Contracting office · 124452
Usda-Fs, Csa East 12
Forest Service · Department of Agriculture
At a glance
- 145 active contracts, $104.86M
- 29% of its 241 competed contracts drew a single offer (last 3 years)
- Usually buys through: Contract vehicle (IDV) itself
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 237310 Highway, Street, and Bridge Construction $64.63M
- 236220 Commercial and Institutional Building Construction $26.97M
- 541330 Engineering Services $1.42M
- 115310 Support Activities for Forestry $1.19M
- 541620 Environmental Consulting Services $248.5K
- 238990 All Other Specialty Trade Contractors $149.9K
- 238220 Plumbing, Heating, and Air-Conditioning Contractors $128.5K
- 238210 Electrical Contractors and Other Wiring Installation Contractors $39.5K
Who it buys from, FY2025
- Williams Construction & Cabinetry, Inc. $28.07M
- Wright Bros LLC $17.53M
- Jpi Construction LLC $13.72M
- Terra Site Constructors LLC $8.02M
- Mccalls Grading & Construction Inc $7.25M
- Mckenzie Construction & Site Development LLC $6.59M
- Adams Contracting Co $6.52M
- Tag Contracting, Inc. $4.58M
- Cauble & Sons Grading & Stone Work, Inc $1.01M
- Blytheco Construction LLC $937.7K
Contracts ending in the next 12 months
18 contracts, $94.26M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| 12445225F0033 CHEOAH AND TUSQUITEE ROAD REHABILITATION PROJECT | Adams Contracting Co | 2026-10-19 | $5.68M |
| 12445225C0015 GAOA DAVIDSON RIVER CAMPGROUND RECONSTRUCTION | Wright Bros LLC | 2026-10-31 | $18.13M |
| 12445224C0025 REPAIRS TO THIRTEEN (13) DAMAGED TRAIL SITES. THE GOVT. FURNISHED A DESIGN-BID-BUILD TO A TOTAL OF NINE (9) OF THE DAMAGED SITES, MISCELLANEOUS TRAIL SPOT SURFACING TO APPROX. TWO (2) SITES, AND THE REMAINING LAST TWO (2) SITES WILL REQUIRE A CONTRAC | Jpi Construction LLC | 2026-12-26 | $4.98M |
| 12445224F0040 0805 GAOA DESIGN AND A/E SERVICES FOR THE OSCEOLA RANGER DISTRICT OFFICE | Walker Architects Inc | 2026-12-28 | $1.09M |
| 12445225F0050 REPLACEMENT OF BRIDGES 475-3.3 AND 475-4.2 ON NFSR 475 - DAVIDSON RIVER ROAD & COVE CREEK | Williams Construction & Cabinetry, Inc. | 2026-12-31 | $3.21M |
| 12445226F0022 SAVANNAH RIVER SITE ROAD & FENCE CONSTRUCTION, MAINTENANCE, & REPAIR IDIQ LOCATION: NEW ELLENTON, SC | N5 Contracting, LLC. | 2026-12-31 | $1.92M |
| 12445226F0013 PROJECT: TALLASEEHATCHEE CREEK BRIDGE REPLACEMENT LOCATION: TALLADEGA RANGER DISTRICT | Aaecon General Contracting LLC | 2027-02-05 | $1.03M |
| 12445226P0002 THIS PROJECT WILL REPLACE THE EXISTING SCHENCK JOB CORPS PUMP STATION AND EXISTING FORCE MAIN TO CONNECT THE DAVIDSON RIVER CAMPGROUND AND PISGAH RANGER DISTRICT FACILITIES NORTH OF US 276 TO THE CITY OF BREVARD WASTEWATER COLLECTION SYSTEM. THIS INF | Wright Bros LLC | 2027-02-09 | $5.02M |
| 12445225C0030 LA MINA TRAIL RECONSTRUCTION DB PROJECT | Jpi Construction LLC | 2027-04-30 | $11.93M |
| 12445226P0003 THE EXISTING WASTEWATER PLANT DAMAMGED BY HURRICANE HELENE WILL BE DECOMMISSIONED, AND THE LAKE POWHATAN RECREATION AREA WILL BE CONNECTED TO MUNICIPAL SEWER BY THE CONSTRUCTION OF AND NEW FORCE MAIN AND UPGRADE OF THE EXISTING PUMP STATION. THIS | Teraflex Group LLC | 2027-05-23 | $1.92M |
Open notices
None open right now. Set an alert for the next one.
From USAspending.gov prime awards and SAM.gov notices. Sources and limits