Contracting office · 1240LT

Usda-Fs, Csa Intermountain 8

Forest Service · Department of Agriculture

At a glance

  • 187 active contracts, $90.49M
  • 17% of its 537 competed contracts drew a single offer (last 3 years)
  • Usually buys through: Standalone contract

Money by year

  • FY2023$56.72M
  • FY2024$42.93M
  • FY2025$42.03M
  • FY2026$63.17M

Obligations (money committed) in prime awards, from USAspending.gov.

Contracts ending in the next 12 months

16 contracts, $41.63M with options. The largest:

ContractIncumbentEndsValue with options
1240LT25C0014
CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS, AND LABOR NECESSARY TO REPLACE THE EXISTING ROOFING ON ALL WINGS (A, B, C, AND D) OF THE MISSOULA FIRE SCIENCES LABORATORY, WITH OPTIONAL ADDITIONS TO INCREASE ROOF INSULATION THICKNESS AND REPLACE W
Rusty Bucket Construction LLC2026-10-30$1.03M
1240LT26P0013
0401 LUCERNE CAMPGROUND CONSTRUCTION PHASE 5
Advanced Solutions Group, LLC2026-11-30$2.00M
1240LT25C0021
GAOA JOES VALLEY CAMPGROUND RESTORATION
Big Duke Construction LLC2026-11-30$1.14M
1240LT25C0016
BUFFALO CREEK WORK CENTER OFFICE & ENGINE STORAGE ADDITIONS PSICC NATIONAL FOREST
Iicon Construction Colorado, LLC2027-01-18$3.32M
1240LT26P0033
GAOA RED CANYON CORRIDOR PAVING AND CAMPGROUND RESTORATION PROJECT, ASHLEY NATIONAL FOREST
Guardian Construction, Inc.2027-01-18$2.84M
1240LT26C0003
REPLACEMENT OF WEST MUDDY CREEK BRIDGES #4 AND #5 PER DRAWINGS AND SPECIFICATIONS. GRAND MESA, UNCOMPAHGRE AND GUNNISON NF
GCS LLC2027-01-30$2.40M
1240LT26P0023
GAOA CHILAO CAMPGROUND COMPLEX - WATER SYSTEM REHABILITATION, ANGELES NATIONAL FOREST
E2 Contracting, Inc.2027-02-15$2.91M
1240LT26C0038
MOUNTAIN SPRINGS FIRE COMPLEX DESIGN DOCUMENT DEVELOPMENT FY26 THIS PROJECT IS TO DESIGN THE NEW MOUNTAIN SPRINGS FIRE COMPLEX THROUGH AN A/E FIRM. PROJECT IS LOCATED NEAR THE INTERSECTION OF LOVELL CANYON ROAD AND NEVADA STATE HIGHWAY 160 NEAR MOUN
Lga Architecture2027-02-15$1.15M
1240LT26F0004
GAOA COTTONWOOD BRIDGE REPLACEMENT
Meridian Engineering Co2027-05-20$1.37M
1240LT26C0005
THIS GAOA PROJECT WILL MAKE IMPROVEMENTS TO THE ROAD - TO INCLUDE DESIGN, CONSTRUCTION AND RESURFACING. PACTOLA CAMPGROUND LOOP B WILL BE RECONSTRUCTED TO INCREASE CAPACITY, IMPROVE THE WATER SYSTEM, AND IMPROVE HOST SITES WITH REPAIRED SEWAGE VAULTS
Quality Driven Service LLC2027-05-20$1.31M

All of them, with filters →

Open notices

All 3 open notices →

From USAspending.gov prime awards and SAM.gov notices. Sources and limits