Contracting office · 127EAX
Usda-Fs, Csa Southwest 7
Forest Service · Department of Agriculture
At a glance
- 45 active contracts, $40.45M
- 15% of its 187 competed contracts drew a single offer (last 3 years)
- Usually buys through: Standalone contract
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 237310 Highway, Street, and Bridge Construction $7.38M
- 236220 Commercial and Institutional Building Construction $1.25M
- 212321 Construction Sand and Gravel Mining $631.9K
- 237110 Water and Sewer Line and Related Structures Construction $224.1K
- 238220 Plumbing, Heating, and Air-Conditioning Contractors $93.8K
- 238190 Other Foundation, Structure, and Building Exterior Contractors $29.8K
- 238350 Finish Carpentry Contractors $23.5K
- 237990 Other Heavy and Civil Engineering Construction $17.1K
Who it buys from, FY2025
- Atlantic Pacific Standard LLC $4.60M
- Ironwood Commercial Builders Inc $1.26M
- Age General Engineering Co, Inc $993.3K
- Yorkshire Industries LLC $549.2K
- Cutting Edge Contractors Inc $476.5K
- Cauble & Sons Grading & Stone Work, Inc $463.3K
- Kramme Construction, LLC $323.6K
- Schuck Development Corp $308.3K
- Dap Construction Management, LLC $220.5K
- Civil Design & Engineering Inc $215.9K
Contracts ending in the next 12 months
10 contracts, $30.74M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| 127EAX26C0003 PROJECT IS TO CONSTRUCT ADDITIONAL PAVED PARKING AREAS AT THE CHINA WALL OHV STAGING AREA. PROJECT INCLUDES BUT IS NOT LIMITED TO, SITE CLEARING AND GRUBBING, GRADING, SAW CUTTING EXISTING ASPHALT, SUBBASE AND BASE PREPARATION, DRAINAGE FEATURES, AGG | Baldoni Construction Service, Inc. a California Corporation | 2026-10-30 | $1.05M |
| 127EAX26F0008 | Jake Lovato | 2026-12-29 | $1.33M |
| 127EAX24C0054 AMENDMENT II - THIS PROJECT IS CONSTRUCTION OF A NEW OFFICE BUILDING LESS THAN 5,000 SQUARE FEET, ASSOCIATED NEW SEPTIC SYSTEM, CONNECTION TO EXISTING POWER, WATER, AND PROPANE GAS FOR UTILITIES. ONCE THE NEW OFFICE IS CONSTRUCTED THE EXISTING OFFICE | DH Ortega Construction LLC | 2026-12-31 | $5.20M |
| 127EAX26F0001 REPAIR TO TWO SITES ON FSR 552 REPAIR TO LOCKETT MEADOW CAMPGROUND AND TRAILHEAD FACILITIES TASK ORDER UNDER THE COCONINO & KAIBAB ROADS CONSTRUCTION IDIQ | Meridian Engineering Co | 2026-12-31 | $1.94M |
| 127EAX26P0011 | 2027-02-01 | $2.07M | |
| 127EAX26P0007 GIBBS WASH BRIDGE REPLACEMENT, CORONADO NATIONAL FOREST. | Whelcon Contractors LLC | 2027-06-14 | $1.30M |
| 127EAX26P0018 | Young Gun Construction LLC | 2027-06-30 | $1.72M |
| 127EAX26P0006 0301 GAOA BLACK JACK CAMPGROUND RENOVATION, APACHE-SITGREAVES NATIONAL FOREST | Eastsew LLC | 2027-07-06 | $1.80M |
| 127EAX26C0026 THE GILA NATIONAL FOREST HAS A REQUIREMENT FOR THE REHABILITATION AND MAINTENANCE OF NATIONAL FOREST SYSTEM ROAD (NFSR) 141 FROM MILEPOST 0.69 TO MILEPOST 18.81. WORK INCLUDES BUT IS NOT LIMITED TO PULVERIZING THE ENTIRE EXISTING CHIP SEAL SURFACE T | Surface Contracting, Inc | 2027-07-21 | $13.26M |
| 127EAX26C0022 IMPROVEMENTS TO THE EXISTING HOPEWELL RECREATION SITE INCLUDING BUT NOT LIMITED TO: IMPROVED PUBLIC ACCESS, PUBLIC RECREATIONAL OPPORTUNITIES AND TO THE DRINKING WATER SYSTEM. | Mountain Valley Services LLC | 2027-08-09 | $1.07M |
Open notices
- Shirley Creek Campground Improvements · Combined Synopsis/Solicitation · due 2026-10-07 · Small Business Set Aside - Total
- Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF · Combined Synopsis/Solicitation · due 2026-10-12 · Small Business Set Aside - Total
From USAspending.gov prime awards and SAM.gov notices. Sources and limits