Contracting office · N68335
Navair Warfare CTR Aircraft Div
Department of the Navy · Department of Defense
At a glance
- 1,360 active contracts, $3.59B
- 40% of its 3,106 competed contracts drew a single offer (last 3 years)
- Usually buys through: Standalone contract
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (Except Nanotechnology and Biotechnology) $517.94M
- 334519 Other Measuring and Controlling Device Manufacturing $145.64M
- 541330 Engineering Services $129.35M
- 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing $66.21M
- 336411 Aircraft Manufacturing $46.48M
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing $37.20M
- 334111 Electronic Computer Manufacturing $19.14M
- 332312 Fabricated Structural Metal Manufacturing $17.63M
Who it buys from, FY2025
- Lockheed Martin Corp $115.23M
- Bae Systems PLC $62.46M
- Sierra Nevada Company, LLC $50.72M
- General Atomics Aerotec Systems GMBH $45.99M
- Aviation Systems Engineering Company Inc $28.75M
- Shipcom Federal Solutions LLC $24.33M
- M.T.G. Services, Inc. $19.71M
- Northrop Grumman Corp $18.22M
- Standardaero Aviation Holdings, Inc. $17.67M
- R Cubed Engineering LLC $15.71M
Contracts ending in the next 12 months
401 contracts, $1.91B with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| N6833524C0294 SBIR PHASE III | Anduril Industries, Inc. | 2026-10-06 | $33.53M |
| N6833523C0162 SBIR PHASE II | Gird Systems Inc | 2026-10-07 | $1.78M |
| N6833523C0059 SBIR PHASE II | Photon Sciences, Incorporated | 2026-10-07 | $1.10M |
| N6833522C0159 SBIR PHASE II | Bascom Hunter Technologies, Inc. | 2026-10-09 | $4.39M |
| N6833524C0003 RESEARCH AND DEVELOPMENT | Mentis Sciences Inc | 2026-10-09 | $1.80M |
| N6833523C0230 SBIR PHII RESEARCH AND DEVELOPMENT | Bunker Supply Co LLC | 2026-10-09 | $1.09M |
| N6833525C0011 RESEARCH AND DEVELOPMENT | Snochip Inc | 2026-10-10 | $1.30M |
| N6833524C0235 IMPLEMENT SOFTWARE ARCHITECTURE-PHASE II | Tectus Corporation | 2026-10-13 | $1.99M |
| N6833526F1130 MQ-4C USN AND RAAF IDIQ UAS VARIOUS HYDRAULIC POWER SUPPLY UNITS | Hydraulics International, Inc. | 2026-10-13 | $1.79M |
| N6833523C0567 RESEARCH AND DEVELOPMENT | Nanosonic Inc. | 2026-10-13 | $1.30M |
Open notices
- Main Engine Cylinders · Sources Sought · due 2026-10-06 · No Set aside used
- Wire Rope · Sources Sought · due 2026-10-06 · No Set aside used
- F/A-18 Wiring System Repair Tool Set · Solicitation · due 2026-10-06 · Small Business Set Aside - Total
- Fiber Optic Test Adapters and Tools for E-2 Aircraft · Sources Sought · due 2026-10-07 · No Set aside used
- Cart Adapter · Solicitation · due 2026-10-08 · Small Business Set Aside - Total
- Corrosion Control Carts & Electric Hydraulic Power Supply FMS Japan & France · Presolicitation · due 2026-10-09 · No Set aside used
- Apparatus Assembly Purge · Presolicitation · due 2026-10-12 · No Set aside used
- Land Based Air Conditioner · Presolicitation · due 2026-10-12 · No Set aside used
From USAspending.gov prime awards and SAM.gov notices. Sources and limits