Small Business Innovation Research · Small Business Technology Transfer
Creare LLC: SBIR & STTR awards
74 awards worth $22.34M to 1 companies since 1983 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Creare LLC's federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2025 | 0 | 1 | $1.15M |
| 2024 | 1 | 0 | $200.0K |
| 2023 | 2 | 0 | $399.9K |
| 2022 | 1 | 0 | $250.0K |
| 2021 | 2 | 1 | $1.02M |
| 2020 | 2 | 0 | $449.6K |
| 2019 | 0 | 1 | $1000.0K |
| 2018 | 1 | 0 | $150.0K |
| 2017 | 1 | 2 | $2.15M |
| 2016 | 2 | 2 | $2.30M |
| 2015 | 1 | 1 | $1.15M |
| 2014 | 1 | 1 | $1.65M |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| Low-Cost Closed-Loop Cryogenic Cooler for High Power Optics · topic C57-07a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $1.15M | 2025-04-14 |
| Low-Cost Closed-Loop Cryogenic Cooler for High Power Optics · topic C57-07a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $200.0K | 2024-02-12 |
| Crack Prevention and Mitigation for New and In-Service Dry Storage Canisters · topic C56-41b | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $200.0K | 2023-07-10 |
| Control of Grain Properties and Slug Geometry for High-Performance Metallic Fuel · topic C56-40v | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $199.9K | 2023-07-10 |
| Advanced, Real-Time, Hydrogen and Hydrogen-Natural Gas Blend Fuel Composition Sensor Topic 21a · topic C54-21a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $250.0K | 2022-06-27 |
| Topic 27c - Inline Monitoring of Hydrogen Blends and Automated Pipe Leakage Detection · topic 27c | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $249.9K | 2021-06-28 |
| High-Efficiency, Low-Cost, Additive-Manufactured Air Contactor · topic P | Creare LLC · New Hampshire | Department of Energy · ARPA-E | STTR Phase II | $571.8K | 2021-04-05 |
| High-Efficiency, Low-Cost, Additive-Manufactured Air Contactor · topic P | Creare LLC · New Hampshire | Department of Energy · ARPA-E | STTR Phase I | $198.0K | 2021-04-05 |
| Wireless Temperature Sensor for Rotating Turbine Blades · topic 19b | Creare LLC · New Hampshire | Department of Energy | STTR Phase I | $249.9K | 2020-06-29 |
| Topic 36c - Advanced Dilution Refrigerator Technologies for QIS Systems · topic 36c | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $199.7K | 2020-06-29 |
| Crack Mitigation for Dry Storage Canisters · topic 31a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $1000.0K | 2019-08-19 |
| Crack Mitigation for Dry Storage Canisters · topic 31a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $150.0K | 2018-07-02 |
| Electrostatic Precipitation System for Radionuclide Particle Collection · topic 04a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $1000.0K | 2017-07-31 |
| Manufacture of Metallic Fuel Pins With Advanced Geometries · topic 30b | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $999.9K | 2017-07-31 |
| Topic 16a - Low-Cost Desalination System Driven by Hydrokinetic Power · topic 16a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $150.0K | 2017-06-12 |
| Continuous Casting of Metallic Nuclear Fuel Pins · topic 19b | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $999.9K | 2016-08-01 |
| Power Dense Converter Electronics for Grid Tie Energy Storage Containers · topic 10a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $999.8K | 2016-08-01 |
| Electrostatic Precipitation System for Radionuclide Particle Collection · topic 04 | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $150.0K | 2016-06-13 |
| Manufacture of Metallic Fuel Pins with Advanced Geometries · topic 30 | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $149.9K | 2016-06-13 |
| Power Dense Converter Electronics for Grid Tie Energy Storage Containers · topic 10a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $149.9K | 2015-06-08 |
| Advanced Compression System for Radionuclide Monitoring · topic 26b | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $999.9K | 2015-04-06 |
| Continuous Casting of Metallic Nuclear Fuel Pins · topic 19b | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $1.50M | 2014-07-28 |
| Gas-Bearing Centrifugal Compression System for Radionuclide Monitoring · topic 26c | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $149.9K | 2014-02-18 |
| Improved Continuous Casting Process for Metallic Fuel Pins · topic 19b | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $224.9K | 2013-06-10 |
| Efficient and Robust Gerotor Compression System for CO2 Capture · topic 16c | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $150.0K | 2013-06-10 |
| Thermoelectric Systems for High-Efficiency, Low-Cost Vehicle Waste Heat Recovery · topic 06f | Creare LLC · New Hampshire | Department of Energy | STTR Phase I | $150.0K | 2012-11-15 |
| A Low-Cost, Environmentally Friendly Thermal Storage for CO2 Sequestration · topic 15 c | Creare LLC · New Hampshire | Department of Energy | STTR Phase I | $150.0K | 2012-06-28 |
| Gas Bearing Centrifugal Compressor System for Radioxenon Monitoring · topic 55 a | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $149.9K | 2011-06-17 |
| A Wide Temperature Range, Reliable, Compact Cryogenic Thermal Switch · topic 55 e | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $149.9K | 2011-06-17 |
| A Robust High Speed Switch for Pulsed Power Applications · topic 65 e | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $99.9K | 2010 |
| Low-Cost, Durable Water Vapor Transport Exchanger · topic 01 b | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $99.9K | 2010 |
| A Magneto-Hydrodynamic System for Generating High-Pressure Impluses in Spallation Targets | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $749.4K | 2009 |
| A Magneto-Hydrodynamic System for Generating High-Pressure Impluses in Spallation Targets · topic 02 c | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $99.9K | 2008 |
| Not Available | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $749.6K | 1999 |
| Refractory Metal Wicks for Extended Lifetime in AMTEC Power Systems | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $75.0K | 1998 |
| Secure, Data Intensive Collaborative Infrastructure for Multi-Site Coordinated Real-Time and Archived Data Analysis | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $74.8K | 1998 |
| Recovery and Recycle of Xenon Isotopes for High Resolution MRI and SPECT | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $74.8K | 1998 |
| A High Efficiency Dynamic Isotope Power Conversion System | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $74.6K | 1995 |
| A Semiconductor Oxygen Sensor for Hybrid Electric Vehicle Control | Creare LLC · New Hampshire | Department of Energy | SBIR Phase I | $74.4K | 1995 |
| HELIUM-COOLED DIVERTORS WITH LOW ACTIVATION MATERIALS AND SIMPLE FABRICATION TECHNIQUES | Creare LLC · New Hampshire | Department of Energy | SBIR Phase II | $599.9K | 1994 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.