Contracting office · FA8809
Fa8809 Sda and CMBT PWR Ssc/Szk-Ik
Department of the Air Force · Department of Defense
At a glance
- 44 active contracts, $468.38M
- 27% of its 45 competed contracts drew a single offer (last 3 years)
- Usually buys through: Single-award IDIQ
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (Except Nanotechnology and Biotechnology) $156.09M
- 336414 Guided Missile and Space Vehicle Manufacturing $22.09M
- 541712 Research and Development in the Physical, Engineering, and Life Sciences (Except Biotechnology) $9.36M
- 927110 Space Research and Technology $2.00M
Who it buys from, FY2025
- Science Applications International Corp $39.05M
- Impulse Space, Inc. $37.02M
- Tecolote Research, Inc. $29.95M
- Apex Technology, Inc. $22.00M
- Ai Solutions Inc $18.36M
- Aegis Aerospace Inc $9.36M
- Turion Space Corp $8.01M
- K2 Space Corporation $7.50M
- Optimum Technologies LLC $6.76M
- Scout Space Inc $3.63M
Contracts ending in the next 12 months
23 contracts, $364.04M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| FA880925CB003 COMPLETING THE FIRST MEGA CLASS SATELLITE BUS, DESIGNING AND BUILDING DAF PAYLOAD INTERFACES, INTEGRATING THOSE PAYLOADS ONTO THE BUS, LAUNCHING THE COMPLETED SATELLITE, AND OPERATING THE SATELLITE FOR A MINIMUM OF 1 YEAR AFTER LAUNCH | K2 Space Corporation | 2026-12-17 | $31.74M |
| FA864924P0372 DEVELOPING ARGONAUT, A REFUELLABLE, HIGH-DELTAV IN-SPACE TRANSPORT VEHICLE WITH A DUAL MODE PROPULSION SYSTEM USING WATER PROPELLANT. | Argo Space Corp | 2026-12-30 | $7.48M |
| FA880924CB003 APEX TECHNOLOGY INC ARIES BUS CAPABILITY FOR RAPIDLY ACCOMMODATING A SELECT SET OF SERB EXPERIMENT PAYLOADS AS DIRECTED BY SSC, ALONG WITH THE INTEGRATION AND FLIGHT QUALIFICATION OF A 6DOF PROPULSION SUBSYSTEM. | Apex Technology, Inc. | 2026-12-30 | $1.90M |
| FA880924FB007 PROVIDES THE RDSMO PMO WITH EDIS AND OTHER NECESSARY SUPPORT PRIMARILY FOR THE CUE AND COMM AND EC2-K ENCLAVES | Science Applications International Corporation | 2027-02-02 | $38.92M |
| FA880924FB004 TO MAINTAIN THE XPRO GROUND SYSTEMS BASELINE ARCHITECTURE TO ALLOW FOR THE GROWTH OF THE SYSTEM, ADDITION OF MISSIONS, AND GENERAL SUSTAINABILITY OF THE CURRENT INFRASTRUCTURE. | Science Applications International Corporation | 2027-02-02 | $16.89M |
| FA880924FB005 PROVIDES DEVELOPMENT AND SUSTAINMENT OF THE EC2-S GROUND SYSTEM LOCATED AT SSFB, AND TWO OPERATIONAL QZSS-HP PAYLOADS WILL DEMONSTRATE SPACE DOMAIN AWARENESS (SDA) OBSERVATIONS OF THE GEO BELT WHILE HOSTED ON TWO SEPARATE JAPANESE SPACE CRAFT. | Science Applications International Corporation | 2027-02-02 | $15.34M |
| FA880926FB002 ENGINEERING, DEVELOPMENT, INTEGRATION, AND SUSTAINMENT OF THE OLYMPIC JAVELIN GROUND SYSTEM, AND MAINTAIN ITS BASELINE ARCHITECTURE TO ALLOW FOR THE GROWTH, ADDITION OF MISSIONS, AND GENERAL SUSTAINABILITY OF THE CURRENT INFRASTRUCTURE. | Science Applications International Corporation | 2027-02-02 | $5.18M |
| FA881823F0039 NEBULA | Science Applications International Corporation | 2027-02-08 | $7.88M |
| FA880925CB008 THINKORBITAL TACFI | Thinkorbital Inc. | 2027-02-28 | $4.65M |
| FA880924FB001 SZ DIRECTORATE STRATEGIC CELL FOLLOW ON EFFORT | Tecolote Research, Inc. | 2027-03-31 | $11.61M |
Open notices
None open right now. Set an alert for the next one.
From USAspending.gov prime awards and SAM.gov notices. Sources and limits