Contracting office · 191BWC

International Boundary Water Comm US Mex

International Boundary and Water Commission: U.S.-Mexico · Department of State

At a glance

  • 117 active contracts, $807.84M
  • 30% of its 345 competed contracts drew a single offer (last 3 years)
  • Usually buys through: Standalone contract

Money by year

  • FY2023$141.16M
  • FY2024$159.96M
  • FY2025$130.18M
  • FY2026$551.72M

Obligations (money committed) in prime awards, from USAspending.gov.

Contracts ending in the next 12 months

18 contracts, $184.51M with options. The largest:

ContractIncumbentEndsValue with options
IBM17T0010
IGF::OT::IGF DESIGN FOR THE SUNLAND PARK LEVEE REPAIR
Arcadis U.S., Inc.2026-12-31$1.84M
191BWC22F0070
ARCHITECT-ENGINEER SERVICES IDIQ- HYDRAULIC MODELING, SEDIMENT ACCUMULATION AND FLOW CAPACITY ANALYSIS
Stantec Consulting Services Inc.2026-12-31$1.62M
191BWC24P0111
---------- COMMENTS: THIS PR IS TO SECURE THE SERVICES OF A CONTRACTOR WITH THE KNOWLEDGE, SKILLS AND ABILITIES TO REPLACE AND UPGRADE DIFFUSERS IN TRAIN 1 AT THE NOGALES INTERNATIONAL WASTEWATER TREATMENT PLANT (NIWTP), AS WELL AS REPLACE AND INSTAL
Clean Infusion LLC2026-12-31$1.21M
191BWC26P0033
GLYCERIN SUPPLY AND DELIVERY
Momar, Incorporated2027-01-08$3.43M
191BWC26C0089Trojan Technologies Corp2027-01-28$1.43M
191BWC25F0072
---------- COMMENTS: THE BRIDGE ENGINEERING STUDY IS TO ASSESS THE FEASIBILITY AND COSTS ASSOCIATED WITH ALTERNATIVES TO PLACING A CRANE ON THE ANZALDUAS DAM EXISTING BRIDGE DECK. THE DIMENSIONS AND STRUCTURAL ELEMENTS OF THE BRIDGE DECK DO NOT ALLOW
Stantec Consulting Services Inc.2027-01-31$1.51M
191BWC25P0090
SLUDGE TRANSPORT AS PER THE ATTACHED SCOPE OF WORK POP: 9/7/2025 TO 3/7/2028. QUANTITIES MAY INCREASE OR DECREASE, INVOICING SHOULD REFLECT THE EXACT QUANTITIES RECEIVED UPON RECEIPT.
Tatonka Trucking LLC.2027-03-07$7.07M
191BWC25C0102
---------- COMMENTS: THE USIBWC SEEKS SLUDGE DRYING/DEWATERING EFFORTS AT THE NIWTP THRU CURRENT OR INNOVATIVE TECHNOLOGY THAT WILL REDUCE THE VOLUME OF SLUDGE THAT IS PRODUCED AND TRANSPORTED TO LANDFILLS, PROVIDING UNATTENDED OPERATING CAPABILITIE
Sunstate Environmental Services Inc2027-03-27$17.52M
191BWC26C0043
---------- COMMENTS: THE SBIWTP IS A 25 MILLION GALLON PER DAY WASTEWATER TREATMENT PLANT THAT TREATS WASTEWATER ORIGINATING FROM TIJUANA, BAJA CALIFORNIA, MEXICO. THE TREATMENT SYSTEM INCLUDES AUXILIARY FACILITIES SUCH AS THE CANYON COLLECTION SYST
Veolia Water West Operating Services Inc2027-03-31$27.29M
191BWC25C0088
AMISTAD RESERVOIR AND DAM REPLACEMENT OF PENSTOCK #5
Texas Electrical & Testing Services LLC2027-03-31$2.59M

All of them, with filters →

Open notices

None open right now. Set an alert for the next one.

From USAspending.gov prime awards and SAM.gov notices. Sources and limits