Contracting office · 895033
Western-Sierra Nevada Region
Department of Energy
At a glance
- 94 active contracts, $51.99M
- 36% of its 231 competed contracts drew a single offer (last 3 years)
- Usually buys through: Standalone contract
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 541330 Engineering Services $5.36M
- 237130 Power and Communication Line and Related Structures Construction $889.6K
- 561730 Landscaping Services $837.4K
- 541611 Administrative Management and General Management Consulting Services $755.1K
- 334512 Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use $646.7K
- 332312 Fabricated Structural Metal Manufacturing $450.2K
- 561720 Janitorial Services $372.8K
- 541690 Other Scientific and Technical Consulting Services $249.9K
Who it buys from, FY2025
- Cherokee Nation $5.35M
- The Davey Tree Expert Company $1.23M
- Site Work Solutions $889.6K
- Miracorp, Inc D/B/A Miracorp - Vermont $810.4K
- Abm Facility Support Services, LLC $646.7K
- Meyer Utility Structures, LLC $450.2K
- Hankins Group Inc $409.1K
- Davey Resource Group, Inc. $408.0K
- Yolo Employment Services $334.2K
- Ati Government Solutions LLC $229.9K
Contracts ending in the next 12 months
8 contracts, $17.96M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| 89503324PWA000363 COTTONWOOD SECTION G CONTROL BUILDING PRE-MANUFACTURED METAL BUILDING STRUCTURE FOR WESTERN AREA POWER ADMINISTRATION'S (WAPA) SIERRA NEVADA REGION (SNR) | Crown Technical Systems | 2027-01-31 | $2.61M |
| 89503326CWA000055 WAPA REQUIREMENT FOR INSPECTION, MAINTENANCE, AND REPAIR SERVICES OF FACILITY EQUIPMENT FOR ALL SIERRA NEVADA REGION (SNR) SITES THROUGHOUT CALIFORNIA. | Spring Fountain Studios LLC | 2027-05-12 | $1.15M |
| 89503322FWA000053 FY22 ADMINISTRATIVE SUPPORT SERVICES | Miracorp Inc | 2027-06-30 | $3.89M |
| 89503325FWA400180 SIERRA NEVADA REGION (SNR) INTEGRATED VEGETATION MANAGEMENT UTILITY FORESTER SUPPORT SERVICES. BASE YEAR PLUS FOUR 1-YEAR OPTIONS | Davey Resource Group, Inc. | 2027-06-30 | $3.51M |
| 89503324FWA400172 THE WESTERN AREA POWER ADMINISTRATION (WAPA), SIERRA NEVADA REGION (SNR), REQUIRES A CONTRACTOR TO PERFORM HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) PREVENTATIVE MAINTENANCE (PM) AND REPAIR SERVICES AT VARIOUS LOCATIONS THROUGHOUT CALIFORNIA. | Abm Facility Support Services, LLC | 2027-09-30 | $2.36M |
| 89503323PWA000287 MAINTENANCE ACQUISITION SUPPORT SERVICES FOR SIERRA NEVADA REGION (SNR) | Genco Systems Inc | 2027-09-30 | $1.85M |
| 89503322PWA000250 CUSTODIAL CONTRACT FOR EMF WHSE, EMF SUB, AND SHOP BUILDING. FOLSOM | Yolo Employment Services | 2027-09-30 | $1.57M |
| 89503324FWA400164 WESTERN AREA POWER ADIMINISTRATION, SIERRA NEVADA REGION, ON-CALL CULTURAL RESOURCE SUPPORT SERVICES | Aspen Environmental Group | 2027-09-30 | $1.01M |
Open notices
- SOURCES SOUGHT – IDIQ Contract for Wood Utility Poles · Sources Sought · due 2026-10-07 · No Set aside used
- Y--COTP Series Capacitor Two-Phase Design Build · Solicitation · due 2026-10-30
From USAspending.gov prime awards and SAM.gov notices. Sources and limits