Contracting office · 1240LT
Usda-Fs, Csa Intermountain 8
Forest Service · Department of Agriculture
At a glance
- 187 active contracts, $90.49M
- 17% of its 537 competed contracts drew a single offer (last 3 years)
- Usually buys through: Standalone contract
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 237990 Other Heavy and Civil Engineering Construction $13.10M
- 236220 Commercial and Institutional Building Construction $10.73M
- 237310 Highway, Street, and Bridge Construction $10.07M
- 238160 Roofing Contractors $1.29M
- 541330 Engineering Services $1.29M
- 238990 All Other Specialty Trade Contractors $1.19M
- 237110 Water and Sewer Line and Related Structures Construction $1.07M
- 221310 Water Supply and Irrigation Systems $692.9K
Who it buys from, FY2025
- Ec Praus LLC $9.40M
- Price Contracting Inc $4.25M
- Jackson Excavation Inc $3.94M
- Iicon Construction Colorado, LLC $3.22M
- Michael Baird Construction, LLC $1.83M
- Guardian DB Services,llc $1.72M
- Medved Global LLC $1.61M
- Yale Creek Inc $1.29M
- Case, Lowe & Hart, Inc. $1.10M
- Rusty Bucket Construction LLC $1.03M
Contracts ending in the next 12 months
16 contracts, $41.63M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| 1240LT25C0014 CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS, AND LABOR NECESSARY TO REPLACE THE EXISTING ROOFING ON ALL WINGS (A, B, C, AND D) OF THE MISSOULA FIRE SCIENCES LABORATORY, WITH OPTIONAL ADDITIONS TO INCREASE ROOF INSULATION THICKNESS AND REPLACE W | Rusty Bucket Construction LLC | 2026-10-30 | $1.03M |
| 1240LT26P0013 0401 LUCERNE CAMPGROUND CONSTRUCTION PHASE 5 | Advanced Solutions Group, LLC | 2026-11-30 | $2.00M |
| 1240LT25C0021 GAOA JOES VALLEY CAMPGROUND RESTORATION | Big Duke Construction LLC | 2026-11-30 | $1.14M |
| 1240LT25C0016 BUFFALO CREEK WORK CENTER OFFICE & ENGINE STORAGE ADDITIONS PSICC NATIONAL FOREST | Iicon Construction Colorado, LLC | 2027-01-18 | $3.32M |
| 1240LT26P0033 GAOA RED CANYON CORRIDOR PAVING AND CAMPGROUND RESTORATION PROJECT, ASHLEY NATIONAL FOREST | Guardian Construction, Inc. | 2027-01-18 | $2.84M |
| 1240LT26C0003 REPLACEMENT OF WEST MUDDY CREEK BRIDGES #4 AND #5 PER DRAWINGS AND SPECIFICATIONS. GRAND MESA, UNCOMPAHGRE AND GUNNISON NF | GCS LLC | 2027-01-30 | $2.40M |
| 1240LT26P0023 GAOA CHILAO CAMPGROUND COMPLEX - WATER SYSTEM REHABILITATION, ANGELES NATIONAL FOREST | E2 Contracting, Inc. | 2027-02-15 | $2.91M |
| 1240LT26C0038 MOUNTAIN SPRINGS FIRE COMPLEX DESIGN DOCUMENT DEVELOPMENT FY26 THIS PROJECT IS TO DESIGN THE NEW MOUNTAIN SPRINGS FIRE COMPLEX THROUGH AN A/E FIRM. PROJECT IS LOCATED NEAR THE INTERSECTION OF LOVELL CANYON ROAD AND NEVADA STATE HIGHWAY 160 NEAR MOUN | Lga Architecture | 2027-02-15 | $1.15M |
| 1240LT26F0004 GAOA COTTONWOOD BRIDGE REPLACEMENT | Meridian Engineering Co | 2027-05-20 | $1.37M |
| 1240LT26C0005 THIS GAOA PROJECT WILL MAKE IMPROVEMENTS TO THE ROAD - TO INCLUDE DESIGN, CONSTRUCTION AND RESURFACING. PACTOLA CAMPGROUND LOOP B WILL BE RECONSTRUCTED TO INCREASE CAPACITY, IMPROVE THE WATER SYSTEM, AND IMPROVE HOST SITES WITH REPAIRED SEWAGE VAULTS | Quality Driven Service LLC | 2027-05-20 | $1.31M |
Open notices
- GAOA High Sierra Ranger Station Upgrades, Sierra National Forest · Combined Synopsis/Solicitation · due 2026-10-14 · Small Business Set Aside - Total
- Nemo Domestic Well Northern Hills Ranger District, Black Hills NF, South Dakota · Combined Synopsis/Solicitation · due 2026-10-14 · Small Business Set Aside - Total
- Lone Cone Chinking, GMUG NF, Norwood Road, Colorado · Combined Synopsis/Solicitation · due 2026-10-27 · Small Business Set Aside - Total
From USAspending.gov prime awards and SAM.gov notices. Sources and limits