Small Business Innovation Research · Small Business Technology Transfer
Euclid Beamlabs LLC: SBIR & STTR awards
26 awards worth $9.37M to 1 companies since 2015 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Euclid Beamlabs LLC's federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2025 | 1 | 0 | $206.5K |
| 2023 | 1 | 0 | $206.5K |
| 2021 | 5 | 3 | $4.40M |
| 2020 | 5 | 1 | $2.11M |
| 2019 | 5 | 1 | $1.86M |
| 2018 | 1 | 0 | $149.9K |
| 2016 | 1 | 0 | $149.9K |
| 2015 | 2 | 0 | $300.0K |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| Diamond Neutron Monochromator · topic C59-07b | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $206.5K | 2025-02-18 |
| Non-radioisotopic gamma-ray calibration source for radiation detection instruments · topic C56-02a | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $206.5K | 2023-07-10 |
| Radiation Tolerant Diamond Gain Structures for Photon Detection · topic 37a | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $206.5K | 2021-06-28 |
| A Novel Multipactor Free and Deflecting Force Reduced Dielectric Accelerator X-ray Source for Ir-192 Replacement · topic 02a | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $200.0K | 2021-06-28 |
| Integrated high efficiency bunch shaping techniques for SWFA · topic 32c | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $199.9K | 2021-06-28 |
| AN SRF PHOTOCATHODE GUN FOR MEV ULTRAFAST ELECTRON MICROSCOPY · topic 11b | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase II | $1.10M | 2021-06-17 |
| HPHT System for Near Dislocation Free Diamond Elements for X-Ray Optics · topic 12a | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase II | $1.15M | 2021-05-03 |
| Epitaxial Alkali Antimonide Photocathode Growth and Characterization · topic 09a | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase II | $1.15M | 2021-05-03 |
| Ultra-low vibration closed-cycle cryostat for X-ray applications · topic 10a | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $198.1K | 2021-02-22 |
| Diamond Mott Polarimeter · topic 37d | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $191.1K | 2021-02-22 |
| Development of Dielectric Disk Accelerators For Argonne 500MeV Short Pulse Two Beam Wakefield Accelerator Demonstrator · topic 26h | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase II | $1.10M | 2020-08-24 |
| Development of Cryogenic Dark Matter Diamond Detector · topic 34h | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $206.4K | 2020-06-29 |
| Balloon Cavity with Increased Q Factor · topic 33c | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $198.1K | 2020-06-29 |
| HPHT System for Near Dislocation Free Diamond Elements for X-Ray Optics · topic 12a | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $206.5K | 2020-02-18 |
| Epitaxial Alkali Antimonide Photocathode Growth and Characterization · topic 09a | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $199.9K | 2020-02-18 |
| A Novel Approach to Production of Highly Spin Polarized Electrons from III-V Semiconductor/Half-Metal Hybrid Multilayers · topic 33c | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $199.8K | 2020-02-18 |
| Topic: 31d Title: 3D Diamond Detector for High-Rate Charged Particle Tracking · topic 31d | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $206.4K | 2019-07-01 |
| Development of Dielectric Disk Accelerators For Argonne 500MeV Short Pulse Two Beam Wakefield Accelerator Demonstrator · topic 26h | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $199.9K | 2019-07-01 |
| An SRF Photocathode Gun for MeV Ultrafast Electron Microscopy · topic 11b | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase II | $999.8K | 2019-05-28 |
| Nanostructured GaAs Photocathodes for Light Trapping and Ion Damage Tolerance · topic 30d | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $149.9K | 2019-02-19 |
| "Black Gun" Technologies for DC Photoinjectors · topic 30c | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $149.9K | 2019-02-19 |
| A Method for ¿in Situ¿ Measurements of the Unloaded High-Quality Factor of an SRF Resonator Installed at a Cryomodule · topic 30b | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $149.5K | 2019-02-19 |
| A SRF Photogun for MeV Ultrafast Electron Microscopy · topic 11b | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $149.9K | 2018-04-09 |
| High Average Current Bunched Electron Source for RF Accelerators · topic 24 | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $149.9K | 2016-06-13 |
| Ultracompact RF Accelerator for Non-Destructive Examination · topic 32e | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $150.0K | 2015-06-08 |
| Active S-Band Pulse Compressor · topic 27a | Euclid Beamlabs LLC · Maryland | Department of Energy | SBIR Phase I | $150.0K | 2015-06-08 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.