Contracting office · 191BWC
International Boundary Water Comm US Mex
International Boundary and Water Commission: U.S.-Mexico · Department of State
At a glance
- 117 active contracts, $807.84M
- 30% of its 345 competed contracts drew a single offer (last 3 years)
- Usually buys through: Standalone contract
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 221320 Sewage Treatment Facilities $52.79M
- 237990 Other Heavy and Civil Engineering Construction $19.28M
- 237110 Water and Sewer Line and Related Structures Construction $17.76M
- 541330 Engineering Services $10.04M
- 221122 Electric Power Distribution $7.46M
- 333120 Construction Machinery Manufacturing $4.52M
- 541519 Other Computer Related Services $1.79M
- 541380 Testing Laboratories and Services $1.76M
Who it buys from, FY2025
- Veolia Water West Operating Services Inc $35.09M
- PCL Employees Holdings Limited $17.61M
- Sunstate Environmental Services Inc $17.52M
- Kiewit-Turner a Joint Venture $16.60M
- Sempra Energy $5.83M
- Stantec Consulting Michigan Inc. $5.78M
- Texas Electrical & Testing Services LLC $4.32M
- American Material Handling, Inc. $3.68M
- Fortis Inc. $1.60M
- Timken Co $1.59M
Contracts ending in the next 12 months
18 contracts, $184.51M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| IBM17T0010 IGF::OT::IGF DESIGN FOR THE SUNLAND PARK LEVEE REPAIR | Arcadis U.S., Inc. | 2026-12-31 | $1.84M |
| 191BWC22F0070 ARCHITECT-ENGINEER SERVICES IDIQ- HYDRAULIC MODELING, SEDIMENT ACCUMULATION AND FLOW CAPACITY ANALYSIS | Stantec Consulting Services Inc. | 2026-12-31 | $1.62M |
| 191BWC24P0111 ---------- COMMENTS: THIS PR IS TO SECURE THE SERVICES OF A CONTRACTOR WITH THE KNOWLEDGE, SKILLS AND ABILITIES TO REPLACE AND UPGRADE DIFFUSERS IN TRAIN 1 AT THE NOGALES INTERNATIONAL WASTEWATER TREATMENT PLANT (NIWTP), AS WELL AS REPLACE AND INSTAL | Clean Infusion LLC | 2026-12-31 | $1.21M |
| 191BWC26P0033 GLYCERIN SUPPLY AND DELIVERY | Momar, Incorporated | 2027-01-08 | $3.43M |
| 191BWC26C0089 | Trojan Technologies Corp | 2027-01-28 | $1.43M |
| 191BWC25F0072 ---------- COMMENTS: THE BRIDGE ENGINEERING STUDY IS TO ASSESS THE FEASIBILITY AND COSTS ASSOCIATED WITH ALTERNATIVES TO PLACING A CRANE ON THE ANZALDUAS DAM EXISTING BRIDGE DECK. THE DIMENSIONS AND STRUCTURAL ELEMENTS OF THE BRIDGE DECK DO NOT ALLOW | Stantec Consulting Services Inc. | 2027-01-31 | $1.51M |
| 191BWC25P0090 SLUDGE TRANSPORT AS PER THE ATTACHED SCOPE OF WORK POP: 9/7/2025 TO 3/7/2028. QUANTITIES MAY INCREASE OR DECREASE, INVOICING SHOULD REFLECT THE EXACT QUANTITIES RECEIVED UPON RECEIPT. | Tatonka Trucking LLC. | 2027-03-07 | $7.07M |
| 191BWC25C0102 ---------- COMMENTS: THE USIBWC SEEKS SLUDGE DRYING/DEWATERING EFFORTS AT THE NIWTP THRU CURRENT OR INNOVATIVE TECHNOLOGY THAT WILL REDUCE THE VOLUME OF SLUDGE THAT IS PRODUCED AND TRANSPORTED TO LANDFILLS, PROVIDING UNATTENDED OPERATING CAPABILITIE | Sunstate Environmental Services Inc | 2027-03-27 | $17.52M |
| 191BWC26C0043 ---------- COMMENTS: THE SBIWTP IS A 25 MILLION GALLON PER DAY WASTEWATER TREATMENT PLANT THAT TREATS WASTEWATER ORIGINATING FROM TIJUANA, BAJA CALIFORNIA, MEXICO. THE TREATMENT SYSTEM INCLUDES AUXILIARY FACILITIES SUCH AS THE CANYON COLLECTION SYST | Veolia Water West Operating Services Inc | 2027-03-31 | $27.29M |
| 191BWC25C0088 AMISTAD RESERVOIR AND DAM REPLACEMENT OF PENSTOCK #5 | Texas Electrical & Testing Services LLC | 2027-03-31 | $2.59M |
Open notices
None open right now. Set an alert for the next one.
From USAspending.gov prime awards and SAM.gov notices. Sources and limits