Contracting office · 70Z050
FDCC Det Seattle(00050)
U.S. Coast Guard · Department of Homeland Security
At a glance
- 63 active contracts, $1.39B
- 11% of its 126 competed contracts drew a single offer (last 3 years)
- Usually buys through: Contract vehicle (IDV) itself
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
Who it buys from, FY2025
- Whiting-Turner Contracting Company, the $262.94M
- Gilbane Federal $24.25M
- Tutor Perini Corp $6.97M
- WSP E&Is - HDR Joint Venture $3.62M
- GWWH a Joint Venture $1.96M
- Transystems Corporation $1.55M
- AECOM Technical Services, Inc. $1.23M
- Price Modern LLC $387.2K
- Reid Middleton, Inc. $158.0K
- Duwamish-Pacific Joint Venture $129.0K
Contracts ending in the next 12 months
8 contracts, $212.33M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| 70Z05020FFRCKOD00 A&E SERVICES FOR DESIGN AND CONSTRUCTION FOR OPC/FRC HOMEPORT KODIAK, PROJECT NO. 7197998/7198748. | WSP USA Solutions Inc | 2026-12-06 | $2.54M |
| 70Z05021FOPCLA100 THE PURPOSE OF THIS TASK ORDER IS TO SUPPORT THE UNITED STATES COAST GUARD (USCG) THROUGH THE PROVISION OF DESIGN-BUILD CONSTRUCTION SERVICES FOR LALB OPC WATERFRONT CONSTRUCTION. | Gilbane Federal | 2026-12-31 | $37.25M |
| 70Z05022F43000013 THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE A/E DESIGN, AND DEVELOP OF CONSTRUCTION DOCUMENTS TO CONSTRUCT NEW COVERED MOORINGS, FLOATING DOCK, AND CORRECT SHORELINE EROSION AT THE USCG STATION, SIUSLAW RIVER IN FLORENCE, OR. | GFT Infrastructure, Inc. | 2026-12-31 | $2.51M |
| 70Z05026F43000003 THIS IS A REQUIREMENT FOR FACILITY ASSESSMENT ON A TRIENNIAL BASIS. TECHNICAL RESULTS ENTERED INTO BUILDER DATABASE TO IMPROVE RISK MANAGEMENT ACROSS BLDG PORTFOLIO. HELPS REAL-TIME EQUIPMENT INVENTORY + LIFE-CYCLE MANAGEMENT. | GFT Infrastructure, Inc. | 2027-02-15 | $7.85M |
| 70Z04724FPCNI0010 BASE HONOLULU WLB MOORING AND STRUCTURAL PIER UPGRADES HONOLULU, HI | Duwamish-Pacific Joint Venture | 2027-02-25 | $12.84M |
| 70Z05020FASTORA00 ARCHITECT/ENGINEER SERVICES PROVIDES ENVIRONMENTAL SERVICES FOR PREPARATION OF AN ENVIRONMENTAL ASSESSMENT INCLUDING SURVEYS AND PREPARATION OF REPORTS | Reid Middleton, Inc. | 2027-04-01 | $2.08M |
| 70Z05026F43000004 DESIGN AND BUILD A NEW WATER SUPPLY LINE BETWEEN THE CITY OF PETALUMA WATER DISTRIBUTION SYSTEM AND USCG TRACENS WATER PUMP STATION AT KING ROAD AND BODEGA AVE. | J. I. Garcia Construction, Inc. | 2027-07-17 | $16.00M |
| 70Z05023F43000012 DESIGN AND CONSTRUCTION KODIAK OPC FRC PHASE II | Gilbane Federal | 2027-09-09 | $131.26M |