Contracting office · W912WJ
W2SD Endist New England
Department of the Army · Department of Defense
W2SD Endist New England (contracting office W912WJ, Department of the Army) obligated $140.85M on contracts in FY2026 so far. It buys mostly remediation services, most from STV HDR Usma Joint Venture. It has 294 active contracts worth $824.92M. Of its 908 competed contracts in the last three years, 14% drew a single offer.
Key facts · data as of Nov 19, 2026
- Obligations, FY2026 so far
- $140.85M
- Active contracts
- 294, $824.92M
- Buys most
- Remediation Services
- Largest vendor
- STV HDR Usma Joint Venture ($26.93M)
- Competed contracts with one offer
- 14%
- Open notices now
- 8
Source: USAspending.gov prime contract awards (obligations: money committed, net of de-obligations) and SAM.gov notices, data as of Nov 19, 2026.
Cite this page: SpendQuery, W2SD Endist New England (W912WJ) federal contracts, data as of Nov 19, 2026, https://spendquery.com/office?code=W912WJ
W2SD ENDIST New England, a Department of Defense office, mostly buys remediation services, heavy and civil engineering construction, and engineering services. Its largest FY2026 vendors were STV HDR USMA Joint Venture, Mohawk Northeast Inc, and Sevenson Environmental Services, Inc. It usually buys through standalone contracts, and 14% of its 908 competed contracts over the last three years drew only one offer. (AI summary of the numbers on this page, checked against them; how)
At a glance
- 294 active contracts, $824.92M
- 14% of its 908 competed contracts drew a single offer (last 3 years)
- Usually buys through: Standalone contract
- Posts the follow-on notice a median 95 days before a contract ends (middle half: 305 to 27 days; 56 contracts)
- Gives a median 14 days to respond (492 solicitations, last 3 years)
- Amends 80% of its solicitations at least once
- A median 45 days from the first notice to the award notice (147 awards)
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
Who wins here
Some newcomers 12% of its 252 contracts since FY2025 went to a company's first win since 2023; 49% to companies with 5 wins or fewer.
- First win since 2023: 29
- 2nd–5th win: 95
- 6th–10th win: 42
- More than 10 wins: 86
A win = a contract or order of $10,000 or more; a company counts with its subsidiaries. Our contract data starts with FY2023, so “first” means first since 2023. Orders under someone's IDIQ, GWAC or BPA count toward a company's wins but not in the shares.
What it buys, FY2026
- 562910 Remediation Services $41.18M
- 237990 Other Heavy and Civil Engineering Construction $40.13M
- 541330 Engineering Services $30.84M
- 236220 Commercial and Institutional Building Construction $15.90M
- 237310 Highway, Street, and Bridge Construction $3.94M
- 541620 Environmental Consulting Services $1.70M
- 561730 Landscaping Services $1.58M
- 238910 Site Preparation Contractors $974.5K
Who it buys from, FY2026
- STV HDR Usma Joint Venture $26.93M
- Mohawk Northeast Inc $24.43M
- Sevenson Environmental Services, Inc. $19.42M
- Agate Construction Company, Inc. $10.62M
- Charter Contracting Company, LLC $8.34M
- Dobco Inc $5.88M
- Sargent Corporation $5.41M
- J & J Contractors, Inc. $4.04M
- Gilbane-Exyte a Joint Venture $2.74M
- Agm Marine Contractors Inc $2.58M
Contracts ending in the next 12 months
50 contracts, $664.27M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| W912WJ26FA003 PERFORMANCE WORK STATEMENT, DRAWINGS, AND SPECIFICATIONS | Burns & Mcdonnell Engineering Company, Inc. | 2026-11-25 | $1.51M |
| W912WJ20F0008 DEVELOPMENT OF A DESIGN-BUILD RFP, NC3 ACQUISITIONS MANAGEMENT FACILITY, HANSCOM AIR FORCE BASE, LINCOLN, MA | Burns & Mcdonnell Engineering Company, Inc. | 2026-11-30 | $2.20M |
| W912WJ19F0099 REMEDIAL INVESTIGATION, FEASIBILITY STUDY, PROPOSED PLAN AND DECISION DOCUMENT, FORMER CASWELL AIR FORCE STATION, CASWELL, ME | Credere Associates, LLC | 2026-12-02 | $1.24M |
| W912WJ25FA014 THE ARCHITECT-ENGINEER (A-E) SHALL ENGINEER, DESIGN, AND PREPARE COMPLETE DOCUMENTS TO CONSTRUCT A NEW F-35 FLIGHT SIMULATOR FACILITY AT THE BARNES AIR NATIONAL GUARD BASE (ANGB) IN WESTOVER, MA. | AECOM Technical Services, Inc. | 2026-12-04 | $4.33M |
| W912WJ24F0084 SMALL BUSINESS GENERAL DESIGN AE SERVICES, DEPARTMENT OF HOMELAND SECURITY BARNES BUILDING, BOSTON, MASSACHUSETTS | Saam Architecture LLC | 2026-12-17 | $2.77M |
| W912WJ25C0004 PAINTING AND STEEL REPAIRS TO THE RAILROAD BRIDGE, CAPE COD CANAL, BUZZARDS BAY, MA | Atlas Painting and Sheeting Corp. | 2026-12-27 | $19.69M |
| W912WJ23F0137 DRAFT FINAL CELL 1 REMOVAL, NEW BEDFORD HARBOR SUPERFUND SITE, NEW BEDFORD, MA | Jacobs Project Management Co. | 2026-12-30 | $33.20M |
| W912WJ25FA044 SEED TASK ORDER FOR REMEDIAL ACTION CONTRACT (RAC) FOR EXCAVATION OF WASTE CONTAMINATED SOILS AND SEDIMENTS AT THE RAYMARK SUPERFUND SITE IN STRATFORD, CT | Sevenson Environmental Services, Inc. | 2026-12-31 | $10.72M |
| W912WJ19F0110 HISTORIC DATA REVIEW, FIELD WORK PLAN PREP&EXECUTION, RI/FS, PROPOSED PLAN AND DECISION DOCUMENT TO SUPPORT SITE CLOSURE, FORMER NIKE CONTROL AREA PR-79, FOSTER, RHODE ISLAND | AECOM Technical Services, Inc. | 2026-12-31 | $3.12M |
| W912WJ26CA005 MAINTENANCE DREDGING, WAREHAM HARBOR, WAREHAM, MASSACHUSETTS | Agm Marine Contractors Inc | 2026-12-31 | $2.15M |
Open notices
- Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH · Sources Sought · due 2026-11-23
- Snow Removal Services, Blackwater Dam, Webster, NH · Solicitation · due 2026-11-24 · Small Business Set Aside - Total
- Construction Services for replacing the wire ropes and designated associated sheave blocks, Franklin, New Hampshire. · Sources Sought · due 2026-11-25
- ARMED FORCES CAREER CENTER - ENFIELD, CT · Presolicitation · due 2026-11-27
- East Bulkhead Replacement, East Boat Basin, Cape Cod Canal, Sandwich MA · Presolicitation · due 2026-12-01 · Small Business Set Aside - Total
- Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island. · Sources Sought · due 2026-12-03
- Thomaston Lake Dam, Gate House Roof Repairs, Thomaston, CT · Sources Sought · due 2026-12-11
- Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission Boundaries · Solicitation · due 2027-01-29
From USAspending.gov prime awards and SAM.gov notices. Sources and limits