| 693JJ22440008YP27ORS001572BIPL↗ | Department of Transportation | OREGON DEPARTMENT OF TRANSPORTATION | PROJECT GRANT (B) | 2026-09-24 | 2026-09-24 | 1 | PROJECT TITLE: I-5: COLUMBIA RIVER BRIDGE REPLACEMENT :::: PROJECT DESCRIPTION: ADVANCE POST-NEPA DESIGN AND CONSTRUCTION ACTIVITIES FOR THE I-5 INTERSTATE BRIDGE REPLACEMENT OVER THE COLUMBIA RIVER BETWEEN OREGON AND WASHINGTON, ADJACENT TO THE EXISTING STRUCTURE. WORK WILL SUPPORT CONSTRUCTION OF NEW BRIDGES TO ACCOMMODATE HIGHWAY, TRANSIT, AND ACTIVE TRANSPORTATION MODES AND REMOVAL OF THE EXISTING INTERSTATE BRIDGE. REPLACING THE BRIDGE IS ANTICIPATED TO IMPROVE TRAFFIC AND MOBILITY FOR FREIGHT AND THE PUBLIC TRAVELING ACROSS THE RIVER. EARLY PROJECT DESIGN IS COVERED UNDER PROJECT KEY 21570. | $362.66M |
| 693JJ22440008YP27ORS001533BIPL↗ | Department of Transportation | OREGON DEPARTMENT OF TRANSPORTATION | PROJECT GRANT (B) | 2026-09-24 | 2026-09-24 | 1 | PROJECT TITLE: I-5: COLUMBIA RIVER (INTERSTATE) BRIDGE :::: PROJECT DESCRIPTION: PLANNING, DESIGN, RIGHT OF WAY, AND UTILITY RELOCATION FOR THE REPLACEMENT OF THE I-5 INTERSTATE BRIDGE BETWEEN OREGON AND WASHINGTON. REPLACING THE BRIDGE IS ANTICIPATED TO IMPROVE TRAFFIC AND MOBILITY FOR FREIGHT AND THE PUBLIC TRAVELING ACROSS THE RIVER. PROJECT ALSO INCLUDES RIGHT OF WAY ACQUISITION FOR THE DEMOLITION OF THE CURRENT INTERSTATE BRIDGE. | $183.46M |
| 693JJ22630000Y001ORS064063↗ | Department of Transportation | OREGON DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-09-24 | 2026-09-24 | 1 | PROJECT TITLE: I-205: I-5 TO OR213, PHASE 1A :::: PROJECT DESCRIPTION: THIS SEGMENT OF THE PROJECT WILL SEISMICALLY RETROFIT AND WIDEN THE ABERNETHY BRIDGE BY CONSTRUCTING GROUND IMPROVEMENTS, NEW FOUNDATIONS, SUB-STRUCTURE AND SUPERSTRUCTURE AND ADDING A LANE IN BOTH DIRECTIONS OF I-205. THE INTERCHANGE AT I-205 NB AND OR 43 WILL BE RECONSTRUCTED AND INCLUDE A ROUNDABOUT. THE INTERCHANGE AT OR 99 WILL BE RECONSTRUCTED TO ACCOMMODATE THE BRIDGE WIDENING. THE PROJECT INCLUDES A NOISE WALL IN THE VICINITY OF SB I-205 AT EXIT 9. STORMWATER, LANDSCAPING, PAVING, STRIPING, SIGNING AND LIGHTING ARE ALSO INCLUDED AS PART OF THIS PROJECT. | $57.39M |
| 693JJ22330000Y001ORS002245↗ | Department of Transportation | OREGON DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-07-15 | 2026-09-08 | 3 | PROJECT TITLE: I-84 (WESTBOUND): UNION PACIFIC RAILROAD BRIDGE (HOOD RIVER) :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT DUE TO DECK DETERIORATION AND SEISMIC PERFORMANCE. | $48.87M |
| 693JJ22530000Y240ORPR27001↗ | Department of Transportation | OREGON DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-06-10 | 2026-09-02 | 2 | PROJECT TITLE: STATE PLANNING AND RESEARCH SFY2026 - SPR PART 1 :::: PROJECT DESCRIPTION: SPR PART I WORK PROGRAM CONDUCTS PROJECT DEVELOPMENT ACTIVITIES FOR PLANNING, SCOPING OF PROJECTS, DATA COLLECTION AND DATA ANALYSIS TO DESIGN AND OPERATE AN EFFICIENT TRANSPORTATION SYSTEM FOR STATE FISCAL YEAR 2026. | $34.12M |
| 693JJ22630000Y240ORS026130↗ | Department of Transportation | OREGON DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-09-24 | 2026-09-24 | 1 | PROJECT TITLE: US26 (POWELL BLVD): SE 99TH AVE - EAST CITY LIMITS :::: PROJECT DESCRIPTION: WIDEN STREET TO THREE LANES (INCLUSIVE OF A CENTER TURN LANE) WITH SIDEWALKS AND BUFFERED BIKE LANES OR OTHER ENHANCED BIKE FACILITY AND TO ADD ENHANCED PEDESTRIAN AND BIKE CROSSINGS. THIS PROJECT IS INTENDED TO PROVIDE A SAFER CONTINUOUS TRAVEL FACILITY FOR MULTIPLE MODES OF TRAVEL AND ALLOW FOR A MORE CONNECTED NEIGHBORHOOD | $26.70M |
| 693JJ22230000Y240ORSA00488↗ | Department of Transportation | OREGON DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-03-04 | 2026-07-16 | 3 | PROJECT TITLE: WILLAMETTE RIVER: STORMWATER SOURCE CONTROL IMPROVEMENTS :::: PROJECT DESCRIPTION: COMPLETE THE DESIGN AND CONSTRUCTION OF SELECT SOURCE CONTROL MEASURES (SCMS) TO IMPROVE STORMWATER QUALITY WITHIN THE PORTLAND HARBOR FROM FREMONT BRIDGE AND ST. JOHNS BRIDGE INCLUDING SURROUNDING AREAS. | $25.01M |
| 693JJ22630000Y240ORS210022↗ | Department of Transportation | OREGON DEPARTMENT OF TRANSPORTATION | FORMULA GRANT (A) | 2026-09-23 | 2026-09-23 | 2 | PROJECT TITLE: OR34: VAN BUREN BRIDGE (CORVALLIS) :::: PROJECT DESCRIPTION: REPLACE BRIDGE DUE TO DETERIORATION WITH AN EARTHQUAKE RESILIENT BRIDGE, ADD NEW SIGNALIZED INTERSECTION AT 1ST AND VAN BUREN AND UPGRADE CURRENT TRAFFIC SIGNAL ELEMENTS AND CONTROLLER AT 2ND AND VAN BUREN TO IMPROVE TRAFFIC FLOW. | $22.84M |