANAGE CONSTRUCTION OF SIX TRANSFER STATIONS AND A LANDFILL FACILITY RETROFIT TO EXPAND RECYCLING COLLECTION AND PROCESSING CAPACITY. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE: - SEMI-ANNUAL AND FINAL REPORTS - QUALITY ASSURANCE PROJECT PLAN - WASTE REDUCTION, CIRCULAR ECONOMY, OR ZERO WASTE PLAN - COLLECTION STRATEGIES FOR PROCESSING WASTE STREAMS (TRANSFER STATIONS) PLAN. THE EXPECTED OUTCOMES INCLUDE: - DEVELOPING TWO PLANS TO REDUCE WASTE - IMPROVED SOLID WASTE DATA COLLECTION AND REPORTING - PLAN IMPLEMENTATION TO CONSTRUCT SIX TRANSFER STATIONS, RECYCLING EQUIPMENT AND LANDFILL RECYCLING CAPACITY. OUTPUT MEASURES RESULTING FROM THIS GRANT WILL INCLUDE: - TONS OF MSW/CANDD COLLECTED, RECYCLED, COMPOSTED, OR MANAGED VIA OTHER MANAGEMENT PATHWAYS - GREENHOUSE GAS EMISSIONS REDUCED (IN MTCO2E) FROM COLLECTION, RECYCLING, COMPOSTING, OR MANAGEMENT VIA OTHER MANAGEMENT PATHWAYS - NUMBER OF TEMPORARY OR PERMANENT JOBS CREATED. THE INTENDED BENEFICIARIES INCLUDE THE AMERICAN SAMOA POWER AUTHORITY AND THE AMERICAN SAMOA COMMUNITY, ECONOMY AND ENVIRONMENT.$630.3K
97T54001↗Environmental Protection AgencyAMERICAN SAMOA POWER AUTHORITYPROJECT GRANT (B)2026-03-272026-03-271DESCRIPTION:THE AGREEMENT PROVIDES FUNDING TO AMERICAN SAMOA POWER AUTHORITY TO REPLACE TWO OLDER CLASS 7 DIESEL TRUCKS TO LOWER EMISSIONS AND IMPROVE FUEL EFFICIENCY. SPECIFICALLY, THE RECIPIENT WILL PROCURE TWO NEW CLASS 7 DIESEL TRUCKS, SCRAP THE TWO OLDER TRUCKS IN ACCORDANCE WITH EPA REQUIREMENTS, AND DEPLOY THE REPLACEMENTS TO SUPPORT UTILITY OPERATIONS ACROSS TUTUILA AND MANU'A. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $400,000. SEE GENERAL TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES INCLUDE: CONDUCTING PROCUREMENT FOR TWO REPLACEMENT CLASS 7 DIESEL TRUCKS; EVALUATING PROPOSALS AND AWARDING CONTRACTS; RECEIVING AND PLACING THE NEW VEHICLES INTO SERVICE; SCRAPPING THE TWO OLDER TRUCKS AND DOCUMENTING SCRAPPAGE PER EPA REQUIREMENTS; AND PREPARING AND SUBMITTING REQUIRED PERFORMANCE REPORTS AND A FINAL REPORT TO EPA. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE PROCUREMENT AND CONTRACT DOCUMENTATION, DELIVERY RECEIPTS, SCRAPPAGE EVIDENCE (PHOTOS AND CERTIFICATES OF DESTRUCTION), PHOTOGRAPHS OF THE NEW TRUCKS AND VEHICLE IDENTIFICATION NUMBER (VIN) TAGS, TWO NEW CLASS 7 TRUCKS PLACED INTO SERVICE, AND PERFORMANCE AND FINAL REPORTS SUBMITTED TO EPA. THE EXPECTED OUTCOMES INCLUDE REPLACEMENT OF TWO OLDER CLASS 7 DIESEL TRUCKS WITH NEWER MODELS, LOWER EMISSIONS AND IMPROVED FUEL EFFICIENCY, COMPLIANCE WITH EPA SCRAPPAGE REQUIREMENTS, AND CONTINUED SUPPORT FOR UTILITY OPERATIONS ACROSS TUTUILA AND MANU'A. THE INTENDED BENEFICIARIES INCLUDE ASPA'S TRANSMISSION AND DISTRIBUTION AND WASTE WATER OPERATIONS ACROSS TUTUILA AND MANU'A, SERVICED BY THE ASPA FLEET DIVISION.$400.0K
W912CN26FA043↗Department of DefenseAMERICAN SAMOA POWER AUTHORITYDELIVERY ORDER2025-12-302025-12-301AM SAMOA UTILITIES (ELEC/WATER/SEWER/REFUSE DISPOSAL)$374.2K
96975321↗Environmental Protection AgencyAMERICAN SAMOA POWER AUTHORITYFORMULA GRANT (A)2025-10-102025-10-101DESCRIPTION:THIS ASSISTANCE AGREEMENT INCLUDES FISCAL YEAR 2021 DRINKING WATER AND CLEAN WATER STATE REVOLVING FUND (DW AND CW SRF) GRANT FUNDS. THE PROPOSED PROJECTS ARE TAKEN FROM THE APPROVED PROJECT PRIORITY LIST. THE PROPOSED PROJECTS WILL FOCUS ON DRINKING WATER AND WASTEWATER SYSTEM IMPROVEMENTS TO INCLUDE REHABILITATION, REPLACEMENT AND INSTALLATION OF NEW INFRASTRUCTURE. ACTIVITIES:.SUBRECIPIENT:OUTCOMES:.$0
96975323↗Environmental Protection AgencyAMERICAN SAMOA POWER AUTHORITYFORMULA GRANT (A)2025-10-102025-10-101DESCRIPTION:THIS AGREEMENT INCLUDES FISCAL YEAR 2022 SAFE DRINKING WATER AND CLEAN WATER STATE REVOLVING FUND (DW AND CW SRF) GRANT FUNDS. THE PROPOSED PROJECTS ARE TAKEN FROM THE APPROVED PROJECT PRIORITY LIST. THE PROPOSED PROJECTS WILL FOCUS ON DRINKING WATER AND WASTEWATER SYSTEM IMPROVEMENTS TO INCLUDE REHABILITATION, REPLACEMENT AND INSTALLATION OF NEW INFRASTRUCTURE. THE COOPERATIVE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $8,790,908. ACTIVITIES:ACTIVITIES TO BE PERFORMED - WATER PROJECT: CENTRAL WATER SYSTEM NEW WELL DRILLING AND CONNECTIONS ($2,640,000). WASTEWATER PROJECTS: 1.REDUCE AND CONTROL OIL AND GREASE DISCHARGE INTO WASTEWATER SYSTEM ($450,908) 2. UPGRADING ALL 19# LIFT STATIONS - CIVIL, ELECTRICAL AND MECHANICAL UPGRADING ($1,500,000) 3. INSTALLATION OF SCADA SYSTEM TO ALL LIFT STATIONS AND OPERATION ROOM ($1,000,000) 4.REPLACING GRAVITY MAIN IN WASTEWATER SYSTEM TO REDUCE AND CONTROL INFLOWS ($2,700,000) 5.VAITOGI COLLECTION SYSTEM DESIGN ($500,000).SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:ANTICIPATED DELIVERABLES AND EXPECTED OUTCOMES: IMPROVEMENTS TO ASPA'S WATER AND WASTEWATER SYSTEMS TO INSURE PROTECTION OF PUBLIC HEALTH AND THE ENVIRONMENT.$0
96975324↗Environmental Protection AgencyAMERICAN SAMOA POWER AUTHORITYFORMULA GRANT (A)2025-10-102025-10-101DESCRIPTION:THIS ASSISTANCE AGREEMENT INCLUDES FISCAL YEAR 2023 BIL AND BASE SRF DRINKING WATER AND CLEAN WATER STATE REVOLVING FUNDS GRANT FUNDS. THE PROPOSED PROJECTS WILL BE TAKEN FROM THE APPROVED PROJECT PRIORITY LIST. THE PROPOSED PROJECTS WILL FOCUS ON DRINKING WATER AND WASTEWATER SYSTEM IMPROVEMENTS TO INCLUDE REHABILITATION, REPLACEMENT AND INSTALLATION OF NEW INFRASTRUCTURE. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $29,729,000 WHICH INCLUDES $100,000 IN EPA IN-KIND SET ASIDE FUNDS. ACTIVITIES:WATER: $24,257,000(BIL) 1. TAFUNA ACP REPLACEMENT ($2,100,000) 2. NU'UULI ACP REPLACEMENT PHASE II ($2,500,000) 3. FAGAALU ACP REPLACEMENT PHASE II ($1,500,000) 4. AUA ACP REPLACEMENT ($1,500,000) 5. ESV SEA WATER DESALINATION PLANT 200GPM CAPACITY ($2,500,000) 6. DRINKING WATER EMERGING CONTAMINANTS ($300,000) 7. CENTRAL WATER SYSTEM NEW WELL DRILLING AND CONNECTIONS PHASE VI ($3,257,000) 8. SERVICE LINE REPLACEMENT (PHASE II) - VARIOUS VILLAGES ($4,900,000) 9. CONDUCT WATER SYSTEM LSL INVENTORY / SURVEY ($100,000) 10. HDPE PIPE REPLACEMENT PHASE IV ($3,000,000) 11. BOLTED STEEL TANKS REPLACEMENT/ REHABILITATION PROJECT ($1,400,000) 12. REHABILITATION OF EXISTING WELDED STEEL TANKS ($1,200,000) WASTEWATER: $5,472,000 (BASE SRF) 1. WWTP UPGRADING AND IMPROVEMENTS PH4 - ($2,000,000) 2. VAITOGI WASTEWATER COLLECTION SYSTEM CONSTRUCTION ($3,472,000)SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:IMPROVEMENTS TO ASPA'S WATER AND WASTEWATER SYSTEMS TO INSURE PROTECTION OF PUBLIC HEALTH AND THE ENVIRONMENT$0
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: XKBFZJPMNLN5 → AMERICAN SAMOA POWER AUTHORITY
  • Amounts are the award's obligations within the selected years, not its lifetime value.
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Business type (contracts), FY2026

Federal · obligations

FY2026

$374.2KOther than small (large)

Top 1 by obligations in FY2026. Leading: Other than small (large) ($374.19K).

Business typeObligations
Other than small (large)$374.2K
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Business types are the vendor's status as certified for each contract action (small or other than small, woman-owned, veteran-owned, 8(a), HUBZone...). They overlap (a firm can be small, woman-owned and 8(a) at once), so they don't add up to the total. This is who got the money, not whether the contract was set aside.
  • Contracts only (industry, product, set-aside and business-type details exist only for contracts).
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: XKBFZJPMNLN5 → AMERICAN SAMOA POWER AUTHORITY
  1. Source USAspending.gov prime awards · about the data

Open as a question →

SAM.gov registration

  • UEI XKBFZJPMNLN5 · CAGE code 0N2R4
  • All awards (contracts and assistance) · PAGO PAGO, AS
  • Registered since 2026-05-28; expires 2027-05-28
  • In business since 1982-11-10
  • Primary NAICS 221122 · registered for 2 industries

Red flags

No SAM.gov exclusion (debarment or suspension) and no single-audit findings on file for any of its registrations.

SAM.gov exclusions and the Federal Audit Clearinghouse (audits partly loaded).

From public government records, which may contain errors. Check the official source before relying on a number. Not financial, legal or investment advice. Terms · About the data

Download CSV of the summary: money by year, top agencies, industries, states and largest awards

Ask the AI chat about this company →