Contracting office · 47PB51
PBS Project Delivery Capital Construction - Branch Northeast
Public Buildings Service · General Services Administration
At a glance
- 34 active contracts, $178.86M
- 19% of its 31 competed contracts drew a single offer (last 3 years)
- Usually buys through: Multiple-award IDIQ
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
Who it buys from, FY2025
Contracts ending in the next 12 months
8 contracts, $35.05M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| 47PC0325F0011 TMCH ELEVATOR MODERNIZATION CMA SERVICES CONTRACT. | AECOM Technical Services, Inc. | 2027-01-26 | $3.01M |
| 47PB5126C0009 AWARD OF THE ST. ELIZABETHS GATE 1 TEMPORARY GRAVEL PARKING LOT PROJECT AT THE ST. ELIZABETHS CAMPUS IN WASHINGTON, DC. | Vanar Eastern JV1, LLC | 2027-02-15 | $1.22M |
| 47PB5126F0011 FULL DESIGN OF THE 5TH & 6TH FLOOR RENOVATION AT UNION CENTER PLAZA IN WASHINGTON, D.C. | Alphatec P.C. | 2027-04-14 | $1.49M |
| 47PB5126F0019 JAVITS FEDERAL BUILDING 31ST FLOOR DEMO AND ABATEMENT DESIGN-BUILD SERVICES IN NY, NY. | Benchmark Construction Services Inc | 2027-04-22 | $4.97M |
| 47PB5126F0023 | AECOM Technical Services, Inc. | 2027-06-23 | $1.02M |
| 47PB5126F0012 AWARD OF THE ST. ELIZABETHS DINING HALL CONCESSIONS RENOVATIONS NATIONAL BRANDS PROJECT AT THE ST. ELIZABETHS CAMPUS IN WASHINGTON, DC. | Matos-Grunley Joint Venture | 2027-08-04 | $2.54M |
| 47PB5126F0014 AWARD FOR CONDENSER WATER PIPING REPLACEMENT, WILLIAM J. GREEN JR. FEDERAL BUILDING, PHILADELPHIA, PA | Patriot Construction, Inc. | 2027-08-31 | $5.47M |
| 47PB5126C0011 AWARD OF THE IRS MARTINSBURG ENTERPRISE COMPUTING CENTER (MECC) ROOF REPLACEMENT IN KEARNEYSVILLE, WEST VIRGINIA | Tri Coast-Pac Tech JV 2 | 2027-09-09 | $15.33M |
Open notices
- Design-Build Services for the Bridge of the Americas (BOTA) Land Port of Entry (LPOE) Modernization Project, El Paso, Texas · Solicitation · due 2026-10-15 · No Set aside used
- HST Roof Safety Construction Project · Sources Sought · due 2026-10-19
- Coburn Gore LPOE Art in Architecture Project · Combined Synopsis/Solicitation · due 2026-10-22 · Small Business Set Aside - Total
- Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus · Solicitation · due 2026-10-26
From USAspending.gov prime awards and SAM.gov notices. Sources and limits