Small Business Innovation Research · Small Business Technology Transfer

Foster-Miller, Inc.: SBIR & STTR awards

31 awards worth $4.88M to 1 companies since 1983 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).

Foster-Miller, Inc.'s federal contracts and grants · All SBIR & STTR awards

Clear

Awards by year

YearPhase IPhase IIAmount
200410$99.9K
200310$100.0K
200230$299.6K
200121$800.0K
200020$200.0K
199830$224.9K
199720$150.0K
199301$500.0K
199210$50.0K
199111$549.3K
199021$599.4K
198910$50.0K

The latest year fills in over months: agencies report awards to SBIR.gov with a lag.

Latest matching awards

AwardCompanyAgencyPhaseAmountDate
Low-Cost, Environmentally Benign, High Specific Power Manganese Dioxide-Carbon Pseudocapacitors for Hybrid Vehicles · topic 31Foster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$99.9K2004
Efficient Incandescent Visible Light Produced by Improved Boride and Nitride Filament RadiationFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$100.0K2003
Development of an Economical Process for the High Yield Production of CellulaseFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$99.9K2002
Internal Pipe Repair SystemFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$99.9K2002
Novel High Temperature Polymer Substrate for Low Cost High Efficiency Thin Film CIGS Solar CellsFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$99.7K2002
Efficient Selective Emitter Based Incandescent LampsFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase II$700.0K2001
Developing Desiccant Coatings for the Elastomer Bed for Optimal Enthalpy Exchange VentilationFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$100.0K2001
Efficient Selective Emitter Based Incandescent LampsFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$02001
Not AvailableFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$100.0K2000
Not AvailableFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$100.0K2000
Improved High Temperature Polymer Electrolytes for Proton Exchange Membrane (PEM) Fuel CellsFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$75.0K1998
Optimized Wind-Generator and Pump-Motor ControllerFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$75.0K1998
Variable Speed Ice Making System for Wind Generated PowerFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$75.0K1998
Enhanced Flaw Detection by Time-Reversal Auto-Focusing of an Ultrasonic ArrayFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$75.0K1997
Net Shape Gradient W-Cu Plasma Facing Components by Pressure InfiltrationFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$75.0K1997
A STEAM GENERATOR UPPER BUNDLE INTERTUBE INSPECTION AND MAINTENANCE ROBOTFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase II$500.0K1993
A STEAM GENERATOR UPPER BUNDLE INTERTUBE INSPECTION AND MAINTENANCE ROBOTFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$50.0K1992
ROBOTIC INSTALLATION OF PWR STEAM GENERATOR NOZZLE DAMSFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase II$499.3K1991
A REMOTE STEAM GENERATOR GIRTH-WELD INSPECTION AND REPAIR SYSTEMFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$50.0K1991
REMOTE EXTERIOR INSPECTION OF A REACTOR PRESSURE VESSELFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase II$499.9K1990
DEVELOPMENT OF LOW-COST CERM PROCESS TO PRODUCE COMPOSITE SANDWICH PANELSFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$50.0K1990
ROBOTIC INSTALLATION OF PWR STEAM GENERATOR NOZZLE DAMSFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$49.5K1990
REMOTE EXTERIOR INSPECTION OF A REACTOR PRESSURE VESSELFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$50.0K1989
ENHANCED THERMAL RADIATION MECHANICAL JOINTSFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$50.0K1987
MEMBRANE APPLICATIONS FOR GAS CLEANUP AND GAS SEPARATION HAVE BEEN LIMITED BECAUSE OF THEIR LOW FLUX, THE CHEMICAL RESISTANCE OF CURRENT MATERIALS, AND BECAUSE OF THEIR HIGH TEMPERATURE LIMITS.Foster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$50.0K1986
RADWASTE DISPOSAL DRUM CENTRIFUGEFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase II$497.7K1985
MONOCONE ROCK BIT WITH JETS AT THE TEETH: DESIGN AND TESTFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase II$466.9K1985
ENERGY APPLICATIONSFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$49.2K1985
MONOCONE ROCK BIT WITH JETS AT THE TEETH: DESIGN AND TESTFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$50.0K1984
RADWASTE DISPOSAL DRUM CENTRIFUGEFoster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$50.0K1984
REDUCING THE ASH AND SULFUR CONTENT OF COAL TO LEVELS COMPARABLE WITH OIL WILL GREATLY INCREASE COAL'S ACCEPTANCE AS A COMBUSTION FUEL.Foster-Miller, Inc. · MassachusettsDepartment of EnergySBIR Phase I$45.0K1983

Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.