Sole-source contracts over $100 million in 2025
Found 25 award(s) in FY2025. The largest is N0001923C0003 (LOCKHEED MARTIN CORPORATION, Department of Defense) with $21.56B.
| Award id | Actions | Obligations | Agency | Recipient | Award type | First action | Last action | Description |
|---|---|---|---|---|---|---|---|---|
| N0001923C0003 | 5 | $21.56B | Department of Defense | Lockheed Martin Corporation | Definitive Contract | 2024-12-20 | 2025-09-29 | This Modification Definitizes Lot 18 & 19 Aircraft Clins |
| N0002417C2100 | 100 | $9.34B | Department of Defense | Electric Boat Corporation | Definitive Contract | 2024-10-07 | 2025-09-30 | Equitable Adjustment |
| N0002417C2117 | 41 | $6.18B | Department of Defense | Electric Boat Corporation | Definitive Contract | 2024-10-08 | 2025-09-26 | FUNDING |
| W31P4Q24C0022 | 28 | $4.94B | Department of Defense | Lockheed Martin Corporation | Definitive Contract | 2024-11-19 | 2025-09-29 | "execute Phased Array Tracking Radar to Intercept on Target (Patriot) Advanced Capability-3 (Pac-3) Missile Production by Providing Incidental Services, Hardware, Facilities, Equipment, and Technical, Planning, Management, and Manufacturing Efforts." |
| N0001924C0039 | 20 | $3.13B | Department of Defense | Lockheed Martin Corporation | Definitive Contract | 2024-10-24 | 2025-09-25 | Provide Inc 10 Funding and Overrun Funding. |
| N0002424C2110 | 3 | $3.09B | Department of Defense | Electric Boat Corporation | Definitive Contract | 2024-10-08 | 2025-06-26 | SSN 814 Long Lead Time Material |
| FA868224CB001 | 10 | $2.92B | Department of Defense | Lockheed Martin Corporation | Definitive Contract | 2024-12-09 | 2025-09-25 | Joint Air-To-Surface Standoff Missile/Long Range Anti-Ship Missile - Large Lot Procurement |
| N0001923C0030 | 8 | $2.20B | Department of Defense | RTX Corporation | Definitive Contract | 2024-12-13 | 2025-09-24 | Addition of Clin 0003 Tooling Scope. |
| N0002416C2116 | 53 | $2.01B | Department of Defense | Huntington Ingalls Inc | Definitive Contract | 2024-10-01 | 2025-09-30 | CVN 80 & 81 Detailed Design & Construction Contract Modification to Award Headquarters Modification Request 2202.00, Updating Contract Data Requirements List A003 |
| W31P4Q24F0165 | 16 | $1.97B | Department of Defense | Lockheed Martin Corporation | Delivery Order | 2025-02-06 | 2025-09-29 | Guided Multiple Launch Rocket System Extended Range and Low Cost Reduced Range Practice Rocket (Lcrrpr) Fy25 Full Rate Production Lot 20 Delivery Order. |
| N0001925C0070 | 4 | $1.81B | Department of Defense | Lockheed Martin Corporation | Definitive Contract | 2024-11-22 | 2025-09-25 | F-35 Av Lot 20-22 Economic Order Quantity Award |
| N0001924C0009 | 3 | $1.80B | Department of Defense | Sikorsky Aircraft Corporation | Definitive Contract | 2025-02-20 | 2025-09-26 | Lot 9-13 Ch-53K Airframe Multiyear Definitization. |
| N0003024C0100 | 40 | $1.68B | Department of Defense | Lockheed Martin Corporation | Definitive Contract | 2024-11-13 | 2025-09-26 | Clin 0077 Funding |
| W58RGZ22C0010 | 27 | $1.62B | Department of Defense | Sikorsky Aircraft Corporation | Definitive Contract | 2024-10-23 | 2025-09-25 | Modification to Incorporate Engineering Change Proposal (Ecp) 709R2, Esh Obsolescence Replacement for Existing GE Aviation Esh Units With Abaco Systems Esh Due to Obsolescence of GE Component, and Incorporate No Cost Ecps Av-13559 and Av-13560. |
| FA862524F3034 | 3 | $1.52B | Department of Defense | Lockheed Martin Corp | Delivery Order | 2025-01-15 | 2025-07-31 | Fy23 C-130J Congressional Add Aircraft |
| FA863423F0048 | 5 | $1.50B | Department of Defense | The Boeing Company | Delivery Order | 2024-10-04 | 2025-03-11 | F-15Ex Lot 5 & 6 GFP Attachment Update |
| N0001921C0011 | 16 | $1.38B | Department of Defense | RTX Corporation | Definitive Contract | 2024-10-07 | 2025-09-30 | The Purpose of This No-Cost Modification Is Deobligate and Reobligate Funding for Fy25 Don Slins to Realign Loas to Occ 257 From Occ 260. Expenditures From Acrn JG Are Realigned to Acrn LK, Acrn JH to Acrn LL, and Acrn JJ to Acrn LM. |
| N0001924C0032 | 11 | $1.30B | Department of Defense | Raytheon Company | Definitive Contract | 2025-01-08 | 2025-09-26 | This Modification Is for the Undefinitized Contract Action for Second Source Energetics. |
| FA821920C0006 | 9 | $1.27B | Department of Defense | Northrop Grumman Systems Corp | Definitive Contract | 2024-10-30 | 2025-09-30 | Ground-Based Strategic Deterrent (GBSD) Engineering and Manufacturing Development (Emd) and Early Production and Deployment (P D) |
| FA865925CB003 | 6 | $1.27B | Department of Defense | Raytheon Company | Definitive Contract | 2025-07-31 | 2025-09-30 | Advanced Medium Range Air-To-Air Missile (Amraam)lots 39-40 |
| FA880219C0001 | 27 | $1.23B | Department of Defense | The Aerospace Corporation | Definitive Contract | 2024-10-30 | 2025-09-22 | Engineering Services |
| HQ085124C0001 | 35 | $1.11B | Department of Defense | Raytheon Company | Definitive Contract | 2024-10-08 | 2025-08-04 | Fy23 SM-3 Block Iia Aurs - US |
| N0002424C2115 | 3 | $1.10B | Department of Defense | Bechtel Plant Machinery, Inc. | Definitive Contract | 2024-12-02 | 2025-09-03 | Funding Mod |
| FA812425F0001 | 18 | $1.08B | Department of Defense | RTX Corporation | Delivery Order | 2024-10-04 | 2025-09-10 | F117 Ess Fy25 Task Order Modification to Deobligate Quantities and Funds Due to Lower Than Anticipated Forecast for Fy25 and Fund Emergency Services Claim for Esn 170852. |
| W912CH25F0096 | 4 | $1.07B | Department of Defense | Bae Systems Land & Armaments L.P. | Delivery Order | 2024-12-11 | 2025-09-30 | The Bradley A4 Follow-On Production Effort Will Deliver M2A4 and M7A4 Vehicles From Various Inducted Legacy Source Variants Based on the TDP Developed Under Contract W56Hzv-12-C-0358 Bradley A4 Ecp and the Top-Level Vehicle Drawings. |
Open the full answer with chart and filters →
How to read this
- Amounts are obligations (money committed), not outlays (money paid).
- Amounts are the award's obligations within the selected years, not its lifetime value.