Small Business Innovation Research · Small Business Technology Transfer
Altex Technologies Corporation: SBIR & STTR awards
38 awards worth $13.84M to 1 companies since 1988 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Altex Technologies Corporation's federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2024 | 1 | 1 | $1.35M |
| 2023 | 1 | 1 | $1.35M |
| 2022 | 2 | 0 | $400.0K |
| 2020 | 2 | 1 | $1.20M |
| 2019 | 1 | 1 | $1.30M |
| 2018 | 1 | 0 | $150.0K |
| 2017 | 0 | 1 | $998.2K |
| 2016 | 2 | 1 | $1.30M |
| 2015 | 1 | 0 | $150.0K |
| 2014 | 0 | 1 | $999.7K |
| 2013 | 2 | 0 | $299.5K |
| 2011 | 1 | 0 | $149.7K |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| DOE Ph I DE-SC0023831, DOE FOA DE-FOA-0003279, DOE Topic C56-18b, "Compact and Low-Cost Thermal Management for Heavy-Duty Vehicle Fuel Cells" · topic C56-18b | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $1.15M | 2024-09-10 |
| Battery Grade Graphite Production from Biomass · topic C58-13a | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $200.0K | 2024-07-22 |
| DOE DE-FOA-0002903, DOE Topic C56-18b, "Compact and Low-Cost Thermal Management for Heavy-Duty Vehicle Fuel Cells" · topic C56-18b | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $200.0K | 2023-07-10 |
| DOE Phase I DE-SC0022445, FOA DE-FOA-0002859, DOE Topic 21f, "Enhanced Biochar for Soil Reclamation Co-Produced by a Drop-In Biofuels Process" · topic C53-21f | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $1.15M | 2023-04-03 |
| DE-FOA-0002555, DOE Topic 8a, "Low-Cost Environment-Friendly Critical Materials Recovery from Produced Water" · topic C54-08a | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $200.0K | 2022-06-27 |
| DE-FOA-0002554, DOE Topic 21f, "Enhanced Biochar for Soil Reclamation Co-Produced by a Drop-In Biofuels Process" · topic C53-21f | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $200.0K | 2022-02-14 |
| Low Cost Feed Flexible Plastics Reuse (LCFFPR) · topic K | Altex Technologies Corporation · California | Department of Energy · ARPA-E | SBIR Phase II | $860.4K | 2021-01-11 |
| Low Cost Feed Flexible Plastics Reuse (LCFFPR) · topic K | Altex Technologies Corporation · California | Department of Energy · ARPA-E | SBIR Phase I | $139.6K | 2021-01-11 |
| High Resiliency, Efficient Heat, Cooling and Power System · topic 08c | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $199.9K | 2020-06-29 |
| Process Intensification for Carbon Capture · topic 20g | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $1.10M | 2019-08-19 |
| Advanced Low Cost Air Handling Units for Buildings · topic 09a | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $200.0K | 2019-07-01 |
| Advanced Dry Cooler for sCO2 Power Systems · topic 30f | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $150.0K | 2018-07-02 |
| Corrosion and Erosion Resistant Surface Features for High Pressure Supercritical Carbon Dioxide Heat Exchangers · topic 14d | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $998.2K | 2017-04-10 |
| Process Intensification for Carbon Capture · topic 20g | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $1000.0K | 2016-08-01 |
| Innovative Feeding System (IFS) for Biomass · topic 10 | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $150.0K | 2016-06-13 |
| Advanced Fossil Energy Technology Research, Subtopic d – "Corrosion and Erosion Resistant Surface Features for High Pressure Supercritical Carbon Dioxide Heat Exchangers" · topic 14d | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $150.0K | 2016-03-01 |
| Process Intensifcation for Carbon Capture · topic 20g | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $150.0K | 2015-06-08 |
| Advanced Low Cost and Compact Utility Dry Cooling System · topic 12d | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $999.7K | 2014-04-08 |
| Solids Handling System for Biomass Conversion · topic 03b | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $149.9K | 2013-06-10 |
| Advanced Low Cost and Compact Utility Dry Cooling System · topic 12 d | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $149.6K | 2013-02-19 |
| Infrastructure Compatible Biofuel Production System for Lignocellulosic Biomass (ICBPSLB) · topic 02 e | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $149.7K | 2011-06-17 |
| Biomass Blending Densification System | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $749.9K | 2009 |
| Low Cost Microchannel Heat Exchangers · topic 11 | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $750.0K | 2008 |
| Biomass Blending Densification System · topic 26 a | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $99.5K | 2008 |
| Low Cost Microchannel Heat Exchangers · topic 11 | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $100.0K | 2007 |
| Efficient Dewatering System for Biomass · topic 09 | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $92.0K | 2007 |
| Compact Heat Exchanger for Micro-Turbine-Based Cooling, Heating, and Power · topic 38 | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $99.8K | 2004 |
| Reactive Separation via a Hydrothermally Stable Hydrogen Selective Membrane | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $100.0K | 2001 |
| Not Available | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $712.1K | 2000 |
| Not Available | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $0 | 2000 |
| Power from Farm Animals System Technology | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $100.0K | 1999 |
| Low Cost Reactive Barrier for Sites Contaminated with Radionuclides and Heavy Metals | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $75.0K | 1998 |
| RECONSTITUTION OF BENEFICIATED COAL USING THE BIOBINDER PROCESS | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $599.4K | 1994 |
| RECONSTITUTION OF BENEFICIATED COAL USING THE BIOBINDER PROCESS | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $73.5K | 1993 |
| A CO-FIRED COAL/SLUDGE INCINERATOR | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $50.0K | 1992 |
| A COAL-FIRED INTEGRATED EMISSIONS CONTROL COMBUSTOR | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $50.0K | 1992 |
| A FEASIBILITY STUDY OF A PULSE COMBUSTOR SORBENT TREATMENT AND INJECTION TECHNIQUE FOR SULFUR DIOXIDE CONTROL | Altex Technologies Corporation · California | Department of Energy | SBIR Phase II | $492.9K | 1989 |
| A FEASIBILITY STUDY OF A PULSE COMBUSTOR SORBENT TREATMENT AND INJECTION TECHNIQUE FOR SULFUR DIOXIDE CONTROL | Altex Technologies Corporation · California | Department of Energy | SBIR Phase I | $50.0K | 1988 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.