Contracting office · FA8903
Fa8903 772 Ess PK
Department of the Air Force · Department of Defense
At a glance
- 405 active contracts, $2.53B
- 25% of its 935 competed contracts drew a single offer (last 3 years)
- Usually buys through: Contract vehicle (IDV) itself
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 236220 Commercial and Institutional Building Construction $478.43M
- 541330 Engineering Services $144.53M
- 562910 Remediation Services $113.31M
- 237120 Oil and Gas Pipeline and Related Structures Construction $74.49M
- 541611 Administrative Management and General Management Consulting Services $26.91M
- 237310 Highway, Street, and Bridge Construction $16.44M
- 337214 Office Furniture (Except Wood) Manufacturing $7.33M
- 236210 Industrial Building Construction $3.88M
Who it buys from, FY2025
- J. E. Dunn Construction Company $143.35M
- CMS Corporation $77.17M
- Gilbane Federal $57.98M
- Tutor Perini Corp $47.09M
- Contrack Ecc LLC $44.51M
- HDR, Inc $30.49M
- Jones Lang Lasalle Americas, Inc. $26.91M
- Insight Environmental Engineering & Construction, Inc. $24.56M
- AECOM $18.88M
- Chenega Reliable Services LLC $17.34M
Contracts ending in the next 12 months
144 contracts, $1.62B with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| FA890323F0107 REPAIR B271 3RD FLOOR FOR SPACE ACQUISITION MISSION, LOS ANGELES SFB, CA | Insight Environmental Engineering & Construction, Inc. | 2026-10-06 | $37.00M |
| FA890325F0208 THIS TASK ORDER (TO) DEFINES REQUIREMENTS FOR TITLE I A-E SERVICES TO PROVIDE A PLANNING CHARRETTE REPORT (PCR) AND DESIGN-BUILD (DB) CONCEPT DESIGN IN SUPPORT OF CONSTRUCT NUCLEAR DIGITAL ENGINEERING LABORATORY (NUDEL) AT KIRTLAND AFB, NM. | BKM Prime Ae SB JV, LLC | 2026-10-12 | $1.07M |
| FA890322F0034 ARCHITECT-ENGINEERING (A-E) PETROLEUM, OIL, AND LUBRICANTS (AE-POL) TO SUPPORT DESIGN OF MAJOR TANK REPAIRS AND ELECTRICAL DISTRIBUTION SYSTEMS AND GENERATOR STUDY AT DFSP TAMPA, FL AND DFSP CHARLESTON, SC. | Argus Consulting, Inc. | 2026-10-16 | $1.52M |
| FA890325F0101 THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED 25 OCTOBER 2024, BARRIER SYSTEM PROJECT AT RAF LAKENHEATH, UNITED KINGDOM, PROJECT NUMBERS: MSET 22-3003PA MSET 22-3003. | Perini Management Services, Inc. | 2026-10-18 | $49.11M |
| FA890324F0065 THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH STATEMENT OF WORK (SOW), DATED 7 MARCH 2024, FOR REPAIR RUNWAY 15C/33C AND OVERRUNS 15R/33L AT SHEPPARD AFB, TEXAS. | CMS Corporation | 2026-10-21 | $45.52M |
| FA890323F0127 REPAIR/RENOVATE STUDENT DORM BUILDING 10656 AT JBSA LACKLAND, TX PROJECT NO: MPLS100004 | CMS Corporation | 2026-10-25 | $17.54M |
| FA890325F0224 ISOLATION PIT #3 REPLACEMENT AT JOINT BASE CHARLESTON, SC | Goshawk, LLC | 2026-10-26 | $4.99M |
| FA890325F0004 CONSTRUCTION AND REPAIR OF FUELS FACILITIES AT ROBINS AFB, GA | Chenega Reliable Services LLC | 2026-10-28 | $3.35M |
| FA890321F0142 FACILITATE THE AFS RESPONSES UNDER CERCLA TO CHARACTERIZE ENVIRONMENTAL CONDITIONS AND DEFINE THE NATURE AND EXTENT OF CONTAMINATION. | Cape Environmental Management Inc | 2026-10-29 | $10.85M |
| FA890324C0033 REPAIR FUEL FACILITIES AT EARECKSON AS, ALASKA | Ahtna Marine & Construction Company, LLC | 2026-10-30 | $7.56M |
Open notices
- Request for Lease Proposal (RFLP) Enhanced Use Lease Project Nellis Air Force Base, NV. Amendment 3 · Solicitation · due 2026-10-08 · No Set aside used
- REQUEST FOR INFORMATION MINERAL PROCESSING LEASING OPPORTUNITIES · Sources Sought · due 2026-10-09 · No Set aside used
- Request for Lease Proposal (RFLP) Enhanced Use Leasing Project Davis-Monthan Air Force Base, AZ · Solicitation · due 2026-11-02 · No Set aside used
From USAspending.gov prime awards and SAM.gov notices. Sources and limits