Contracting office · 1240LT
USDA-FS, CSA Intermountain 8
Forest Service · Department of Agriculture
USDA-FS, CSA Intermountain 8 (contracting office 1240LT, Forest Service) obligated $71.14M on contracts in FY2026 so far. It buys mostly highway, street, and bridge construction, most from Jackson Excavation Inc. It has 163 active contracts worth $89.19M. Of its 545 competed contracts in the last three years, 17% drew a single offer.
Key facts · data as of Nov 14, 2026
- Obligations, FY2026 so far
- $71.14M
- Active contracts
- 163, $89.19M
- Buys most
- Highway, Street, and Bridge Construction
- Largest vendor
- Jackson Excavation Inc ($8.00M)
- Competed contracts with one offer
- 17%
- Open notices now
- 2
Source: USAspending.gov prime contract awards (obligations: money committed, net of de-obligations) and SAM.gov notices, data as of Nov 14, 2026.
Cite this page: SpendQuery, USDA-FS, CSA Intermountain 8 (1240LT) federal contracts, data as of Nov 14, 2026, https://spendquery.com/office?code=1240LT
This USDA Forest Service office mostly buys highway, street, and bridge construction, with $36.26M of its $71.14M in FY2026 obligations going there. Its largest vendors that year were Jackson Excavation Inc ($8.00M) and Veritas Facility Services and Construction, Inc ($4.03M). It usually buys through contract vehicles (IDVs), and 17% of its 545 competed contracts over the last three years drew only one offer. (AI summary of the numbers on this page, checked against them; how)
At a glance
- 163 active contracts, $89.19M
- 17% of its 545 competed contracts drew a single offer (last 3 years)
- Usually buys through: Contract vehicle (IDV) itself
- Posts the follow-on notice a median 210 days before a contract ends (middle half: 377 to 30 days; 35 contracts)
- Gives a median 29 days to respond (126 solicitations, last 3 years)
- Amends 85% of its solicitations at least once
- A median 51 days from the first notice to the award notice (12 awards)
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
Who wins here
Open to newcomers 17% of its 128 contracts since FY2025 went to a company's first win since 2023; 42% to companies with 5 wins or fewer.
- First win since 2023: 22
- 2nd–5th win: 32
- 6th–10th win: 15
- More than 10 wins: 59
A win = a contract or order of $10,000 or more; a company counts with its subsidiaries. Our contract data starts with FY2023, so “first” means first since 2023. Orders under someone's IDIQ, GWAC or BPA count toward a company's wins but not in the shares.
What it buys, FY2026
- 237310 Highway, Street, and Bridge Construction $36.26M
- 237990 Other Heavy and Civil Engineering Construction $11.08M
- 236220 Commercial and Institutional Building Construction $8.17M
- 237110 Water and Sewer Line and Related Structures Construction $5.60M
- 236118 Residential Remodelers $2.83M
- 238990 All Other Specialty Trade Contractors $2.20M
- 541330 Engineering Services $1.23M
- 212319 Other Crushed and Broken Stone Mining and Quarrying $921.4K
Who it buys from, FY2026
- Jackson Excavation Inc $8.00M
- Veritas Facility Services and Construction, Inc $4.03M
- Price Contracting Inc $3.97M
- Bent LLC $3.73M
- E2 Contracting, Inc. $2.91M
- Guardian Construction, Inc. $2.84M
- GCS LLC $2.67M
- Quality Driven Service LLC $2.64M
- Wesslen Construction and Development, Inc $2.62M
- Oedekoven Excavating & Construction LLC $2.56M
Contracts ending in the next 12 months
20 contracts, $50.06M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| 1240LT26P0013 0401 LUCERNE CAMPGROUND CONSTRUCTION PHASE 5 | Advanced Solutions Group, LLC | 2026-11-30 | $2.00M |
| 1240LT25C0021 GAOA JOES VALLEY CAMPGROUND RESTORATION | Big Duke Construction LLC | 2026-11-30 | $1.14M |
| 1240LT25C0016 BUFFALO CREEK WORK CENTER OFFICE & ENGINE STORAGE ADDITIONS PSICC NATIONAL FOREST | Iicon Construction Colorado, LLC | 2027-01-18 | $3.32M |
| 1240LT26P0033 GAOA RED CANYON CORRIDOR PAVING AND CAMPGROUND RESTORATION PROJECT, ASHLEY NATIONAL FOREST | Guardian Construction, Inc. | 2027-01-18 | $2.84M |
| 1240LT26C0003 REPLACEMENT OF WEST MUDDY CREEK BRIDGES #4 AND #5 PER DRAWINGS AND SPECIFICATIONS. GRAND MESA, UNCOMPAHGRE AND GUNNISON NF | GCS LLC | 2027-01-30 | $2.40M |
| 1240LT26P0023 GAOA CHILAO CAMPGROUND COMPLEX - WATER SYSTEM REHABILITATION, ANGELES NATIONAL FOREST | E2 Contracting, Inc. | 2027-02-15 | $2.91M |
| 1240LT26C0038 MOUNTAIN SPRINGS FIRE COMPLEX DESIGN DOCUMENT DEVELOPMENT FY26 THIS PROJECT IS TO DESIGN THE NEW MOUNTAIN SPRINGS FIRE COMPLEX THROUGH AN A/E FIRM. PROJECT IS LOCATED NEAR THE INTERSECTION OF LOVELL CANYON ROAD AND NEVADA STATE HIGHWAY 160 NEAR MOUN | Lga Architecture | 2027-02-15 | $1.15M |
| 1240LT26F0069 | Cutting Edge Contractors Inc | 2027-03-28 | $1.47M |
| 1240LT26F0004 GAOA COTTONWOOD BRIDGE REPLACEMENT | Meridian Engineering Co | 2027-05-20 | $1.37M |
| 1240LT26C0005 THIS GAOA PROJECT WILL MAKE IMPROVEMENTS TO THE ROAD - TO INCLUDE DESIGN, CONSTRUCTION AND RESURFACING. PACTOLA CAMPGROUND LOOP B WILL BE RECONSTRUCTED TO INCREASE CAPACITY, IMPROVE THE WATER SYSTEM, AND IMPROVE HOST SITES WITH REPAIRED SEWAGE VAULTS | Quality Driven Service LLC | 2027-05-20 | $1.31M |
Open notices
- Administrative Parking Lot Repairs · Solicitation · due 2026-11-23 · Small Business Set Aside - Total
- Picnic Tables & Bear Lockers with Install · Combined Synopsis/Solicitation · due 2026-11-24 · Small Business Set Aside - Total
From USAspending.gov prime awards and SAM.gov notices. Sources and limits