Small Business Innovation Research · Small Business Technology Transfer
Protection Engineering Consultants LLC: SBIR & STTR awards
7 awards worth $1.60M to 1 companies since 2017 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Protection Engineering Consultants LLC's federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2025 | 0 | 1 | $300.0K |
| 2024 | 1 | 1 | $449.8K |
| 2023 | 1 | 0 | $149.9K |
| 2020 | 0 | 1 | $259.8K |
| 2018 | 0 | 1 | $294.5K |
| 2017 | 1 | 0 | $149.9K |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| Risk Alleviation via Detection of Information Anomalies in Network Cybersecurity Events (RADIANCE) · topic 24-FT2 | Protection Engineering Consultants LLC · Texas | Department of Transportation | SBIR Phase II | $300.0K | 2025-09-29 |
| Risk Alleviation via Detection of Information Anomalies in Network Cybersecurity Events (RADIANCE) · topic 24-FT2 | Protection Engineering Consultants LLC · Texas | Department of Transportation | SBIR Phase I | $149.9K | 2024-08-26 |
| Novel Design for Passenger Railcar Retention Systems · topic 23-FR2 | Protection Engineering Consultants LLC · Texas | Department of Transportation | SBIR Phase II | $299.9K | 2024-07-22 |
| Novel Design for Passenger Railcar Retention Systems · topic 23-FR2 | Protection Engineering Consultants LLC · Texas | Department of Transportation | SBIR Phase I | $149.9K | 2023-07-11 |
| Resilient Wayside Structures to Reduce Severity of Passenger Equipment Collisions · topic 17.1-FR3 | Protection Engineering Consultants LLC · Texas | Department of Transportation | SBIR Phase II | $259.8K | 2020-04-22 |
| Resilient Wayside Structures to Reduce Severity of Passenger Equipment Collisions and Derailments · topic 171FR3 | Protection Engineering Consultants LLC · Texas | Department of Transportation | SBIR Phase II | $294.5K | 2018-07-10 |
| Resilient Wayside Structures and Passenger Car Survivability · topic 171FR3 | Protection Engineering Consultants LLC · Texas | Department of Transportation | SBIR Phase I | $149.9K | 2017-05-30 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.