FAR 25.201 Policy.
The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.
In plain English
FAR 25.201 requires contractors to use only domestic construction materials in construction contracts performed in the United States, unless an exception in 25.202 applies. It defines domestic construction materials through a two-part test: the article must be manufactured in the U.S., and it must meet specific domestic component cost thresholds that increase over time. This matters because noncompliance can make a contractor ineligible for award or subject to penalties.
Applies to: Construction contracts performed in the United States
What it requires
- Use only domestic construction materials in construction contracts performed in the United States, except as provided in 25.202.
- Ensure manufactured construction materials meet the two-part test for domestic construction materials: manufactured in the United States and meeting the applicable domestic component cost threshold.
- For construction material consisting wholly or predominantly of iron or steel, ensure the cost of foreign iron and steel is less than 5 percent of the cost of all components.
- For contracts spanning the domestic content threshold increases, comply with each increased threshold for items in the year of delivery, unless an alternate domestic content test is allowed.
Key terms: domestic construction materials · Buy American statute · two-part test · domestic components · foreign iron and steel
Written by AI from this section's text. A guide, not legal advice: the text below rules.
The text
(a) Except as provided in 25.202, use only domestic construction materials in construction contracts performed in the United States.
(b) The Buy American statute restricts the purchase of construction materials that are not domestic construction materials. For manufactured construction materials, the Buy American statute, E.O. 13881, and E.O. 14005 use a two-part test to define domestic construction materials.
(1) The article must be manufactured in the United States; and
(2)(i) Except for construction material that consists wholly or predominantly of iron or steel or a combination of both, the cost of domestic components must exceed 60 percent of the cost of all the components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029, but see paragraph (c) of this section. In accordance with 41 U.S.C. 1907, this domestic content test of the Buy American statute has been waived for acquisitions of COTS items (see 12.505(a)).
(ii) For construction material that consists wholly or predominantly of iron or steel or a combination of both, the cost of foreign iron and steel must constitute less than 5 percent of the cost of all the components used in such construction material (see the definition of “foreign iron and steel” at 25.003). The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. This domestic content test of the Buy American statute has not been waived for acquisitions of COTS items in this category, except for COTS fasteners.
(c)(1) A contract with a period of performance that spans the schedule of domestic content threshold increases specified in paragraph (b)(2)(i) of this section shall be required to comply with each increased threshold for the items in the year of delivery, unless the senior procurement executive of the contracting agency allows for application of an alternate domestic content test for that contract under which the domestic content threshold in effect at time of contract award will apply to the entire period of performance for the contract. This authority is not delegable. The senior procurement executive shall consult the Office of Management and Budget's Made in America Office before allowing the use of the alternate domestic content test.
(2) When a senior procurement executive allows for application of an alternate domestic content test for a contract, see 25.1102(a)(3) or (c)(4) for use of the appropriate Alternate clause to reflect the domestic content threshold that will apply to the entire period of performance for that contract.
Sections it refers to
Sections that refer to it
- 12.505 Applicability of certain laws to contracts for the acquisition of COTS items.
- 25.001 General.
- 25.003 Definitions.
- 25.200 Scope of subpart.
- 25.1102 Acquisition of construction.
- 252.225-7044 Balance of Payments Program—Construction Material.
- 252.225-7045 Balance of Payments Program—Construction Material Under Trade Agreements.
← 25.200 Scope of subpart. · 25.202 Exceptions. →
Rule changes for FAR Part 25
- Federal Acquisition Regulation: Trade Agreements Thresholds ↗ · final rule 2026-03-13 · effective 2026-03-13
- Federal Acquisition Regulation: Inflation Adjustment of Acquisition-Related Thresholds ↗ · final rule 2025-08-27 · effective 2025-10-01
- Federal Acquisition Regulation: List of Domestically Nonavailable Articles ↗ · final rule 2025-05-12 · effective 2025-06-11
- Federal Acquisition Regulation: Improving Consistency Between Procurement and Nonprocurement Procedures on Suspension and Debarment ↗ · final rule 2025-01-03 · effective 2025-01-17
- Federal Acquisition Regulation; Technical Amendments ↗ · final rule 2024-12-16 · effective 2025-01-03
- Federal Acquisition Regulation: Inflation Adjustment of Acquisition-Related Thresholds ↗ · proposed 2024-11-29 · comments due 2025-01-28
- Federal Acquisition Regulation: List of Domestically Nonavailable Articles ↗ · proposed 2024-10-23 · comments due 2024-12-23
- Federal Acquisition Regulation; Technical Amendments ↗ · final rule 2024-07-30 · effective 2024-08-29
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Plain words for the terms: glossary.