Congressional earmarks in Alabama
Projects Congress paid for by name in the annual spending laws: House Community Project Funding and Senate Congressionally Directed Spending, FY2022–FY2024 and FY2026. 24 provisions worth $230.46M match. Updated 2026-11-21.
By year
FY2025: none (a full-year continuing resolution). FY2026: 8 of the 12 bills so far, from the House Appropriations Committee's tables and the explanatory statement printed in the Congressional Record (Labor-HHS-Education, Homeland Security, Transportation-HUD). Defense and State-Foreign Operations name none; Financial Services' short Senate list is published only as a scan and isn't loaded yet.
Requesting members
- Katie Boyd Britt Sen. AL · $83.15M · 8
- Mike Rogers Rep. AL · $49.51M · 5
- Tommy Tuberville Sen. AL · $39.70M · 8
- Mike Rogers Rep. AL · $32.00M · 1
- Terri A. Sewell Rep. AL · $21.80M · 2
- Robert B. Aderholt Rep. AL · $1.75M · 2
A project with several requesters counts for each of them.
By agency
- Department of Defense $230.46M · 24
Largest provisions
| FY | Project and recipient | Agency | Requested by | Amount |
|---|---|---|---|---|
| 2024 | Adv Individual Training Barracks Complex: Cost to Complete Fort Novosel (Fort Rucker) · AL | Department of Defense · Military Construction, Army | Senator Katie Britt AL | $41.20M |
| 2026 | General Purpose Warehouse · Anniston Army Depot | Department of Defense · Military Construction, Defense-wide | Representative Rogers AL | $32.00M |
| 2022 | Welding Facility · AL | Department of Defense · Military Construction, Army | Representative Michael Rogers AL | $25.01M $25.01M obligated by 9/30/23 |
| 2026 | Access Control Point · Anniston Army Depot | Department of Defense · Military Construction, Army | — | $18.00M |
| 2023 | Commercial Vehicle Inspection Gate · AL | Department of Defense · Military Construction, Air Force | Representative Terri Sewell AL | $15.00M $0 obligated by 9/30/23 |
| 2024 | Replace (Construct) Gunter Fitness Center: Unspecified Minor Construction Maxwell Air Force Base · AL | Department of Defense · Military Construction, Air Force | Senator Katie Britt AL | $8.80M |
| 2024 | Component Rebuild Shop: Planning and Design Anniston Army Depot · AL | Department of Defense · Military Construction, Army | Representative Michael Rogers AL | $8.10M |
| 2023 | High-Energy Density and High-Power Density Li-Ion Battery Magazines in Defense Applications Auburn University, Auburn, AL · AL | Department of Defense · RDTE,N | Representative Michael Rogers AL | $8.00M $0 obligated by 9/30/23 |
| 2024 | Army Radar Approach Control Facility: Unspecified Minor Construction Fort Novosel (Fort Rucker) · AL | Department of Defense · Military Construction, Army | Senator Katie Britt AL | $7.00M |
| 2023 | F-35 Weapons Load Crew Training Facility · AL | Department of Defense · Military Construction, Air National Guard | Representative Terri Sewell AL | $6.80M $6.80M obligated by 9/30/23 |
| 2024 | Ready Building—MEDEVAC: Unspecified Minor Construction Fort Novosel (Fort Rucker) · AL | Department of Defense · Military Construction, Army | Senator Katie Britt AL, Senator Thomas Tuberville AL | $6.10M |
| 2024 | Airfield Fire and Rescue Station: Unspecified Minor Construction Redstone Arsenal · AL | Department of Defense · Military Construction, Army | Senator Katie Britt AL | $5.60M |
| 2024 | Access Control Point: Planning and Design Anniston Army Depot · AL | Department of Defense · Military Construction, Army | Representative Michael Rogers AL | $5.50M |
| 2024 | Airport Runway Extension (Overruns): Unspecified Minor Construction Redstone Arsenal · AL | Department of Defense · Military Construction, Army | Senator Katie Britt AL, Senator Thomas Tuberville AL | $5.50M |
| 2024 | Test Area 7 Relocation: Unspecified Minor Construction Redstone Arsenal · AL | Department of Defense · Military Construction, Army | Senator Thomas Tuberville AL | $5.40M |
| 2024 | Construct Addition, Air Command and Staff College (Bldg 1402): Unspecified Minor Construction Maxwell Air Force Base · AL | Department of Defense · Military Construction, Air Force | Senator Katie Britt AL | $5.10M |
| 2024 | Vehicle Maintenance Storage Facility: Unspecified Minor Construction Fort Novosel (Fort Rucker) · AL | Department of Defense · Military Construction, Army | Senator Thomas Tuberville AL | $5.10M |
| 2024 | Aircraft Parts Storage Facility: Unspecified Minor Construction Fort Novosel (Fort Rucker) · AL | Department of Defense · Military Construction, Army | Senator Thomas Tuberville AL | $4.95M |
| 2024 | Natural Gas Expansion and Meter Station: Unspecified Minor Construction Redstone Arsenal · AL | Department of Defense · Military Construction, Army | Senator Thomas Tuberville AL | $4.80M |
| 2024 | Access Control Building: Unspecified Minor Construction Redstone Arsenal · AL | Department of Defense · Military Construction, Army | Senator Thomas Tuberville AL | $4.00M |
| 2024 | Hazardous Material Storage Building: Unspecified Minor Construction Fort Novosel (Fort Rucker) · AL | Department of Defense · Military Construction, Army | Senator Katie Britt AL, Senator Thomas Tuberville AL | $3.85M |
| 2024 | Vehicle Paint Shop: Planning and Design Anniston Army Depot · AL | Department of Defense · Military Construction, Army | Representative Michael Rogers AL | $2.90M |
| 2023 | Systems Engineering Technology Apprenticeship and Internship Program Institute for Digital Enterprise Advancement, Huntsville, AL · AL | Department of Defense · RDTE,DW | Representative Robert Aderholt AL | $1.20M $0 obligated by 9/30/23 |
| 2022 | Systems Engineering Technician Education Initiative Institute for Digital Enterprise Advancement, Huntsville, AL · AL | Department of Defense · RDTE,DW | Representative Robert Aderholt AL | $550.0K $499.9K obligated by 9/30/23 |
Enacted earmarks: FY2022-FY2024 from GAO's Tracking the Funds data; FY2025 had none (a full-year continuing resolution); FY2026 so far from the House Appropriations Committee's tables for 5 of the 12 enacted bills (Commerce-Justice-Science, Energy-Water and Interior with both chambers' items; Agriculture and Military Construction-VA with House items). Amounts are what the law provided, not what was spent. Sources: GAO, Tracking the Funds (FY2022–FY2024); House Appropriations Committee, FY2026 enacted legislation (FY2026). Requesters are matched to today's members of Congress by name and state; former members show as the source wrote them (FY2026 tables give last names only, matched on state).