Contracting office · W91238
W075 Endist Sacramento
Department of the Army · Department of Defense
At a glance
- 347 active contracts, $2.02B
- 31% of its 576 competed contracts drew a single offer (last 3 years)
- Usually buys through: Standalone contract
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 236220 Commercial and Institutional Building Construction $266.73M
- 237990 Other Heavy and Civil Engineering Construction $195.60M
- 562910 Remediation Services $94.28M
- 541330 Engineering Services $59.77M
- 236210 Industrial Building Construction $14.44M
- 237110 Water and Sewer Line and Related Structures Construction $9.97M
- 541620 Environmental Consulting Services $9.91M
- 541370 Surveying and Mapping (Except Geophysical) Services $9.66M
Who it buys from, FY2025
- S. J. Amoroso Construction Co., LLC $166.98M
- Hhi Corporation $106.96M
- Far West Contractors Corp $37.99M
- Ahtna Global LLC $26.97M
- Sustainment & Restoration Services, LLC $18.20M
- HDR, Inc $16.21M
- Michels Construction, Inc. $15.42M
- The Aleut Corporation $15.23M
- SGJV, LLC $15.14M
- Nordic Industries Inc $13.94M
Contracts ending in the next 12 months
81 contracts, $1.36B with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| W9123821F0022 PROJECT TITLE AND LOCATION: REPLACE PUMP HOUSES 1 AND 2 AT AIR FORCE PLANT 42, PALMDALE, CA. | Burns & Mcdonnell Engineering Company, Inc. | 2026-10-15 | $3.52M |
| W9123825FA045 F-35 T-7A EAST CAMPUS INFRASTRUCTURE, HILL AFB DBB TO# 8 - FIRE SUPPRESSION WATER INFRASTRUCTURE | Hhi Corporation | 2026-10-15 | $1.52M |
| W9123825FA044 F-35 T-7A EAST CAMPUS INFRASTRUCTURE, HILL AFB TO#7 NATURAL GAS DISTRIBUTION PIPING SYSTEM | Hhi Corporation | 2026-10-15 | $1.05M |
| W9123823C0023 CONSTRUCTION OF A 7,292 SQUARE METER GROUND BASE STRATEGIC DEFENSE TECHNOLOGY AND COLLABORATION CENTER TO PROVIDE A MIX OF SECURE AND UNCLASSIFIED OFFICE, TECHNICAL, AND COLLABORATION AREAS SIZED TO ACCOMMODATE VARIOUS WORKGROUPS AND TEAMS. | M. A. Mortenson Company | 2026-10-16 | $78.46M |
| W9123818F0104 IGF::OT::IGF PROJECT TITLE AND LOCATION: FOLSOM DAM RAISE PROJECT, DIKES 7 AND 8 AND MORMON ISLAND AUXILIARY DAM (MIAD); COMPLETE 35% AND 65% DESIGN, WITH OPTION FOR 95% AND 100% DESIGN. | AECOM Technical Services, Inc. | 2026-10-22 | $7.75M |
| W9123823C0025 5MW GENERATION PLANT | Hsgs-Ameresco, LLC | 2026-10-27 | $32.76M |
| W9123825F0064 PROJECT TITLE AND LOCATION: FY26 MILCON, MC-130J HANGAR/AIRCRAFT MAINTENANCE UNIT (AMU), DAVIS-MONTHAN AFB, AZ. (100% DESIGN D-B-B) | HDR Engineering, Inc. | 2026-10-30 | $9.66M |
| W9123822F0011 CLIN 0001 FUNDING (PROGRAM YEAR 2021) | Burns & Mcdonnell Engineering Company, Inc. | 2026-10-31 | $6.04M |
| W9123822F0024 PROJECT TITLE AND LOCATION: T-7A DEPOT MAINTENANCE COMPLEX, PN KRSM183007, HILL AIR FORCE BASE, UT | Michael Baker International & Huitt-Zollars JV | 2026-10-31 | $3.83M |
| W9123824C0005 CONTAMINATED SOIL REMOVAL | Cabrera Services Inc | 2026-10-31 | $1.77M |
Open notices
- U.S. Government Space Required: Woodland, CA · Solicitation · due 2026-10-07
- USACE SPK MOTCO Facilities and Utilities Maintenance Services - Concord, California · Sources Sought · due 2026-10-08 · 8(a) Set-Aside (FAR 19.8)
- $625M USACE SPD Vertical AE Design MATOC · Solicitation · due 2026-10-13
- Fire Alarm and Mass Notification System Upgrades for DDJC, Tracy, CA · Solicitation · due 2026-10-13
- U.S. Government Space Required: Fairfield, CA · Solicitation · due 2026-10-15
- U.S. Government Space Required: American Canyon, CA · Solicitation · due 2026-10-15
- U.S. Government Space Required: Danville, CA · Solicitation · due 2026-10-15
- USACE SPK DBB Construction - LAR C3B South - Sacramento, CA · Presolicitation · due 2026-10-19 · Small Business Set Aside - Total
From USAspending.gov prime awards and SAM.gov notices. Sources and limits