Contracting office · FA2523

Fa2523 Detachment 1, 21 Cons

Department of the Air Force · Department of Defense

At a glance

  • 16 active contracts, $25.77M
  • Usually buys through: Single-award IDIQ

Money by year

  • FY2023$73.73M
  • FY2024$51.62M
  • FY2025$85.39M
  • FY2026$72.32M

Obligations (money committed) in prime awards, from USAspending.gov.

Contracts ending in the next 12 months

6 contracts, $28.71M with options. The largest:

ContractIncumbentEndsValue with options
FA252325F0014
SURVEY THE ELECTRICAL, FUEL, WATER, FIRE WATER, HOT WATER, STEAM, AND SANITARY SEWER INFRASTRUCTURE AND DISTRIBUTION SYSTEMS ON THE ENTIRETY OF PITUFFIK SPACE BASE
Isc Radgivende Ingeniorer A/S2026-10-14$1.00M
FA252325C0002
REPAIR THE ARCTIC FOUNDATION OF B4002 AS INDICATED IN THE DRAWINGS AND INCIDENTAL RELATED WORK.
Per Aarsleff Gronland Aps2026-10-30$2.27M
FA252325C0003
REPAIR BY REPLACEMENT THE ROOF IN ITS ENTIRETY ON HANGAR 7, B623 (WWCX22-1008) AND HANGAR 8, B624 (WWCX22-1009) IN ACCORDANCE WITH WWCX22-1008-SPECIFICATIONS REV3 AND WWCX22-1009-SPECIFICATIONS REV3, RESPECTIVELY.
Per Aarsleff Gronland Aps2026-12-22$5.62M
FA252326F0002
THE PURPOSE OF PROJECT WWCX 26-1009 IS TO REPAIR THE SETTLEMENT AND FOUNDATION SINKING DUE TO PERMAFROST MELT AT BLDG 237, PITUFFIK SB, GREENLAND IN ACCORDANCE WITH THE SOW DATED 05 FEB 2026.
Inussuk A/S2026-12-31$1.69M
FA252325C0001
OCEAN CHARTER TRANSPORTATION BETWEEN DENMARK AND PITUFFIK SPACE BASE, GREENLAND. BASE PERIOD: 15 APRIL 2025 - 14 APRIL 2026OPTION 1: 15 APRIL 2026 - 14 APRIL 2027 OPTION 2: 15 APRIL 2027 - 14 APRIL 2028
Sealift Inc. of Delaware2027-04-14$16.98M
FA252325F0013
THE PURPOSE OF PROJECT WWCX 23-0001 IS TO REPAIR THE DELONG PIER BUBBLER SYSTEM AT PITUFFIK SPACE BASE IAW THE SOW DATED 28 FEBRUARY 2025.
Inussuk A/S2027-05-03$1.14M

All of them, with filters →

Open notices

None open right now. Set an alert for the next one.