Small Business Innovation Research · Small Business Technology Transfer
Busek Co., Inc.: SBIR & STTR awards
12 awards worth $3.45M to 1 companies since 1988 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Busek Co., Inc.'s federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2011 | 0 | 1 | $999.6K |
| 2010 | 1 | 0 | $100.0K |
| 2002 | 1 | 0 | $99.6K |
| 1992 | 0 | 2 | $999.1K |
| 1991 | 3 | 0 | $149.4K |
| 1990 | 0 | 1 | $499.7K |
| 1989 | 1 | 1 | $547.9K |
| 1988 | 1 | 0 | $50.0K |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| High Current Negative Hydrogen Ion Source · topic 15 b | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase II | $999.6K | 2011-08-15 |
| High Current Negative Hydrogen Ion Source · topic 15 b | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase I | $100.0K | 2010 |
| Silicon Carbide High Temperature Dynamic Pressure Gauge | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase I | $99.6K | 2002 |
| CERAMIC/METAL ELEMENTS FOR MHD SIDEWALLS | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase II | $500.0K | 1992 |
| AN ELECTRICAL ISOLATOR FOR WATER COOLED HIGH VOLTAGE SYSTEMS | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase II | $499.1K | 1992 |
| CERAMIC/METAL ELEMENTS FOR MHD SIDEWALLS | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase I | $50.0K | 1991 |
| AN ELECTRICAL ISOLATOR FOR WATER COOLED HIGH VOLTAGE SYSTEMS | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase I | $49.9K | 1991 |
| PLASMATRON IGNITION OF PULVERIZED COAL FOR UTILITY BOILERS | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase I | $49.6K | 1991 |
| AN INTERANODE FAULT PROTECTION DEVICE FOR MAGNETOHYDRODYNAMIC CHANNELS | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase II | $499.7K | 1990 |
| A PLASMATRON COAL-WATER SLURRY COMBUSTOR FOR RESIDENTIAL AND SMALL INDUSTRIAL APPLICATIONS | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase II | $497.9K | 1989 |
| AN INTERANODE FAULT PROTECTION DEVICE FOR MAGNETOHYDRODYNAMIC CHANNELS | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase I | $50.0K | 1989 |
| A PLASMATRON COAL-WATER SLURRY COMBUSTOR FOR RESIDENTIAL AND SMALL INDUSTRIAL APPLICATIONS | Busek Co., Inc. · Massachusetts | Department of Energy | SBIR Phase I | $50.0K | 1988 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.