Contracting office · 124455
USDA-FS, CSA East 13
Forest Service · Department of Agriculture
USDA-FS, CSA East 13 (contracting office 124455, Forest Service) obligated $55.32M on contracts in FY2026 so far. It buys mostly highway, street, and bridge construction, most from Gaver Industries, Inc. It has 303 active contracts worth $40.47M. Of its 500 competed contracts in the last three years, 31% drew a single offer.
Key facts · data as of Nov 18, 2026
- Obligations, FY2026 so far
- $55.32M
- Active contracts
- 303, $40.47M
- Buys most
- Highway, Street, and Bridge Construction
- Largest vendor
- Gaver Industries, Inc. ($8.20M)
- Competed contracts with one offer
- 31%
- Open notices now
- 2
Source: USAspending.gov prime contract awards (obligations: money committed, net of de-obligations) and SAM.gov notices, data as of Nov 18, 2026.
Cite this page: SpendQuery, USDA-FS, CSA East 13 (124455) federal contracts, data as of Nov 18, 2026, https://spendquery.com/office?code=124455
Most of this USDA Forest Service office's buying is highway, street, and bridge construction, with heavy civil engineering and surveying work trailing well behind. In FY2026 its top vendors were Gaver Industries, HCS Inc Commercial General Contractor, SD Resources, and Tempo Construction. It usually buys through indefinite-delivery contracts, and 31% of its competed contracts over the last three years drew only one offer, out of 500. (AI summary of the numbers on this page, checked against them; how)
At a glance
- 303 active contracts, $40.47M
- 31% of its 500 competed contracts drew a single offer (last 3 years)
- Usually buys through: Contract vehicle (IDV) itself
- Posts the follow-on notice a median 140 days before a contract ends (middle half: 261 to 21 days; 17 contracts)
- Gives a median 28 days to respond (147 solicitations, last 3 years)
- Amends 71% of its solicitations at least once
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
Who wins here
Open to newcomers 25% of its 122 contracts since FY2025 went to a company's first win since 2023; 49% to companies with 5 wins or fewer.
- First win since 2023: 31
- 2nd–5th win: 29
- 6th–10th win: 17
- More than 10 wins: 45
A win = a contract or order of $10,000 or more; a company counts with its subsidiaries. Our contract data starts with FY2023, so “first” means first since 2023. Orders under someone's IDIQ, GWAC or BPA count toward a company's wins but not in the shares.
What it buys, FY2026
- 237310 Highway, Street, and Bridge Construction $37.83M
- 237990 Other Heavy and Civil Engineering Construction $6.62M
- 541370 Surveying and Mapping (Except Geophysical) Services $3.94M
- 236220 Commercial and Institutional Building Construction $2.50M
- 541330 Engineering Services $1.88M
- 541310 Architectural Services $708.4K
- 238990 All Other Specialty Trade Contractors $383.3K
- 238190 Other Foundation, Structure, and Building Exterior Contractors $380.3K
Who it buys from, FY2026
- Gaver Industries, Inc. $8.20M
- HCS Inc Commercial General Contractor $3.60M
- SD Resources Inc $3.46M
- Tempo Construction LLC $2.99M
- Kovilic Construction Co Inc $2.77M
- All Concrete Inc $2.17M
- Varner Construction LLC $1.90M
- R.M. Piper, Inc. $1.67M
- Calderwood Wood Products & Services LLC $1.52M
- D.J. Group Inc $1.48M
Contracts ending in the next 12 months
7 contracts, $13.34M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| 12445526P0048 CONSTRUCTION SERVICES FOR FURNISHING AND INSTALLING ONE (1) SINGLE SPAN STEEL GIRDER, TIMBER DECK, AND FULL WIDTH TIMBER WEARING SURFACE BRIDGE ON FR 81 ON THE MONONGAHELA NATIONAL FOREST. THE WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, CONSTRUCTION | Varner Construction LLC | 2026-12-07 | $1.30M |
| 12445525C0017 REPLACEMENT OF THE BUNKHOUSE AT THE SEAGULL GUARD STATION | Razor Consulting Solutions, Inc | 2027-01-08 | $1.49M |
| 12445525C0013 STONY POINT CAMPGROUND IMPROVEMENTS | Gustav & Rudy Contractors, Inc. | 2027-05-07 | $1.07M |
| 12445526C0038 IMPROVEMENTS TO CRANE LAKE DAM SUCH AS: CLEAR AND REMOVE UPPER LAYER OF ORGANIC MATERIAL THAT IS UNSUITABLE AS EMBANKMENT FILL; REMOVE AND RECYCLE EXISTING TRAINING WALLS AND APPURTENANCES; INSTALLATION OF NEW CONDUIT, LEVEL CONTROL STRUCTURE, AND AP | SD Resources Inc | 2027-08-16 | $3.46M |
| 12445526C0007 BLACK RIVER HARBOR WATERFALL OVERLOOK RECONSTRUCTION 2026 | Nasi Construction LLC | 2027-10-31 | $1.55M |
| 12445526P0039 THIS PROJECT IS FOR THE RECONSTRUCTION OF ROB BROOK ROAD BRIDGE ON THE WHITE MOUNTAIN NATIONAL FOREST. WORK INCLUDES BUT IS NOT LIMITED TO DEMOLITION OF THE EXISTING 28' BRIDGE STRUCTURE, PROPER DISPOSAL OF ALL MATERIALS, AND CONSTRUCTION OF THE | R.M. Piper, Inc. | 2027-11-10 | $1.70M |
| 12445526C0010 HUNTINGTON RAVINE WAT BRIDGES REPLACEMENT | Kovilic Construction Co Inc | 2027-11-19 | $2.77M |
Open notices
- GMF Rochester Workshop Bathrooms · Special Notice · due 2026-11-20 · Small Business Set Aside - Total
- Whiteface Campground Well Replacement · Solicitation · due 2026-12-14 · Small Business Set Aside - Total
From USAspending.gov prime awards and SAM.gov notices. Sources and limits